ARFQ DEP22-063 Farnsworth #2 Technical Specifications.pdf

PDF 3 MB Posted

Attached to
Farnsworth #2 Well Plugging API# 47-105-01379
Solicitation number
ARFQ 0313 DEP2200000063 6
Issued by
Wetzel County, West Virginia

About this file

Technical Specifications Summary: Farnsworth #2 Well Plugging Project

This document is a technical specifications file issued by the West Virginia Department of Environmental Protection (WVDEP), Office of Oil and Gas, for the plugging and remediation of the abandoned Farnsworth #2 oil and natural gas well (API# 47-105-01379) located at 542 Goose Creek Road, Walker, WV 26180, in Wirt County. The project encompasses comprehensive well plugging services including site preparation, well cleanup to total depth, installation of prescribed cement plugs, site reclamation, and removal of temporary stream crossings. The contractor must provide all equipment, materials, labor, and professional services in accordance with West Virginia Code 22-6-23, 22-6-24, and applicable regulations. Work is scheduled for Monday through Friday, maximum ten-hour workdays, unless otherwise approved by the Department. The project includes construction of two stream crossings—one across Goose Creek (authorized under U.S. Army Corps of Engineers Nationwide Permit No. 14, approval reference LRH-2020-0088-LKR) and one across Fox Run (requiring no specific authorization)—to access the well site.

The technical specifications outline forty individual line items for billing purposes, including rig and crew operations (minimum three-person crew), mobilization and demobilization (fifty percent upon completion, remainder with final invoice), heavy equipment (bulldozer, excavator, skid steer), materials (cement, casing, tubing, culverts, gravel, topsoil), specialized tools and equipment rentals, waste disposal services (gel, liquid waste, solid waste), and site reclamation. Pricing is structured variously as hourly rates, per-unit charges, per-day rates, lump-sum amounts, or per-ton charges as specified for each line item. Administrative costs are capped at three percent of the total bid amount and remain fixed for the contract duration. The Department will obtain and pay for all local, state, and federal permits; the contractor is responsible for daily time and material tracking. A Project Coordinator from the WVDEP's Abandoned Well Plugging Program will oversee contract execution and serve as the primary point of contact for the contractor.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FARNSWORTH #2 WELL PLUGGING PROJECT (API# 47-105-01379)

WEST VIRGINIA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

OFFICE OF OIL AND GAS

COUNTY

OF

WIRT

FARNSWORTH #2 PLUGGING PROJECT

API #47-105-01379

TECHNICAL SPECIFICATIONS

Table of Contents

I. PROJECT DESCRIPTION

1.0 Location/Site Description

2.0 Directions to site

II SCOPE OF WORK

III. GENERAL CONDITIONS

1.0 Administrative

2.0 Permitting

3.0 Work

IV. WELL DESCRIPTION

V. REMEDIATION AND/OR PLUGGING WORK PLAN

VI. TECHNICAL SPECIFICATIONS

1.0 Rig and Crew -Three (3) Man Crew (minimum)

2.0 Mobilization & Demobilization

3.0 Additional Labor

4.0 Vacuum Water Truck

5.0 Heavy Equipment

6.0 Power Tongs

7.0 Pipe Cutting

8.0 Casing and Tubing Purchase

9.0 Casing, Tubing, and Pipe Rentals

10.0 Tri-Cone Drill Bit

11.0 Trash Pump

12.0 On-Site Water Storage Container(s)

13.0 Disposal of Gel

14.0 Disposal of Liquid Waste

15.0 Disposal of Solid Waste

16.0 Aqua Gel

17.0 Cement

18.0 Gravel

19.0 Steel Mud Pit

20.0 Site Reclamation

21.0 Silt Fence

22.0 Monument

23.0 Welder/Cutting Torch

24.0 Oil Absorbent Supplies

25.0 Sand Pump

26.0 Cherry Picker

27.0 Casing/Tubing Spear

28.0 Overshot

29.0 Impression Block

30.0 Subs

31.0 Power Swivel

32.0 Concave Mill

33.0 Logging, GR/CCL /Caliper/Bond

34.0 Mud/mixing pump

35.0 Tie Mats

36.0 Topsoil

37.0 Administrative Cost

38.0 Casing perforation by shooting.................................... Error! Bookmark not defined.

39.0 Culvert

VII. EVIDENCE OF TITLE

VIII. APPENDIX A – WELL RECORDS

IX. APPENDIX B – USACE NATIONWIDE PERMIT NO. 14 VERIFICATION

I. PROJECT DESCRIPTION

This project involves the plugging and/or remediation of abandoned oil and/or natural gas wells and sites at the location described below.

