- Substation Transformer Oil Processing Services
- Solicitation number
- AR 25-039-MC
- Issued by
- Polk County, Florida
About this file
The file is a pricing sheet (AR_25-039-MC_Pricing_Sheet_-_REV2.xlsx) for the Kissimmee Utility Authority (KUA) soliciting bids for Substation Transformer Oil Processing Services in Osceola County, Florida. The solicitation (AR 25-039-MC) seeks a comprehensive annual contract for transformer oil maintenance services covering seven transformers, with detailed pricing across four service tabs for transformers with oil volumes up to 6,000 gallons and 6,001-17,000 gallons. The contract is structured as a three-year agreement with two potential one-year renewal periods, and the bid submission deadline is May 6, 2025, at 2:00 PM EST, with a virtual public bid opening via Zoom. Bidders are required to demonstrate at least four years of experience in substation transformer oil processing and provide four references, with two specifically from utility substations.
The pricing sheet includes firm-fixed pricing for the first year, with potential price updates negotiated for subsequent years. The comprehensive pricing structure covers various services including oil drainage, storage, vacuum filling, degasification, dehydration, hot oil flushing, re-inhibit treatment, and oil reclamation, as well as additional services like gasket and bushing replacement. The solicitation requires substantial insurance coverage, including $5,000,000 in general liability, $10,000,000 in general aggregate, $5,000,000 in umbrella coverage, and $1,000,000 in workers' compensation. KUA reserves the right to award to multiple vendors without guaranteeing specific work assignments, and no specific set-aside designations for disadvantaged enterprises are mentioned. The pricing sheet is structured to accommodate both normal planned work and emergency services (weekends/holidays/non-planned) with detailed line-item pricing.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acerno_Cache_XXXXX
TAB ASR
Attachment "A" Price Sheet TAB ASR (1 OF 5)
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| NOTE: THIS EXCEL FILE HAS 5 TABS TO LIST PRICING. IT IS MANDATORY TO PROVIDE PRICING ON ITEMS MARKED WITH AN ASTERIX*. FAILURE TO PROVIDE MANDATORY PRICING MAY RESULT IN PROPOSAL DISQUALIFICATION. |
| NOTE: THE PRICE FOR EACH ITEM IS A "FIRM-FIXED" PRICE, AND INCLUSIVE OF ALL LABOR, SUPERVISION, OVERHEAD, PROFIT, MATERIALS, SUPPLIES, EQUIPMENT, TOOLS, MOBILIZATION/DEMOBILIZATION/ TRAVEL, TRANSPORTATION, HANDLING, FUEL, POWER, ASSESSMENTS, FEES, AND TAXES ETC. |
| NOTE: PRICES WILL BE FIRM FOR THE FIRST YEAR OF THE AGREEMENT, WITH PRICING UPDATES CONSIDERED AND NEGOTIATED FOR SUBSEQUENT YEARS. |
| TAB ASR - Additional Service Rates |
| MATERIAL |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE |
| ASR1 | NON-STANDARD MATERIAL* (Cost Plus %) | % | |
| SUBCONTRACTOR SERVICES |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE | |
| ASR2 | SUBCONTRACTOR WORK* (Cost Plus %) | % | ||
| LABOR ASSISTANCE / JOB EXTENSION | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | LABOR RATE | |
| ASR3 | TAB 1 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR4 | TAB 1 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR5 | TAB 1 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR6 | TAB 1 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR7 | TAB 2 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR8 | TAB 2 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR9 | TAB 2 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR10 | TAB 2 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR11 | TAB 3 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR12 | TAB 3 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR13 | TAB 3 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR14 | TAB 3 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR15 | TAB 4 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR16 | TAB 4 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR17 | TAB 4 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR18 | TAB 4 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| DISPOSAL SERVICES |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE |
| ASR19 | DISPOSABLE OF HAZARDOUS WASTE* |
(Cost Plus %)
| % | ||
| ASR20 | DISPOSABLE OF USED MATERIAL* (Cost Plus %) | % |
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB1
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 1 - NORMAL PLANNED WORK |
FOR TRANSFORMERS WITH UP TO 6,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) | |
| 1.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 1.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 1.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 1.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 1.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 1.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 1.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 1.08 | OIL RECLAMATION | PER JOB | ||
| 1.09 | GASKET REPLACEMENT | PER GASKET | ||
| 1.10 | BUSHING REPLACEMENT* | PER BUSHING | ||
| 1.11 | INTERNAL INSPECTION | PER JOB | ||
| 1.12 | PAPER SAMPLE | PER JOB | ||
| 1.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 1.14 | VALVE REPAIR | PER VALVE | ||
| 1.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 1.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB2
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 2 - EMERGENCY WORK |
(WEEKENDS/HOLIDAYS/NON-PLANNED)
FOR TRANSFORMERS WITH UP TO 6,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) | |
| 2.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 2.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 2.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 2.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 2.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 2.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 2.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 2.08 | OIL RECLAMATION | PER JOB | ||
| 2.09 | GASKET REPLACEMENT | PER GASKET | ||
| 2.10 | BUSHING REPLACEMENT | PER BUSHING | ||
| 2.11 | INTERNAL INSPECTION | PER JOB | ||
| 2.12 | PAPER SAMPLE | PER JOB | ||
| 2.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 2.14 | VALVE REPAIR | PER VALVE | ||
| 2.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 2.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB3
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 3 - NORMAL PLANNED WORK |
FOR TRANSFORMERS WITH 6,001-17,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) | |
| 3.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 3.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 3.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 3.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 3.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 3.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 3.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 3.08 | OIL RECLAMATION | PER JOB | ||
| 3.09 | GASKET REPLACEMENT | PER GASKET | ||
| 3.10 | BUSHING REPLACEMENT* | PER BUSHING | ||
| 3.11 | INTERNAL INSPECTION | PER JOB | ||
| 3.12 | PAPER SAMPLE | PER JOB | ||
| 3.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 3.14 | VALVE REPAIR | PER VALVE | ||
| 3.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 3.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB4
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 4 - EMERGENCY WORK |
(WEEKENDS/HOLIDAYS/NON-PLANNED)
FOR TRANSFORMERS WITH 6,001-17,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | |||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) |
| 4.01 | DRAIN & STORE OIL ONSITE* |
(48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN)
| PER JOB | |||
| 4.02 | ADDITIONAL ONSITE OIL STORAGE* | ||
| (24HR PERIOD) | PER DAY | ||
| 4.03 | VACUUM FILLING* | ||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | ||
| 4.04 | OIL DEGASIFICATION* | PER JOB | |
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | |
| 4.05 | OIL DEHYDRATION* | PER JOB | |
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | |
| 4.06 | HOT OIL FLUSHING | PER JOB | |
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | |
| 4.07 | RE-INHIBIT TREATMENT | PER JOB | |
| 4.08 | OIL RECLAMATION | PER JOB | |
| 4.09 | GASKET REPLACEMENT | PER GASKET | |
| 4.10 | BUSHING REPLACEMENT | PER BUSHING | |
| 4.11 | INTERNAL INSPECTION | PER JOB | |
| 4.12 | PAPER SAMPLE | PER JOB | |
| 4.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | |
| 4.14 | VALVE REPAIR | PER VALVE | |
| 4.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | |
| 4.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | |
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |