ARFQ 0608 DCR2600000004 - Exhibit B - Contract Drawings for Reference - Part No. 1.pdf
PDF 32 MB Posted
- Attached to
- HVAC Equipment Replacement Project
- Solicitation number
- ARFQ 0608 DCR2600000004 2
- Issued by
- Calhoun County, West Virginia
About this file
This is a contract drawings reference document for the Mount Olive Correctional Complex and Jail HVAC Equipment Replacement Project, involving the West Virginia Department of Homeland Security, Division of Corrections and Rehabilitation (DCR). The project concerns the replacement of HVAC equipment at the Mount Olive facility in Mount Olive, West Virginia. The document serves as a reference for contract drawings and includes cover sheet and multiple drawing sheets referenced by designation (G0.1, P0.1, P3.32-P3.34, M0.1, M3.32-M3.34, M6.3, M7.2, E0.1, E3.32). The drawings are dated July 26, 2025, and are prepared under the authority of Governor Patrick Morrisey, with Douglas Buffington, II as Acting Cabinet Secretary, and David Kelly as Commissioner of the Division of Corrections and Rehabilitation.
The document is presented as reference material for bidders and does not contain specific pricing terms, set-asides, incumbent information, or detailed funding sources within this particular file. As a drawing reference document, it functions as supporting technical documentation for the ARFQ 0608 DCR2600000004 solicitation, providing the architectural, plumbing, mechanical, and electrical drawings necessary for contractors to develop accurate bids for the HVAC equipment replacement scope of work at the correctional facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOUNT OLIVE CORRECTIONAL COMPLEX AND JAIL
MOUNT OLIVE, WV
HVAC EQUIPMENT REPLACEMENT PROJECT
CONTRACT DRAWINGS FOR REFERENCE: JULY 26, 2025
PATRICK MORRISEY: GOVERNOR
DOUGLAS BUFFINGTON, II: ACTING CABINET SECRETARY - W. V. DEPARTMENT OF HOMELAND SECURITY
DAVID KELLY: COMMISSIONER - W. V. DIVISION OF CORRECTIONS AND REHABILITATION
LANCE YARDLEY: DEPUTY COMMISSIONER - W. V. DIVISION OF CORRECTIONS AND REHABILITATION SCOTT PATTERSON: ASSISTANT COMMISSIONER - W. V. DIVISION OF CORRECTIONS AND REHABILITATION PHILIP FARLEY, II: DIRECTOR OF ENGINEERING, CONSTRUCTION, AND MAINTENANCE - W. V. DCR
| GO.2 |
| A3.33 |
| A3.34 |
| A3.35 |
| P0.1 |
| P3.32 |
| P3.33 |
| P3.34 |
| M0.1 |
| M3.32 |
| M3.33 |
| M3.34 |
| M6.3 |
| M7.2 |
| E0.1 |
| E3.32 |
| G0.1 - Cover Sheet.pdf |
| Sheets and Views |
| G0.1 - Cover Sheet-Cover Sheet |
File details come from the government source that posted it. Updated .