1.0 Location/Site Description

Physical Address: 542 Goose Creek Rd.

Walker, WV 26180

Parcel Description: FARNSWORTH HARVEY R JR & JUDITH ANN

FARNSWORTH (TRUSTEE

ID: 53-02-0003-0012-0000

DESC: GOOSE CREEK 334 2/5 AC SUR

GPS Coordinates: 39.1463° E; -81.3314° W (Green Gate)

2.0 Directions to site

From the Charleston Area:

Take I-77 N towards Parkersburg. Take Exit 174. At the bottom of the ramp turn left onto Route 47 east toward Freeport, go approximately 16 miles. Turn left off onto Goose

Creek Road (County Road 2/1) travel north on Goose Creek 6/10 mile. The site is on the right. The entrance is at a green farmgate. From there the well is 4/10 mile but is on the opposite side of Goose Creek. Note, most likely you will park at or just inside the green gate and walk to the well site

Approaching from the Parkersburg Area:

Take I-77 S to exit 174 Staunton Ave/WV-Rte.47. Turn left on Rte. 47 E. Follow the same directions as above.

II SCOPE OF WORK

The Contractor, the Contractor’s agents, representatives, and subcontractors (“Contractor”) shall provide all equipment, materials, labor, and professional services for the plugging of the oil and/or natural gas well(s) identified herein, and the reclaiming of all land disturbed in association with those plugging operations in accordance with West Virginia Code §§ 22-6-23, 22-6-24, and all rules promulgated thereunder.

This project is defined by, and subject to, the following documents attached hereto or included as part of supplemental documentation made available as part of the solicitation request (“Contract”):

I. Project Description

II. Scope of Work

III. General Conditions

IV. Well Description

V. Remediation and Plugging Work Plan

VI. Technical Specifications

VII. Evidence of Title

VIII. Appendix A – Well Records

IX. Appendix B – USACE NWP 14 Verification

III. GENERAL CONDITIONS

In addition to the Standard Terms & Conditions for Construction and Reclamation, the following conditions govern this Contract:

1.0 Administrative

A. The Contract shall be overseen by DEP by an inspector specialist/project coordinator from the Abandoned Well Plugging Program. DEP may, situationally, assign alternate or assistant coordinators as staffing needs vary.

B. The Project Coordinator for the contract will be designated at the time of the issuance of the Notice to Proceed.

C. The Project Coordinator shall serve as the first point of contact for the Contractor in all matters related to the Contract.

D. The Contractor shall notify the Project Coordinator of any work stoppages or changes to planned operators at soon as practically possible.

E. All change order requests shall be submitted to the Project Coordinator for approval prior to the initiation of any work related to that change order request.

2.0 Permitting

A. Upon award of the Contract to the successful bidder, the Department shall transfer the well to and issue the plugging permit under the responsible party name, UNKNOWN

- DEP PAID PLUGGING CONTRACT.

B. The plugging portion of the Remediation and Plugging Work Plan included herein

(Section V) shall be incorporated as part of the plugging permit. This plan is developed based on best available information. Should field observations during plugging operations necessitate deviations from this plan, the Department and

Contractor shall cooperate to develop alternate plans in full compliance with all applicable rules and regulations.

C. All work performed under the Contract must be completed in accordance with the most current version of the Erosion and Sediment Control Field Manual.

D. Unless otherwise specified in the Technical Specifications and/or Bid Sheet, the

Department will obtain and pay for all Local, State, and Federal permits necessary for the completion of the Contract. Any permit conditions contained within said permits shall become mandatory inclusions in the Contract.

3.0 Work

A. Contractor shall perform Contract work (i.e., site preparation and permitted well work) during the days of Monday through Friday. Work will not be conducted on weekends or state/national holidays except with Department approval or during emergency situations. A workday is defined as a maximum of ten (10) hours;

however, additional hours may be worked with Department approval or during emergency situations.

B. Contractor is responsible for tracking daily time and material utilization for the purpose of invoicing. The Department shall confirm daily expenditures at the conclusion of each workday. Any disputes related to time and/or material usage determinations should be made in writing to the Project Coordinator.

