This document is Addendum #1 for Invitation for Bid AR 25-039-MC issued by the Kissimmee Utility Authority (KUA) for Substation Transformer Oil Processing Services in Osceola County, Florida. The addendum addresses various bidder questions and clarifies details about the solicitation, including that this is a Master Service Agreement (MSA) type Time & Materials contract with defined rates for transformer oil processing. The work will be performed at various substations, and bidders are required to submit a revised pricing sheet (Attachment B) that includes additional pricing rates for vacuum time.
The addendum provides responses to eight questions from potential bidders, covering topics such as vacuum processing times, bushing changes, oil testing, and site visit opportunities. KUA directs bidders to refer to the Bid Specifications document and/or Pricing Sheet for specific details about processing specifications, bushing supply, and other technical requirements. Bidders must acknowledge receipt of this addendum by signing the provided form and returning it with their bid response, with the understanding that the addendum is incorporated into the original solicitation documents and has the same force and effect as the original bidding materials.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e 1 | 2
TO: All Proposers FROM: Mel Couture, CMP, CPPB, NIGP-CPP DATE: April 2, 2025 RE: AR 25-039-MC, Substation Transformer Oil Processing Services
ADDENDUM #1
Bidders are hereby notified that this addendum shall be made a part of the above-named Invitation for Bid and agreement documents. The items listed below are issued to add, modify, and/or clarify the solicitation document and agreement documents. The items shall have the same force and effect as the original bidding and agreement documents, and cost involved shall be included in the bid pricing. Bids, to be submitted, shall confirm with the addition and revision listed herein. Return this sheet with your bid response.
I. QUESTIONS
Q1. What is the vacuum time they want for each type of transformer?
A1. A revised pricing sheet has been added by addendum and uploaded to
VendorLink. Additional pricing rates to address Vacuum time have been added to the revised pricing sheet. It is mandatory to submit the revised pricing sheet with your bid. SEE ATTACHMENT “B”
Q2. For the units that don't require a bushing change out, what is the scope of work?
A2. This is an MSA type T&M contract with defined rates that will allow KUA to build scopes of work based on KUA’s various project needs.
Q3. Depending on the answer to question 2, we may need the oil test results for the transformers?
A3. There’s a subcontractor cost plus rate for that.
Q4. Is it possible to get the substation addresses where work is being performed?
A4. The work will be performed at various substation in Osceola County Florida.
Q5. Bushings may be draw lead, need to confirm, can KUA confirm if the HV bushings are draw lead?
A5. This information provided in Bid Specifications document and/or Pricing Sheet.
Q6. What is the processing spec for the units? (Vacuum times, will hot oil circulation be required)
A6. This information provided in Bid Specifications document and/or Pricing Sheet.
Q7. Who is supplying the bushings? (If it’s the contractor, has lead time been accounted for?)
A7. This information provided in Bid Specifications document and/or Pricing Sheet.
Q8. Can there be a site visit?
A8. This information provided in Bid Specifications document and/or Pricing Sheet.
P a g e 2 | 2
II. DELETE and REPLACE
1. Delete Attachment A Pricing Sheet; Replace with Attachment B Pricing Sheet - REV1
III. ATTACHMENTS
1. Revised Pricing Sheet SEE ATTACHMENT “B” AR 25-039-MC Pricing Sheet - REV1
Bidder(s) must acknowledge receipt of this amendment by signing this form below and returning it with your bid response.
Acknowledgment is hereby made of Addendum #1 to project AR 25-039-MC, Substation Transformer Oil Processing Services.
Bidder Signature Date
Bidder Printed Name Company Name
This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or to answers questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as if set forth therein. All other parts of the solicitation have been maintained as originally distributed. This addendum supersedes any verbal or other instructions given to any proposer qualified to respond pursuant to the requirements set forth in the solicitation document.