This is an addendum clarification document for a state contract opportunity issued by the West Virginia Division of Corrections and Rehabilitation for the Tygart Valley Regional Jail and Correctional Facility Auger Monster System Project (ARFQ 0608 DCR2300000180). The addendum removes two specification requirements from section 1.05(C) that previously mandated contractors provide per square footage pricing for wood blocking replacement and metal decking replacement as potential change order items. The deadline for submitting questions remains 2:00 PM Eastern Standard Time on May 1, 2023, and the bid submission deadline is 10:30 AM Eastern Standard Time on May 8, 2023.
The addendum eliminates the need for contractors to include contingency pricing for damaged wood blocking and metal decking replacement in their initial bids, streamlining the bidding process by removing these conditional cost line items from consideration. This clarification simplifies the scope of work and reduces the complexity of bid evaluations for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARFQ 0608 DCR2300000180
Tygart Valley Regional Jail and Correctional Facility
Auger Monster System Project
Addendum No. 2
Clarifications:
C1: The following in specification section 1.05(C), subsections 2 and 3 are deleted from the project:
“2. The contractor must write a per square footage price to replace and install any rotted wood blocking for the project on the “WOOD BLOCKING PER SQUARE FOOTAGE COST BID (IF ANY). This cost will only be used if there is damaged wood blocking that must be replaced. This will be handled as a change order.”
“3. The contractor must write a per square footage price to replace and install any damaged metal decking for the project on the “METAL DECKING PER SQUARE FOOTAGE COST BID (IF ANY). This cost will only be used if there is damaged metal decking that must be replaced.
This will be handled as a change order.”
C2: The deadline for questions to be submitted remains the same: 2:00 PM E. S. T. on May
1, 2023.
C3: The bid time and date remain the same: 10:30 AM E. S. T. on May 8, 2023.