AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Substation Transformer Oil Processing Services
Solicitation number
AR 25-039-MC
Issued by
Polk County, Florida

About this file

The document is a comprehensive pricing sheet (AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx) for the Kissimmee Utility Authority (KUA) soliciting Substation Transformer Oil Processing Services in Osceola County, Florida. The solicitation seeks an annual contract for transformer oil maintenance services, covering seven transformers with oil volumes ranging from up to 6,000 to 6,001-17,000 gallons. The contract encompasses services such as oil drainage, storage, vacuum filling, degasification, dehydration, hot oil flushing, and additional tasks like gasket and bushing replacement. The bid submission deadline is May 6, 2025, at 2:00 PM EST, with a virtual public bid opening via Zoom. The contract is structured for three years with two potential one-year renewal periods, and KUA reserves the right to award to multiple vendors without guaranteeing specific work assignments.

The pricing sheet details firm-fixed pricing for both normal planned and emergency work, with rates that will remain firm for the first year and potential price updates negotiated for subsequent years. The solicitation requires bidders to demonstrate at least four years of experience in substation transformer oil processing and provide four references, including two from utility substations. Insurance requirements are substantial, including $5,000,000 in general liability, $10,000,000 in general aggregate, $5,000,000 in umbrella coverage, and $1,000,000 in workers' compensation. The pricing structure includes various line items with per-job, per-day, and per-unit pricing for different service levels, covering additional services like crew assistance, job extensions, and waste disposal. No specific budget range or set-aside designations are mentioned, and the contract allows for flexibility in service assignments at KUA's discretion.

View the file

Other files

File Type Posted
AR_25-039-MC_Bid_Tabulation_Final.pdf PDF
AR_25-039-MC_Bid_Tabulation_Final.pdf PDF
AR_25-039-MC_Notice_of_Intent.pdf PDF
AR_25-039-MC_Notice_of_Intent.pdf PDF
AR_25-039-MC_Bid_Opening_Tabulation.pdf PDF
AR_25-039-MC_Bid_Opening_Tabulation.pdf PDF
AR_25-039-MC_Bid_Opening_Tabulation.pdf PDF
AR_25-039-MC_Addendum_3_.pdf PDF
AR_25-039-MC_Addendum_3_.pdf PDF
AR_25-039-MC_Addendum_3_.pdf PDF
AR_25-039-MC_Addendum_3_.pdf PDF
AR_25-039-MC_Addendum_3_.pdf PDF
AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx XLSX spreadsheet
AR_25-039-MC_Addendum_2_.pdf PDF
AR_25-039-MC_Addendum_2_.pdf PDF
AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx XLSX spreadsheet
AR_25-039-MC_Addendum_2_.pdf PDF
AR_25-039-MC_Addendum_2_.pdf PDF
AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx XLSX spreadsheet
AR_25-039-MC_Addendum_2_.pdf PDF
AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx XLSX spreadsheet
AR_25-039-MC_Addendum_1_.pdf PDF
AR_25-039-MC_Addendum_1_.pdf PDF
AR_25-039-MC_Addendum_1_.pdf PDF
AR_25-039-MC_Addendum_1_.pdf PDF
AR_25-039-MC_Addendum_1_.pdf PDF
AR_25-039-MC_Pricing_Sheet.xlsx XLSX spreadsheet
AR_25-039-MC_Substation_Transformer_Oil_Processing_Services.pdf PDF
AR_25-039-MC_Pricing_Sheet.xlsx XLSX spreadsheet
AR_25-039-MC_Pricing_Sheet.xlsx XLSX spreadsheet
AR_25-039-MC_Pricing_Sheet.xlsx XLSX spreadsheet
AR_25-039-MC_Substation_Transformer_Oil_Processing_Services.pdf PDF
AR_25-039-MC_Substation_Transformer_Oil_Processing_Services.pdf PDF
AR_25-039-MC_Substation_Transformer_Oil_Processing_Services.pdf PDF
AR_25-039-MC_Pricing_Sheet.xlsx XLSX spreadsheet
AR_25-039-MC_Substation_Transformer_Oil_Processing_Services.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acerno_Cache_XXXXX

