The document is a comprehensive pricing sheet (AR_25-039-MC_Pricing_Sheet.xlsx) for the Kissimmee Utility Authority (KUA) soliciting Substation Transformer Oil Processing Services in Osceola County, Florida. The solicitation covers transformer oil maintenance services for seven transformers, with a contract structured as a three-year agreement and two potential one-year renewal periods. The bid submission deadline is May 6, 2025, at 2:00 PM EST, with a virtual public bid opening via Zoom. The procurement seeks comprehensive transformer oil services including main tank drain/fill, storage, dehydrating, and related services, with bidders required to demonstrate at least four years of experience in substation transformer oil processing and provide four references.
The pricing sheet details a complex pricing structure with rates for different transformer oil volumes (up to 6,000 gallons and 6,001-17,000 gallons) and service types (normal planned work and emergency services). Pricing is firm-fixed for the first year with potential annual adjustments, and the contract includes extensive line items for services such as oil drainage, storage, vacuum filling, degasification, dehydration, and additional services like gasket and bushing replacement. KUA reserves the right to award to multiple vendors without guaranteeing specific work assignments. The solicitation requires substantial insurance coverage, including $5,000,000 in general liability, $10,000,000 in general aggregate, $5,000,000 in umbrella coverage, and $1,000,000 in workers' compensation, with no specific set-aside designations for disadvantaged enterprises mentioned.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acerno_Cache_XXXXX
TAB ASR
Attachment "A" Price Sheet TAB ASR (1 OF 5)
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| NOTE: THIS EXCEL FILE HAS 5 TABS TO LIST PRICING. IT IS MANDATORY TO PROVIDE PRICING ON ITEMS MARKED WITH AN ASTERIX*. FAILURE TO PROVIDE MANDATORY PRICING MAY RESULT IN PROPOSAL DISQUALIFICATION. |
| NOTE: THE PRICE FOR EACH ITEM IS A "FIRM-FIXED" PRICE, AND INCLUSIVE OF ALL LABOR, SUPERVISION, OVERHEAD, PROFIT, MATERIALS, SUPPLIES, EQUIPMENT, TOOLS, MOBILIZATION/DEMOBILIZATION/ TRAVEL, TRANSPORTATION, HANDLING, FUEL, POWER, ASSESSMENTS, FEES, AND TAXES ETC. |
| NOTE: PRICES WILL BE FIRM FOR THE FIRST YEAR OF THE AGREEMENT, WITH PRICING UPDATES CONSIDERED AND NEGOTIATED FOR SUBSEQUENT YEARS. |
| TAB ASR - Additional Service Rates |
| MATERIAL |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE |
| ASR1 | NON-STANDARD MATERIAL* (Cost Plus %) | % | |
| SUBCONTRACTOR SERVICES |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE | |
| ASR2 | SUBCONTRACTOR WORK* (Cost Plus %) | % | ||
| LABOR ASSISTANCE / JOB EXTENSION | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | LABOR RATE | |
| ASR3 | TAB 1 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR4 | TAB 1 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR5 | TAB 1 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR6 | TAB 1 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR7 | TAB 2 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR8 | TAB 2 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR9 | TAB 2 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR10 | TAB 2 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR11 | TAB 3 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR12 | TAB 3 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR13 | TAB 3 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR14 | TAB 3 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR15 | TAB 4 - CREW ASSISTANCE LABOR RATE * | |||
| (BEYOND STANDARD JOB SCOPE) | $/HR | |||
| ASR16 | TAB 4 - DEGASIFICATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR17 | TAB 4 - DEHYDRATION EXTENSION* | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| ASR18 | TAB 4 - HOT OIL FLUSHING EXTENSION | |||
| (BEYOND STANDARD JOB HOURS.) | $/HR | |||
| DISPOSAL SERVICES |
| ITEM | DESCRIPTION | UNIT OF MEASURE | PLUS PERCENTAGE |
| ASR19 | DISPOSABLE OF HAZARDOUS WASTE* |
(Cost Plus %)
| % | ||
| ASR20 | DISPOSABLE OF USED MATERIAL* (Cost Plus %) | % |
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB1
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 1 - NORMAL PLANNED WORK |
FOR TRANSFORMERS WITH UP TO 6,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE ($) | |