C. All in-stream work required in association with the project shall be performed in accordance with all applicable local, state, and federal requirements.

D. Toilet facilities will be provided by the vendor but will not be a separate line item in the contract.

IV. WELL DESCRIPTION

Well detail:

The Office of Oil and Gas has no well record for the referenced well. The well has no casing above the surface. There is a possibility that 7” casing could be found sub surface. The well appears to have been drilled for oil production. Currently the well is leaking oil and salt water at the surface of the bore. The plugging procedure will be created using reference well 085-01666.

The well record shows TD @ 869’, oil shows @ 829’, coal shows @ 783’, and fresh water shows @ 76’. The record shows 8 ¼” casing to a depth of 190’ and 6 ⅝” casing to a depth of 820’. Cemented casing is unknown. There is a possibility you could encounter rods and tubing below surface. There are no tanks associated with this well plugging. The producing formation is the Cow Run. The Office of Oil and Gas will provide all required permits for this project, whether internal or other agencies. OOG will contact West Virginia 811 (“Miss Utility”) to have all known sub surface utilities located and marked.

Site-based considerations:

To access the well site, two bridges will need to be constructed. First stream crossing is Goose Creek, and second stream crossing is Fox Run. WVDEP has applied for, and received, approval from the U.S. Army Corps of Engineers authorizing the construction of the Goose Creek stream crossing (See Appendix B), LRH-2020-0088-LKR-Goose Creek; however, the nationwide permit under which approval was granted (NWP No. 14) is expected to be modified, reissued, or revoked on March 18, 2022. WVDEP will seek re-approval at that time. The Fox Run crossing does not require specific authorizations under NWP.

The existing service road to the well site will need to be reconditioned, including removing trees, brush, and debris. A stone base, drainage ditches, and sediment controls will be installed where needed. The well site has trees and brush that will need to be cut and removed. The contaminated soil at the well site shall be excavated and hauled to the approved landfill. All contaminated soil that is removed from the well site shall be replaced with new soil. The estimated depth 24”. A conductor/cellar shall be installed in the well bore for well control. The well site is mostly flat with mature trees and underbrush.

NOTE: All trees, brush, and debris that are cut or trimmed from the service road or well site shall be hauled to offsite disposal. Once the well has been plugged, the bridges shall be removed. The well site and service road will be reclaimed to the specifications set forth by the Office of Oil and Gas.

V. REMEDIATION AND/OR PLUGGING WORK PLAN

Contract work may require site remediation of the well site prior to the commencement of plugging operations.

Project will commence, generally, as follows:

1. Pre-mobilization site remediation, if necessary,

2. Site preparation,

3. Connect rig to well,

4. Clean out well to total depth,

5. Set prescribed plugs and monument,

6. Reclaim site including removal of stream crossings, and

7. Submit invoice to DEP.

Proposed Work Plan:

1. Notify Project Coordinator (PC) within 24 hours of plugging commencement.

2. Move in and rig up to existing 24-inch conductor casing. The conductor casing currently extends 30 inches above ground level. (Conductor casing to be installed by the plugging contractor.)

3. Trip in hole (TIH) check total depth (TD) @ or below 630'. If TD cannot be reached begin cleaning out hole to approved depth/TD by PC.

4. Once TD has be reached and approved by PC, a bond log will be run inside any casing found to determine casing depth cement bonding location, free points, and casing cuts.

5. TIH to estimated TD @ 900’ or inspector approved depth with tubing and set 170’ cement bottom hole and coal seam plug from 900’ to 730’ TOH. Wait on concrete

(WOC), tap top of plug. Add cement if needed.

6. TIH spot 6% gel to 720’. Set 100’ cement elevation plug from 720’ to 620’ TOH WOC.

Tag plug and add cement if needed.

7. TIH spot 6% gel to 478’. Set 100’ cement plug for oil show from 478’ to 378’ TOH.

WOC, tag plug and add cement if needed.

8. TIH spot 6% gel to 128’. Set 128’ cement plug for surface/fresh water from 128’ to surface.

9. Rig down and install monument, reclaim site.

NOTE.. Any casing found in the well without cement in the annulus that cannot be retrieved must be perforated and cemented at all saltwater, freshwater, coal, gas, casing shoe and elevation points.

VI. TECHNICAL SPECIFICATIONS

1.0 Rig and Crew -Three (3) Man Crew (minimum)

Description:

The rig is a mobile platform from which well work is performed. The rig crew are the persons needed to adequately operate the rig.