TAB ASR

Attachment "A" Price Sheet TAB ASR (1 OF 5)

SUBSTATION TRANSFORMER OIL PROCESSING SERVICES

AR 25-039-MC

Proposer »
NOTE: THIS EXCEL FILE HAS 5 TABS TO LIST PRICING. IT IS MANDATORY TO PROVIDE PRICING ON ITEMS MARKED WITH AN ASTERIX*. FAILURE TO PROVIDE MANDATORY PRICING MAY RESULT IN PROPOSAL DISQUALIFICATION.
NOTE: THE PRICE FOR EACH ITEM IS A "FIRM-FIXED" PRICE, AND INCLUSIVE OF ALL LABOR, SUPERVISION, OVERHEAD, PROFIT, MATERIALS, SUPPLIES, EQUIPMENT, TOOLS, MOBILIZATION/DEMOBILIZATION/ TRAVEL, TRANSPORTATION, HANDLING, FUEL, POWER, ASSESSMENTS, FEES, AND TAXES ETC.
NOTE: PRICES WILL BE FIRM FOR THE FIRST YEAR OF THE AGREEMENT, WITH PRICING UPDATES CONSIDERED AND NEGOTIATED FOR SUBSEQUENT YEARS.
TAB ASR - Additional Service Rates
MATERIAL
ITEMDESCRIPTIONUNIT OF MEASUREPLUS PERCENTAGE
ASR1NON-STANDARD MATERIAL* (Cost Plus %)%
SUBCONTRACTOR SERVICES
ITEMDESCRIPTIONUNIT OF MEASUREPLUS PERCENTAGE
ASR2SUBCONTRACTOR WORK* (Cost Plus %)%
LABOR ASSISTANCE / JOB EXTENSION
ITEMDESCRIPTIONUNIT OF MEASURELABOR RATE
ASR3TAB 1 - CREW ASSISTANCE LABOR RATE *
(BEYOND STANDARD JOB SCOPE)$/HR
ASR4TAB 1 - DEGASIFICATION EXTENSION*
(BEYOND STANDARD JOB HOURS.)$/HR
ASR5TAB 1 - DEHYDRATION EXTENSION*
(BEYOND STANDARD JOB HOURS.)$/HR
ASR6TAB 1 - HOT OIL FLUSHING EXTENSION
(BEYOND STANDARD JOB HOURS.)$/HR
ASR7TAB 2 - CREW ASSISTANCE LABOR RATE *
(BEYOND STANDARD JOB SCOPE)$/HR
ASR8TAB 2 - DEGASIFICATION EXTENSION*
(BEYOND STANDARD JOB HOURS.)$/HR
ASR9TAB 2 - DEHYDRATION EXTENSION*
(BEYOND STANDARD JOB HOURS.)$/HR
ASR10TAB 2 - HOT OIL FLUSHING EXTENSION
(BEYOND STANDARD JOB HOURS.)$/HR
ASR11TAB 3 - CREW ASSISTANCE LABOR RATE *
(BEYOND STANDARD JOB SCOPE)$/HR
ASR12TAB 3 - DEGASIFICATION EXTENSION*
(BEYOND STANDARD JOB HOURS.)$/HR
ASR13TAB 3 - DEHYDRATION EXTENSION*
(BEYOND STANDARD JOB HOURS.)$/HR
ASR14TAB 3 - HOT OIL FLUSHING EXTENSION
(BEYOND STANDARD JOB HOURS.)$/HR
ASR15TAB 4 - CREW ASSISTANCE LABOR RATE *
(BEYOND STANDARD JOB SCOPE)$/HR
ASR16TAB 4 - DEGASIFICATION EXTENSION*
(BEYOND STANDARD JOB HOURS.)$/HR
ASR17TAB 4 - DEHYDRATION EXTENSION*
(BEYOND STANDARD JOB HOURS.)$/HR
ASR18TAB 4 - HOT OIL FLUSHING EXTENSION
(BEYOND STANDARD JOB HOURS.)$/HR
DISPOSAL SERVICES
ITEMDESCRIPTIONUNIT OF MEASUREPLUS PERCENTAGE
ASR19DISPOSABLE OF HAZARDOUS WASTE*

