ARFQ 0608 DCR2700000001 - Addendum No. 1.pdf
PDF 150 KB Posted
- Attached to
- Replacement Boiler Tubes Project
- Solicitation number
- ARFQ 0608 DCR2700000001 2
- Issued by
- Pleasants County, West Virginia
About this file
This is an Addendum No. 1 to a Request for Quotation issued by the West Virginia Department of Corrections for a Boiler Tube Replacement Project at Denmar Correctional Center and Jail. The project requires contractors to replace boiler tubes and related components on two boilers (No. 1 and No. 2), including replacement of the A-frame refractory in the rear of both boilers, disposal of existing boiler tubes and removed items, replacement of four gate valves (two per boiler with new 3-inch, 300 psi gate valves), and replacement of sight ports on the back of both boilers. The work must be sequenced such that Boiler No. 1 operates for a minimum of one week after tube replacement to ensure no issues exist before work commences on Boiler No. 2. A mandatory pre-bid sign-in sheet is required. The bid submission deadline has been revised to 10:30 AM on August 18, 2026.
No pricing information, set-asides, incumbent contractor details, funding sources, or contract term information is provided in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARFQ 0608 DCR2700000001
REQUEST FOR QUOTATION
BOILER TUBE REPLACEMENT PROJECT
DENMAR CORRECTIONAL CENTER AND JAIL
BOILER TUBE 1 ADDENDUMS
REPLACEMENT
Addendum No. 1:
Clarifications:
C1: Please see the attached mandatory pre-bid sign-in sheet.
C2: The contractor must replace the A-frame refractory in the rear of boilers no. 1 and 2.
C3: The contractor must dispose of the existing boiler tubes and any items removed from the existing boilers no. 1 and 2.
C4: Once the boiler tubes, etc. have been replaced with boiler no. 1 and it has started up.
Boiler no. 1 must operate a minimum of one (1) week, to make sure there are no issues, before the boiler tubes, etc. for boiler no. 2 are changed.
C5: The contractor must replace the existing two (2) gate valves on the top, per each boiler, with new three (3”) inch, three hundred (300) psi, gate valves. A total of four (4) gate valves must be replaced with new.
C6: The sight ports on the back of boilers no. 1 and 2 must be replaced with new ones.
C7: The bid time and date have changed: 10:30 AM on August 18, 2026.