Functional/performance requirements:

The rig must be a mobile rig, capable of pulling 150 percent of the heaviest hook load anticipated. Rig shall have the ability to use both cable tools and rotary type equipment.

Rig will be equipped with a walking beam and cable tools such as stinger, drill stem, jars, bailers of various sizes, an assortment of cable tool bits, a sinker bar, and well control devices. The rig crew will consist of, at a minimum, three persons – a rig operator, two hands, and a pickup truck.

Measurement and Payment:

Item is bid per hour of operation. Hours charged will be for on-site work only. Daily transportation to and from the job site is not included and will not be charged separately.

At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Additional Labor’ or ‘Heavy Equipment.’)

Labor hours for Rig and Crew are payable only after the point in time in which the rig has been set up and connected to the well. Rig set up prior to well connection is considered

Mobilization.

2.0 Mobilization & Demobilization

Description:

Mobilization and demobilization, collectively, encompasses the labor and equipment necessary to transport all contract equipment, tools, and materials to and from the project site. Mobilization and demobilization pricing includes all equipment on the contract at the time of the bid. Mobilization of the rig includes all setup up to the point that the rig is connected to the well. Transportation costs for any other unanticipated equipment needs that may arise will be resolved through the Change Order process, if necessary.

Functional requirements:

All necessary trucking must include operator with a valid Commercial Driver’s License

(CDL).

Measurement and Payment:

Item is bid as a service, with half the total bid amount payable after mobilization has occurred (50.0%), and the remainder payable with the final invoice.

3.0 Additional Labor

Description:

Additional labor is general labor performing tasks not included in the rig crew bid. This labor may be assisting by performing tasks the rig crew does not have time to complete or may be performing tasks not included in the actual well work.

Measurement and payment:

This item is bid per worker per hour. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew’ or ‘Heavy Equipment.’)

4.0 Vacuum Water Truck

Description:

A vacuum truck is a tank truck that has a pump and a tank designed to pneumatically suck liquids, sludges, slurries, or similar fluids into the tank of the truck for the purposes of transporting that material to another location. In this contract, the vacuum water truck will be used to deliver water to site, dispose of plugging fluids and may assist in controlling fluid returns from the well bore site.

Functional requirements:

Vacuum water truck must include all hoses and connections needed as well as operator.

Measurement and payment:

This item is bid per hour of operation and includes operator. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew’ or ‘Heavy Equipment.’)

5.0 Heavy Equipment

Description:

Equipment shall be used in construction and reclamation of site and access road, and in the moving of tools and equipment during the plugging operations.

Functional requirements:

Bulldozer must have winches and tilt blades and will be used for grading and the spotting of equipment. Excavator must be a tracked machine. Skid Steer will be used to move dirt, debris and equipment at the well site. Note: horsepower and weight will be verified by reviewing the specifications of the model(s) selected by the vendor.

1. Bulldozer (minimum 85 horsepower and minimum weight 16,000 pounds.)

2. Excavator (minimum 85 horsepower and minimum weight 25,000 pounds.)

3. Skid Steer (minimum 24 HP, 700# rated capacity or equivalent.)

Measurement and payment:

This item is bid per hour of operation and includes labor. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew or

‘Additional Labor.’)

6.0 Power Tongs

Description:

Power tongs are large-capacity self-locking wrenches used to grip drill string components and apply torque. Power tongs are used to assemble and disassemble tubulars and casings.

Functional requirements:

The following sizes may be needed for this project.

1. 4 ½ inches or smaller

2. Over 4 ½ inches up to 8 5/8 inches

3. 8 5/8 inches up to 10 ¾ inches

Measurement and payment:

This item is bid per day of use.

7.0 Pipe Cutting

Description:

Pipe cutting is the separation of tubing and casing found in the well bore. This may be accomplished in various ways including, but not limited to, the use of cable tools with a knife and rotary type cutting tools which require the use of the rig.

Functional Requirements:

The sizes listed below may be needed for this project.

1. 3 ½ inches or smaller

2. 4 1/2 inches to 8 5/8 inches

Measurement and payment:

This item is bid per cut.

