This document is Addendum #1 for Solicitation AR 25-039-MC issued by the Kissimmee Utility Authority (KUA) for Substation Transformer Oil Processing Services. The addendum addresses bidder questions and revises the pricing sheet, with work to be performed at various substations in Osceola County, Florida. The solicitation seeks a Master Service Agreement (MSA) type Time and Materials contract with defined rates to allow KUA to build scopes of work based on project needs. The addendum indicates that bidders must submit a revised pricing sheet and confirms that additional pricing rates have been added to address vacuum times for transformers.
The addendum references a revised Attachment B Pricing Sheet (REV1) which replaces the original Attachment A, and instructs bidders to acknowledge receipt by signing and returning the amendment with their bid response. While specific pricing details are not fully elaborated in this document, the addendum suggests the contract will include rates for various transformer oil processing services, with flexibility for KUA to assign work at its discretion. The procurement appears focused on establishing an annual contract for transformer oil maintenance services, with provisions for potential emergency and planned work across the utility's substation infrastructure.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e 1 | 2
TO: All Proposers FROM: Mel Couture, CMP, CPPB, NIGP-CPP DATE: April 2, 2025 RE: AR 25-039-MC, Substation Transformer Oil Processing Services
ADDENDUM #1
Bidders are hereby notified that this addendum shall be made a part of the above-named Invitation for Bid and agreement documents. The items listed below are issued to add, modify, and/or clarify the solicitation document and agreement documents. The items shall have the same force and effect as the original bidding and agreement documents, and cost involved shall be included in the bid pricing. Bids, to be submitted, shall confirm with the addition and revision listed herein. Return this sheet with your bid response.
I. QUESTIONS
Q1. What is the vacuum time they want for each type of transformer?
A1. A revised pricing sheet has been added by addendum and uploaded to
VendorLink. Additional pricing rates to address Vacuum time have been added to the revised pricing sheet. It is mandatory to submit the revised pricing sheet with your bid. SEE ATTACHMENT “B”
Q2. For the units that don't require a bushing change out, what is the scope of work?
A2. This is an MSA type T&M contract with defined rates that will allow KUA to build scopes of work based on KUA’s various project needs.
Q3. Depending on the answer to question 2, we may need the oil test results for the transformers?
A3. There’s a subcontractor cost plus rate for that.
Q4. Is it possible to get the substation addresses where work is being performed?
A4. The work will be performed at various substation in Osceola County Florida.
Q5. Bushings may be draw lead, need to confirm, can KUA confirm if the HV bushings are draw lead?
A5. This information provided in Bid Specifications document and/or Pricing Sheet.
Q6. What is the processing spec for the units? (Vacuum times, will hot oil circulation be required)
A6. This information provided in Bid Specifications document and/or Pricing Sheet.
Q7. Who is supplying the bushings? (If it’s the contractor, has lead time been accounted for?)
A7. This information provided in Bid Specifications document and/or Pricing Sheet.
Q8. Can there be a site visit?
A8. This information provided in Bid Specifications document and/or Pricing Sheet.
P a g e 2 | 2
II. DELETE and REPLACE
1. Delete Attachment A Pricing Sheet; Replace with Attachment B Pricing Sheet - REV1
III. ATTACHMENTS
1. Revised Pricing Sheet SEE ATTACHMENT “B” AR 25-039-MC Pricing Sheet - REV1
Bidder(s) must acknowledge receipt of this amendment by signing this form below and returning it with your bid response.
Acknowledgment is hereby made of Addendum #1 to project AR 25-039-MC, Substation Transformer Oil Processing Services.
Bidder Signature Date
Bidder Printed Name Company Name
This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or to answers questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as if set forth therein. All other parts of the solicitation have been maintained as originally distributed. This addendum supersedes any verbal or other instructions given to any proposer qualified to respond pursuant to the requirements set forth in the solicitation document.
File details come from the government source that posted it. Updated .