| 1.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 1.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 1.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 1.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 1.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 1.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 1.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 1.08 | OIL RECLAMATION | PER JOB | ||
| 1.09 | GASKET REPLACEMENT | PER GASKET | ||
| 1.10 | BUSHING REPLACEMENT* | PER BUSHING | ||
| 1.11 | INTERNAL INSPECTION | PER JOB | ||
| 1.12 | PAPER SAMPLE | PER JOB | ||
| 1.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 1.14 | VALVE REPAIR | PER VALVE | ||
| 1.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 1.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB2
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 2 - EMERGENCY WORK |
(WEEKENDS/HOLIDAYS/NON-PLANNED)
FOR TRANSFORMERS WITH UP TO 6,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE | |
| 2.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 2.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 2.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 2.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 2.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 2.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 2.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 2.08 | OIL RECLAMATION | PER JOB | ||
| 2.09 | GASKET REPLACEMENT | PER GASKET | ||
| 2.10 | BUSHING REPLACEMENT | PER BUSHING | ||
| 2.11 | INTERNAL INSPECTION | PER JOB | ||
| 2.12 | PAPER SAMPLE | PER JOB | ||
| 2.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 2.14 | VALVE REPAIR | PER VALVE | ||
| 2.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 2.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB3
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 3 - NORMAL PLANNED WORK |
FOR TRANSFORMERS WITH 6,001-17,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | ||||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE | |
| 3.01 | DRAIN & STORE OIL ONSITE* | |||
| (48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN) | PER JOB | |||
| 3.02 | ADDITIONAL ONSITE OIL STORAGE* | |||
| (24HR PERIOD) | PER DAY | |||
| 3.03 | VACUUM FILLING* | |||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | |||
| 3.04 | OIL DEGASIFICATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | ||
| 3.05 | OIL DEHYDRATION* | PER JOB | ||
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | ||
| 3.06 | HOT OIL FLUSHING | PER JOB | ||
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | ||
| 3.07 | RE-INHIBIT TREATMENT | PER JOB | ||
| 3.08 | OIL RECLAMATION | PER JOB | ||
| 3.09 | GASKET REPLACEMENT | PER GASKET | ||
| 3.10 | BUSHING REPLACEMENT* | PER BUSHING | ||
| 3.11 | INTERNAL INSPECTION | PER JOB | ||
| 3.12 | PAPER SAMPLE | PER JOB | ||
| 3.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | ||
| 3.14 | VALVE REPAIR | PER VALVE | ||
| 3.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | ||
| 3.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | ||
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
TAB4
Attachment "A" Price Sheet
SUBSTATION TRANSFORMER OIL PROCESSING SERVICES
AR 25-039-MC
| Proposer » |
| TAB 4 - EMERGENCY WORK |
(WEEKENDS/HOLIDAYS/NON-PLANNED)
FOR TRANSFORMERS WITH 6,001-17,000 GAL OF OIL
| FOR TRANSFORMERS UP TO | |||
| ITEM | DESCRIPTION | UNIT OF MEASURE | PRICE |
| 4.01 | DRAIN & STORE OIL ONSITE* |
(48HRS OF OIL STORAGE INCLUDED W THIS PRICE. OIL STORAGE NOT TO BE CHARGED DURING DRAIN)
| PER JOB | |||
| 4.02 | ADDITIONAL ONSITE OIL STORAGE* | ||
| (24HR PERIOD) | PER DAY | ||
| 4.03 | VACUUM FILLING* | ||
| (OIL STORAGE NOT TO BE CHARGED DURING FILL) | PER JOB | ||
| 4.04 | OIL DEGASIFICATION* | PER JOB | |
| X | INCLUDED HOURS OF DEGASIFICATION* | HOURS | |
| 4.05 | OIL DEHYDRATION* | PER JOB | |
| X | INCLUDED HOURS OF DEHYDRATION* | HOURS | |
| 4.06 | HOT OIL FLUSHING | PER JOB | |
| X | INCLUDED HOURS OF HOT OIL FLUSH | HOURS | |
| 4.07 | RE-INHIBIT TREATMENT | PER JOB | |
| 4.08 | OIL RECLAMATION | PER JOB | |
| 4.09 | GASKET REPLACEMENT | PER GASKET | |
| 4.10 | BUSHING REPLACEMENT | PER BUSHING | |
| 4.11 | INTERNAL INSPECTION | PER JOB | |
| 4.12 | PAPER SAMPLE | PER JOB | |
| 4.13 | LISCENCED ENGINEER SIGN / SEAL ON REPORT | PER | |
| 4.14 | VALVE REPAIR | PER VALVE | |
| 4.15 | TRANSFORMER ASSEMBLY OR DISASSEMBLY | PER (DIS)ASSEMBLY | |
| 4.16 | COIL RETIGHTENING / RECLAMPING | PER JOB | |
| Proposer Information for: AR 25-039-MC, SUBSTATION TRANSFORMER OIL PROCESSING SERVICES |
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
File details come from the government source that posted it. Updated .