8.0 Casing and Tubing Purchase

Description:

Casing and tubing are pipes of a specified diameter lowered into the borehole to serve as a conduit for fluids or to provide borehole structural stability. The casing and tubing purchase is necessary when casing and tubing must be left in the well bore, and when casings need to be lengthened to nipple up for physical connection to the rig. Slips and elevators will be provided by the contractor.

Functional requirements:

The following sizes may be needed.

1. 24-inch conductor casing

2. 10 ¾ -inch conductor casing

Measurement and payment:

This item is bid per foot.

9.0 Casing, Tubing, and Pipe Rentals

Description:

Casing and tubing are pipes of a specified diameter lowered into the borehole to serve as a conduit for fluids or to provide borehole structural stability. The casing, tubing, drill pipe, and drill collar rentals are needed when tubing and casings may be used in the well bore and recovered in such instances.

Functional requirements:

This will include various sizes that will be determined by the well bore. Slips and elevators will be provided by the contractor.

1. Tubing, 1 ½ inches to 2 3/8 inches

2. Drill Pipe (PAC 50 or equivalent)

3. Drill Collar, 2 7/8 inches

Measurement and payment:

This item is bid per foot.

10.0 Tri-Cone Drill Bit

Description:

The drill bit is the tool used to cut or crush rock during well drilling. A Tri-cone bit will be used to drill out fill-up found in the well bore.

Functional requirements:

Tri-cone bit include bit sub and a float.

1. 4 ¾ inches to 6 ¼ inches

2. 6 ½ inches to 8 ¼ inches

Drill bit shall be in used condition.

Measurement and payment:

This item is bid per bit.

11.0 Trash Pump

Description:

The trash pump is used to transfer water and other plugging fluids between locations.

Functional and Performance requirements:

The trash pump must be a minimum three (3) inches and shall be of industrial grade with all hoses and fittings included.

Measurement and payment:

This item is bid per hour of use.

12.0 On-Site Water Storage Container(s)

Description:

The water storage container(s) must hold at a minimum one hundred (100) barrels and will be used for the storage of fresh water for use in the plugging operation.

This item is bid per container.

13.0 Disposal of Gel

Description:

There are instances where gel fluids from the plugging operations may need to be disposed of, in which case they shall be hauled to a certified landfill.

Measurement and payment:

This item is bid per barrel and does not include trucking cost. Copies of scale tickets from a certified landfill shall be provided to the Department.

14.0 Disposal of Liquid Waste

Description:

There are instances where saltwater or other Class II fluids are returned to the surface due to the plugging operations and must be disposed of at an Underground Injection Control

(UIC) well. The contactor will transport the saltwater or other Class II fluids to a UIC well for disposal.

Measurement and payment:

This item is bid per barrel and does not include trucking cost. Manifest and invoice from disposal facility shall be provided to the Department.

15.0 Disposal of Solid Waste

Description:

Solid waste, including contaminated soil, disposal will be the responsibility of the contractor.

Measurement and payment:

This item is bid per ton and does include trucking cost. Per-ton bid should also include costs for analytical profiling of solid waste, if required by the certified landfill. Copies of scale tickets from a certified landfill shall be provided to the Department.

16.0 Aqua Gel

Description:

Gel is a mixture of water and bentonite clay mixed to desired weight. Aqua gel will have dual use, it will be used to increase the viscosity of the drill fluid and as spacers between the cement plugs. The Aqua Gel will be mixed, pumped, and delivered to site.

Measurement and payment:

This item is bid per fifty (50) pound sack. Larger unit quantities of gel may be used on-site but bid prices should be standardized to the fifty (50) pound sack.

17.0 Cement

Description:

Portland Class A Cement shall be used to cement casings and tubulars in the well bore and for cement plugs.

Performance requirements:

Cement will be a Portland Class A cement with no other additives.

Measurement and payment:

This item is bid per standard ninety-four (94) pound sack delivered to site. Pricing is to include mixing and pumping. Larger unit quantities of cement may be used on-site (i.e., “Super Sacks”), but bid prices should be standardized to the ninety-four-pound sack equivalent.

18.0 Gravel

Description:

Gravel is used for a variety of applications including roadbuilding and site stabilization.

Functional requirement:

Gravel will be limestone and size will be determined by the application for which it is being used.

Measurement and payment:

This item is bid per ton delivered to site. This price will include trucking to site.

19.0 Steel Mud Pit

Description:

The mud pit is a large tank that contains drilling fluids on-site. Mud pits may also be used to store plugging fluids from the well.