(Cost Plus %)

%
ASR20DISPOSABLE OF USED MATERIAL* (Cost Plus %)%
Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
Company Name:
Contact Name:
Phone Number:
E-mail Address:
Signature:

TAB1

Attachment "A" Price Sheet

SUBSTATION TRANSFORMER OIL PROCESSING SERVICES

AR 25-039-MC

Proposer »
TAB 1 - NORMAL PLANNED WORK

FOR TRANSFORMERS WITH UP TO 6,000 GAL OF OIL

FOR TRANSFORMERS UP TO
ITEMDESCRIPTIONUNIT OF MEASUREPRICE ($)
1.01DRAIN & STORE OIL ONSITE*
(48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN)PER JOB
1.02ADDITIONAL ONSITE OIL STORAGE*
(24HR PERIOD)PER DAY
1.03VACUUM FILLING*
(OIL STORAGE NOT TO BE CHARGED DURING FILL)PER JOB
1.04OIL DEGASIFICATION*PER JOB
XINCLUDED HOURS OF DEGASIFICATION*HOURS
1.05OIL DEHYDRATION*PER JOB
XINCLUDED HOURS OF DEHYDRATION*HOURS
1.06HOT OIL FLUSHINGPER JOB
XINCLUDED HOURS OF HOT OIL FLUSHHOURS
1.07RE-INHIBIT TREATMENTPER JOB
1.08OIL RECLAMATIONPER JOB
1.09GASKET REPLACEMENTPER GASKET
1.10BUSHING REPLACEMENT*PER BUSHING
1.11INTERNAL INSPECTIONPER JOB
1.12PAPER SAMPLEPER JOB
1.13LISCENCED ENGINEER SIGN / SEAL ON REPORTPER
1.14VALVE REPAIRPER VALVE
1.15TRANSFORMER ASSEMBLY OR DISASSEMBLYPER (DIS)ASSEMBLY
1.16COIL RETIGHTENING / RECLAMPINGPER JOB
Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
Company Name:
Contact Name:
Phone Number:
E-mail Address:
Signature:

TAB2

Attachment "A" Price Sheet

SUBSTATION TRANSFORMER OIL PROCESSING SERVICES

AR 25-039-MC

Proposer »
TAB 2 - EMERGENCY WORK

(WEEKENDS/HOLIDAYS/NON-PLANNED)

FOR TRANSFORMERS WITH UP TO 6,000 GAL OF OIL

FOR TRANSFORMERS UP TO
ITEMDESCRIPTIONUNIT OF MEASUREPRICE ($)
2.01DRAIN & STORE OIL ONSITE*
(48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN)PER JOB
2.02ADDITIONAL ONSITE OIL STORAGE*
(24HR PERIOD)PER DAY
2.03VACUUM FILLING*
(OIL STORAGE NOT TO BE CHARGED DURING FILL)PER JOB
2.04OIL DEGASIFICATION*PER JOB
XINCLUDED HOURS OF DEGASIFICATION*HOURS
2.05OIL DEHYDRATION*PER JOB
XINCLUDED HOURS OF DEHYDRATION*HOURS
2.06HOT OIL FLUSHINGPER JOB
XINCLUDED HOURS OF HOT OIL FLUSHHOURS
2.07RE-INHIBIT TREATMENTPER JOB
2.08OIL RECLAMATIONPER JOB
2.09GASKET REPLACEMENTPER GASKET
2.10BUSHING REPLACEMENTPER BUSHING
2.11INTERNAL INSPECTIONPER JOB
2.12PAPER SAMPLEPER JOB
2.13LISCENCED ENGINEER SIGN / SEAL ON REPORTPER
2.14VALVE REPAIRPER VALVE
2.15TRANSFORMER ASSEMBLY OR DISASSEMBLYPER (DIS)ASSEMBLY
2.16COIL RETIGHTENING / RECLAMPINGPER JOB
Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
Company Name:
Contact Name:
Phone Number:
E-mail Address:
Signature:

