ARFQ DCR23_206 - Addendum 01.pdf

PDF 340 KB Posted

Attached to
Replacement of Main Entry Doors Project
Solicitation number
ARFQ 0608 DCR2300000206 2
Issued by
Braxton County, West Virginia

About this file

This is an Addendum 01 document issued by the West Virginia Department of Commerce and Regulation (DCR) for solicitation ARFQ 0608 DCR2300000206, dated November 14, 2023. The addendum serves to modify the original solicitation and includes an Addendum Acknowledgment Form that vendors must complete and submit with their bids. A pre-bid meeting was held on November 14, 2023, and at least one vendor, Lee Reger Builds, Inc., signed in as an attendee. The addendum requires vendors to acknowledge receipt of all addenda issued with the solicitation by checking boxes for each addendum received and signing the acknowledgment form; failure to acknowledge addenda may result in bid disqualification.

The document emphasizes that only written information officially added to the specifications through addendum is binding, and any verbal representations made during discussions with state personnel are not enforceable. Vendors must legibly sign in on the pre-bid attendance sheet to maintain eligibility to bid, with one representative per vendor permitted at the meeting. The document contains a vendor acknowledgment form with fields for company information, authorized signature, and date, along with checkboxes for addenda numbers one through ten, though specific details regarding the nature of the modification, pricing terms, or contract scope are not detailed in this addendum document itself.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 6/8/2012

SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]

The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

[ ] Modify bid opening date and time

[ ] Modify specifications of product or service being sought

[ ] Attachment of vendor questions and responses

[ ] Attachment of pre-bid sign-in sheet

[ ] Correction of error

[ ] Other

Description of Modification to Solicitation:

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.

Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

Revised 6/8/2012

ATTACHMENT A

Revised 10/22/2020 - WVDCR

ADDENDUM ACKNOWLEDGEMENT FORM

SOLICITATION NO.:

Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below. Failure to acknowledge addenda may result in bid disqualification. Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.

Addendum Numbers Received:

(Check the box next to each addendum received)

Addendum No. 1 Addendum No. 6 Addendum No. 2 Addendum No. 3 Addendum No. 4

Addendum No. 7 Addendum No. 8 Addendum No. 9

Addendum No. 5 Addendum No. 10

I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.

Company

Authorized Signature

Date

NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.

Solicitation Number:

Date of Pre-Bid Meeting:

Location of Prebid Meeting:

*One Vendor Per Representative - No one individual is permitted to represent more than one vendor at the pre-bid meeting. Any individual that does attempt to represent two or more vendors will be required to select one vendor to which the individual’s attendance will be attributed. The vendors not selected will be deemed to have not attended the pre-bid meeting unless another individual attended on their behalf.

Pre-Bid Sign-In Sheet

Please Note:

Vendors must sign-in on this sheet to verify attendance at the Pre-Bid meeting.

Failure to legibly sign in may be grounds for declaring a vendor ineligible to bid.

For further verification, please also provide a business card if possible.

Firm Represented:* Rep Name (Printed): Firm Address: Telephone #: Fax #: Email:

ARFQ 0608 DCR2300000206

11/14/2023

CRJ&CF

Lee Reger Builds, Inc. One Railroad Street P.O. Box 1872 Shinnstion, WV 26431

304-592-2083 304-592-3920Sheldon E Rober sraber@lrbuildswv.com

Addendum Master.pdf
Addendum 1.pdf
ARFQ DCR23-76 Terms and Conditions.pdf
INSTRUCTIONS TO VENDORS SUBMITTING BIDS
3A. BID SUBMISSION
GENERAL TERMS AND CONDITIONS:
2.2. “Bid” or “Proposal” means the vendors submitted response to this solicitation.
_____________________ for _______________________
DESIGNATED CONTACT: Vendor appoints the individual identified in this Section as the Contract Administrator and the initial point of contact for matters relating to this Contract.
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.:
Text1: ARFQ 0608 DCR2300000206
Text2: 01
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Yes
Check Box8: Off
Check Box9: Off
Text3: 1. Attachment of Pre-bid sign-in Sheet.
Addendum No 1: Off
Addendum No 2: Off
Addendum No 3: Off
Addendum No 4: Off
Addendum No 5: Off
Addendum No 6: Off
Addendum No 7: Off
Addendum No 8: Off
Addendum No 9: Off
Addendum No 10: Off
Company_2:
Authorized_2:
Signature_2:
Date_2:

File details come from the government source that posted it. Updated .