Functional requirement:

The mud pit shall be constructed of steel and have a divider to expedite the settling of cuttings and debris flushed from the well bore.

Measurement and payment:

This item is bid per mud pit.

20.0 Site Reclamation

Description:

Site reclamation is the process of restoring the well site area back to original condition.

Site reclamation generally requires earth work and a combination of lime, fertilizer, seed, and mulch, as appropriate.

Performance Requirements:

Site reclamation shall be completed in accordance with the provisions described in the

West Virginia Erosion and Sediment Control Field Manual – May 2012.

https://dep.wv.gov/oil-and-gas/Documents/Erosion%20Manual%2004.pdf.

Measurement and payment:

This item is bid as a lump sum for all materials needed to complete site reclamation including the soil borrow area, if applicable. Labor for the completion of site reclamation activities shall be billed as ‘additional labor.’

21.0 Silt Fence

Description:

A silt fence is a temporary sediment control device used on construction sites to protect water quality in nearby streams, rivers, lakes, and seas from sediment in stormwater runoff.

Functional requirements:

Silt Fence shall be supplied with stakes pre-attached and will be installed prior to site construction. Silt fence will also be removed at the completion of reclamation.

Measurement and payment:

This item is bid per foot.

22.0 Monument

Description:

The monument is the permanent marker indicating the location of the plugged well.

Functional requirements:

Monument and its installation will meet all the requirements in 35 CSR 4 – 5.5.b.

The monument will be a minimum of six (6) inches in outside diameter.

The monument will extend minimum of thirty (30) inches above final grade and not less than ten (10) feet below the surface.

The monument will have the well’s API Number attached.

http://apps.sos.wv.gov/adlaw/csr/readfile.aspx?DocId=16899&Format=PDF.

Measurement and payment:

This item is bid per monument.

23.0 Welder/Cutting Torch

Description:

A welder/cutting torch is necessary for the fusing or cutting of metal components.

Measurement and payment:

This item is bid per hour of use and includes operator. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Additional Labor’ or

‘Heavy Equipment.’)

24.0 Oil Absorbent Supplies

Description:

Oil Absorbent Supplies are used to absorb and contain oil as directed by the DEP.

Functional requirements:

1. Booms will be bid per boom and must be a minimum of ten (10) feet in length.

2. Absorbent pads will be bid by the bundle, pads must be a minimum of two (2) feet by two (2) feet.

3. Peat sorb will be bid per fifty (50) pound bag.

4. Plastic roll - (100 feet by 50 feet), twenty (20) mil (0.02inch) minimum thickness, bid per roll.

Measurement and Payment:

Items are bid as described above.

25.0 Sand Pump

Description:

A sand pump is a syringe-type tool typically between four (4) and six (6) inches in diameter used to pump sand and cuttings from the well bore.

Functional requirements:

The well bore size will determine the size of the sand pump used.

Measurement and payment:

Item is bid per pump.

26.0 Cherry Picker

Description:

A cherry picker is a tool used to retrieve items from the well bore and drill out wooden plugs. This tool is run on the stem and is used in conjunction with jars.

Functional requirements:

The cherry picker will be a four (4) to eight (8) in diameter tubular four (4) feet in length with a tapered hole and slot. The well bore diameter will determine the precise size of cherry picker.

Item is bid per cherry picker.

27.0 Casing/Tubing Spear

Description:

Casing/Tubing Spear is a grapple tool that will go inside of tubing that is inside of the well bore.

Functional requirements:

Size will be determined by tubing encountered.

1. Tubing Spear 1inch to 3 ½ inches

2. Casing Spear 4 ½ inches to 10 ¾ inches

Measurement and payment:

Item is bid per spear.

28.0 Overshot

Description:

Overshot is a grapple tool used to retrieve tubular pipe and casing by going over the outside of item being fished.

Functional requirements:

Size to be determined by the size of the fish. All grapples and working components must be included.

1. 1 inch to 3 1/2 inches

2. 4 ½ inches to 8 5/8 inches

Item is bid per tool.

29.0 Impression Block

Description:

The impression block is a wax block affixed to the bottom of fishing tools to allow for the creation of an impression of hole contents to assist in fishing operations.

Measurement and payment:

Item is bid per impression block.

30.0 Subs

Description:

A sub is a short, threaded piece of pipe used to adapt parts of the drilling string that cannot otherwise be screwed together because of differences in thread size or design.