TAB3

Attachment "A" Price Sheet

SUBSTATION TRANSFORMER OIL PROCESSING SERVICES

AR 25-039-MC

Proposer »
TAB 3 - NORMAL PLANNED WORK

FOR TRANSFORMERS WITH 6,001-17,000 GAL OF OIL

FOR TRANSFORMERS UP TO
ITEMDESCRIPTIONUNIT OF MEASUREPRICE ($)
3.01DRAIN & STORE OIL ONSITE*
(48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN)PER JOB
3.02ADDITIONAL ONSITE OIL STORAGE*
(24HR PERIOD)PER DAY
3.03VACUUM FILLING*
(OIL STORAGE NOT TO BE CHARGED DURING FILL)PER JOB
3.04OIL DEGASIFICATION*PER JOB
XINCLUDED HOURS OF DEGASIFICATION*HOURS
3.05OIL DEHYDRATION*PER JOB
XINCLUDED HOURS OF DEHYDRATION*HOURS
3.06HOT OIL FLUSHINGPER JOB
XINCLUDED HOURS OF HOT OIL FLUSHHOURS
3.07RE-INHIBIT TREATMENTPER JOB
3.08OIL RECLAMATIONPER JOB
3.09GASKET REPLACEMENTPER GASKET
3.10BUSHING REPLACEMENT*PER BUSHING
3.11INTERNAL INSPECTIONPER JOB
3.12PAPER SAMPLEPER JOB
3.13LISCENCED ENGINEER SIGN / SEAL ON REPORTPER
3.14VALVE REPAIRPER VALVE
3.15TRANSFORMER ASSEMBLY OR DISASSEMBLYPER (DIS)ASSEMBLY
3.16COIL RETIGHTENING / RECLAMPINGPER JOB
Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
Company Name:
Contact Name:
Phone Number:
E-mail Address:
Signature:

TAB4

Attachment "A" Price Sheet

SUBSTATION TRANSFORMER OIL PROCESSING SERVICES

AR 25-039-MC

Proposer »
TAB 4 - EMERGENCY WORK

(WEEKENDS/HOLIDAYS/NON-PLANNED)

FOR TRANSFORMERS WITH 6,001-17,000 GAL OF OIL

FOR TRANSFORMERS UP TO
ITEMDESCRIPTIONUNIT OF MEASUREPRICE ($)
4.01DRAIN & STORE OIL ONSITE*

(48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN)

PER JOB
4.02ADDITIONAL ONSITE OIL STORAGE*
(24HR PERIOD)PER DAY
4.03VACUUM FILLING*
(OIL STORAGE NOT TO BE CHARGED DURING FILL)PER JOB
4.04OIL DEGASIFICATION*PER JOB
XINCLUDED HOURS OF DEGASIFICATION*HOURS
4.05OIL DEHYDRATION*PER JOB
XINCLUDED HOURS OF DEHYDRATION*HOURS
4.06HOT OIL FLUSHINGPER JOB
XINCLUDED HOURS OF HOT OIL FLUSHHOURS
4.07RE-INHIBIT TREATMENTPER JOB
4.08OIL RECLAMATIONPER JOB
4.09GASKET REPLACEMENTPER GASKET
4.10BUSHING REPLACEMENTPER BUSHING
4.11INTERNAL INSPECTIONPER JOB
4.12PAPER SAMPLEPER JOB
4.13LISCENCED ENGINEER SIGN / SEAL ON REPORTPER
4.14VALVE REPAIRPER VALVE
4.15TRANSFORMER ASSEMBLY OR DISASSEMBLYPER (DIS)ASSEMBLY
4.16COIL RETIGHTENING / RECLAMPINGPER JOB
Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
Company Name:
Contact Name:
Phone Number:
E-mail Address:
Signature:

File details come from the government source that posted it. Updated .