ARFQ 0608 DCR2500000046 - Exhibit B2 - Existing Chiller Drawings.pdf

PDF 18 MB Posted

Attached to
Chiller Replacement Project
Solicitation number
ARFQ 0608 DCR2500000046 4
Issued by
Calhoun County, West Virginia

About this file

This is an Exhibit B2 technical drawing document for ARFQ 0608 DCR2500000046, containing detailed mechanical specifications and diagrams for an existing chiller system. The document provides comprehensive visual references for the chiller installation, including two primary chiller drawings and multiple schematic diagrams that detail the chilled water system infrastructure. The drawings specify critical components and connection points, including secondary return and supply tie-in points, exterior piping configurations, primary supply tie-in points, and the chilled water pump suction and discharge risers. Additionally, the document illustrates the chilled water P&ID (Piping and Instrumentation Diagram), control wiring schematic, drain configuration, and the master water softener integration within the system.

The drawings serve as technical reference materials for bidders and contractors to understand the existing mechanical infrastructure relevant to the contract opportunity. These documents are essential for accurate project scoping, cost estimation, and system modification planning. The inclusion of detailed tie-in points, piping diagrams, and equipment schematics indicates that the project likely involves retrofitting, maintenance, upgrading, or integration work with the existing chiller system. No pricing information, timelines, set-asides, or funding details are contained within this exhibit document, as it functions solely as a technical reference attachment to support the broader solicitation requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chiller Drawing 1

Chiller Drawing 2
Chilled Water Diagram
Chilled Water P & ID
Secondary Return Tie-in Points
Secondary Supply Tie-in Points
Exterior Piping
Primary Supply Tie-in Points
Chilled Water Pump Suction Risers
Chilled Water Pump Discharge Risers
Control Wiring
Drain Master
Water Sofener

File details come from the government source that posted it. Updated .