Subs may be needed to change over to drill pipe or to retrieve casing from the well bore.

Measurement and payment:

This item is bid per sub.

31.0 Power Swivel

Description:

The power swivel is a mechanical device that suspends the weight of the drill string. It is designed to allow rotation of the drill string beneath it, conveying high volumes of high-pressure drilling mud between the rig's circulation system and the drill string.

Functional requirements:

The power swivel must be a minimum of a twenty-five (25) ton hydraulic unit. The

Power Swivel must include the Power Unit with hoses and connections, also includes two

Saver Subs (one for Drill Pipe and one for Drill Collars).

This item is bid per hour of use.

32.0 Concave Mill

Description:

A mill is a tool that grinds metal downhole, typically to remove junk or parts of a casing string.

Functional requirements:

Mills will include subs needed.

1. 4 ¾-inch mill

2. 6 ¼-inch mill

Measurement and payment:

Item is bid per mill.

33.0 Logging, Bond with CCL

Description:

Logging includes all labor, equipment, and material necessary to determine various characteristics of the well and using probative tools suspended from a wire line. Bond logs with casing collar locator (CCL) allows for a determination of the cement bond quality behind the casing and identify the free point of any casing strings present in the well.

Additionally, shots (e.g., collar busters, perf balls) are commonly employed in conjunction with logging runs to cause the perforation or separation of pipe where conventional rig methodologies are impossible or impractical.

Item is bid per log run and will include the cost of shots. Logging includes all labor, equipment, and materials required to complete logging run and perforation/shooting, if necessary.

34.0 Mud/mixing pump

Description:

A mud pump is a reciprocating piston/plunger pump designed to circulate drilling fluid under high pressure down the drill string and back up the annulus.

Functional requirements:

This pump must have a minimum of five (5) inch diameter with a seven (7) inch stroke length or larger, and able to supply volumes and pressure as needed. It will include hoses and connections capable of handling the pump output.

Measurement and payment:

Item is bid per hour of use.

35.0 Tie Mats

Description:

Tie mats are portable structures used to support the weight of heavy equipment.

Functional requirements:

Minimum size 4’ x 12’. Tie mats may be constructed of natural or synthetic materials.

Item is bid per mat for the duration of the project.

36.0 Topsoil

Description:

The excavated area may need to be backfilled with topsoil. The quantity of topsoil will be based on the quantity of soil disposed minus the amount of gravel that is placed along the well.

Measurement and payment:

Item is bid per ton and includes excavation from the borrow area, if applicable, transportation to the site and equipment and labor to level the site. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew’ or ‘Heavy Equipment.’)

37.0 Administrative Cost

Description:

In execution of the contract, the contractor may encounter various required administrative costs, including, but not limited to insurance or bonding premiums. These costs may be billed back under this line item.

Measurement and payment:

Items is bid as a service, not exceeding 3.00% of total bid amount. Bid amount is fixed for the life of the contract and may not be modified.

38.0 Culvert

Description:

Access to the well site requires the construction of bridges across both Goose Creek and Fox Run. It is anticipated that culverts of the following size will be needed (diameter x length):

1. 24” x 20’ (twenty-four inches by twenty feet)

2. 36” x 20’ (thirty-six inches by twenty feet)

3. 48” x 20’ (forty-eight inches by twenty feet)

Functional requirements:

WVDEP has verification from by the U.S. Army Corps of Engineers (USACE) that the construction of the Goose Creek stream crossing is covered under NWP 14. This authorization allows the contractor to upgrade the existing service road that connects the well site to Co Rte 2/ and construct a bridge across Goose Creek (approximately eighty feet (80’) across) utilizing a system of thirty-six inch (36”) vented culverts twenty feet (20’) in length countersunk into the stream bed and covered with a minimum of two inches (2”) of limestone gravel.

Access to the well site also requires the installation of a stream crossing across Fox Run.

This crossing will not require a USACE permit. The bridge will be constructed of a system of twenty-four inch (24”) and forty-eight inch (48”) vented metal culverts twenty feet (20’) in length countersunk into the stream bed and covered with a minimum of two inches (2”) of limestone gravel.

Measurement and Payment:

Item is bid for each culvert.

VII. EVIDENCE OF TITLE

VIII. APPENDIX A – WELL RECORDS

IX. APPENDIX B – USACE NATIONWIDE PERMIT NO. 14 VERIFICATION