AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- Substation Transformer Oil Processing Services
- Solicitation number
- AR 25-039-MC
- Issued by
- Polk County, Florida
About this file
The document is a pricing sheet (AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx) for Kissimmee Utility Authority (KUA) in Osceola County, Florida, soliciting bids for Substation Transformer Oil Processing Services. The solicitation seeks to establish an annual contract for transformer oil maintenance services, including drain/fill, storage, dehydrating, and related services. The contract covers transformers with oil capacities up to 17,000 gallons, with separate pricing for normal planned work and emergency work (weekends/holidays/non-planned). The document provides detailed pricing tabs for different transformer oil volumes and service types, with multiple service line items such as oil degasification, dehydration, hot oil flushing, and bushing replacement. KUA reserves the right to award the contract to multiple vendors and does not guarantee specific work assignments.
The pricing sheet includes firm-fixed pricing with specific instructions that prices are inclusive of all labor, supervision, overhead, profit, materials, supplies, equipment, and associated costs. Certain mandatory items are marked with an asterisk, and failure to provide pricing for these could result in proposal disqualification. Prices are guaranteed firm for the first year, with potential pricing updates negotiated for subsequent years. The Additional Service Rates (ASR) tab allows for percentage-based pricing for non-standard materials, subcontractor services, and disposal of hazardous or used materials. The contract appears designed to provide KUA flexibility in transformer maintenance services with transparent, comprehensive pricing structures that cover both standard and emergency scenarios.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acerno_Cache_XXXXX
TAB ASR
Attachment "A" Price Sheet TAB ASR (1 OF 5)
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| NOTE: THIS EXCEL FILE HAS 5 TABS TO LIST PRICING. IT IS MANDATORY TO PROVIDE PRICING ON ITEMS MARKED WITH AN ASTERIX*. FAILURE TO PROVIDE MANDATORY PRICING MAY RESULT IN PROPOSAL DISQUALIFICATION. |
| NOTE: THE PRICE FOR EACH ITEM IS A "FIRM-FIXED" PRICE, AND INCLUSIVE OF ALL LABOR, SUPERVISION, OVERHEAD, PROFIT, MATERIALS, SUPPLIES, EQUIPMENT, TOOLS, MOBILIZATION/DEMOBILIZATION/ TRAVEL, TRANSPORTATION, HANDLING, FUEL, POWER, ASSESSMENTS, FEES, AND TAXES ETC. |
| NOTE: PRICES WILL BE FIRM FOR THE FIRST YEAR OF THE AGREEMENT, WITH PRICING UPDATES CONSIDERED AND NEGOTIATED FOR SUBSEQUENT YEARS. |
| TAB ASR - Additional Service Rates |
| MATERIAL |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE |
| ASR1 | NON-STANDARD MATERIAL* (Cost Plus %) | % | |
| SUBCONTRACTOR SERVICES |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE | |
| ASR2 | SUBCONTRACTOR WORK* (Cost Plus %) | % | ||
| LABOR ASSISTANCE / JOB EXTENSION | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | LABOR RATE | |
| ASR3 | TAB 1 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR4 | TAB 1 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR5 | TAB 1 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR6 | TAB 1 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR7 | TAB 2 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR8 | TAB 2 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR9 | TAB 2 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR10 | TAB 2 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR11 | TAB 3 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR12 | TAB 3 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR13 | TAB 3 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR14 | TAB 3 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR15 | TAB 4 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR16 | TAB 4 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR17 | TAB 4 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR18 | TAB 4 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| DISPOSAL SERVICES |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE |
| ASR19 | DISPOSABLE OF HAZARDOUS WASTE* |
(Cost Plus %)
| % | ||
| ASR20 | DISPOSABLE OF USED MATERIAL* (Cost Plus %) | % |
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB1
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 1 - NORMAL PLANNED WORK |
FOR TRANSFORMERS WITH UP TO 6,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) | |
| 1.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 1.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 1.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 1.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 1.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 1.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 1.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 1.08 | OIL RECLAMATION | PER JOB | ||
| 1.09 | GASKET REPLACEMENT | PER GASKET | ||
| 1.10 | BUSHING REPLACEMENT* | PER BUSHING | ||
| 1.11 | INTERNAL INSPECTION | PER JOB | ||
| 1.12 | PAPER SAMPLE | PER JOB | ||
| 1.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 1.14 | VALVE REPAIR | PER VALVE | ||
| 1.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 1.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB2
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 2 - EMERGENCY WORK |
(WEEKENDS/HOLIDAYS/NON-PLANNED)
FOR TRANSFORMERS WITH UP TO 6,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) | |
| 2.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 2.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 2.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 2.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 2.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 2.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 2.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 2.08 | OIL RECLAMATION | PER JOB | ||
| 2.09 | GASKET REPLACEMENT | PER GASKET | ||
| 2.10 | BUSHING REPLACEMENT | PER BUSHING | ||
| 2.11 | INTERNAL INSPECTION | PER JOB | ||
| 2.12 | PAPER SAMPLE | PER JOB | ||
| 2.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 2.14 | VALVE REPAIR | PER VALVE | ||
| 2.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 2.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB3
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 3 - NORMAL PLANNED WORK |
FOR TRANSFORMERS WITH 6,001-17,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) | |
| 3.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 3.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 3.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 3.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 3.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 3.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 3.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 3.08 | OIL RECLAMATION | PER JOB | ||
| 3.09 | GASKET REPLACEMENT | PER GASKET | ||
| 3.10 | BUSHING REPLACEMENT* | PER BUSHING | ||
| 3.11 | INTERNAL INSPECTION | PER JOB | ||
| 3.12 | PAPER SAMPLE | PER JOB | ||
| 3.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 3.14 | VALVE REPAIR | PER VALVE | ||
| 3.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 3.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB4
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 4 - EMERGENCY WORK |
(WEEKENDS/HOLIDAYS/NON-PLANNED)
FOR TRANSFORMERS WITH 6,001-17,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | |||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) |
| 4.01 | DRAIN & STORE OIL ONSITE* |
(48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN)
| PER JOB | |||
| 4.02 | ADDITIONAL ONSITE OIL STORAGE* | ||
| (24HR PERIOD) | PER DAY | ||
| 4.03 | VACUUM FILLING* | ||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | ||
| 4.04 | OIL DEGASIFICATION* | PER JOB | |
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | |
| 4.05 | OIL DEHYDRATION* | PER JOB | |
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | |
| 4.06 | HOT OIL FLUSHING | PER JOB | |
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | |
| 4.07 | RE-INHIBIT TREATMENT | PER JOB | |
| 4.08 | OIL RECLAMATION | PER JOB | |
| 4.09 | GASKET REPLACEMENT | PER GASKET | |
| 4.10 | BUSHING REPLACEMENT | PER BUSHING | |
| 4.11 | INTERNAL INSPECTION | PER JOB | |
| 4.12 | PAPER SAMPLE | PER JOB | |
| 4.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | |
| 4.14 | VALVE REPAIR | PER VALVE | |
| 4.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | |
| 4.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | |
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
File details come from the government source that posted it. Updated .