This is a Design Report for the Forest Ridge Park Mountain Bike Trail Extension project prepared for the City of Raleigh, North Carolina. The report outlines the design specifications for natural surface mountain bike trails at Forest Ridge Park as part of a design-build services procurement under NC General Statutes 143-128.1A. The project encompasses the planning and engineering design for mountain bike trail infrastructure, including trail layout, grading, drainage, and natural surface specifications. The report provides detailed design recommendations and technical specifications necessary for qualified design-build teams to execute both the design and construction phases of the trail extension. The document serves as the foundational technical reference for the City's solicitation of design-build services, establishing the scope of work and project parameters that bidders must address in their proposals.
The report contains comprehensive design details, site analysis, and technical requirements that define the project's physical parameters and construction standards. It includes trail routing, elevation profiles, environmental considerations, and specifications for natural surface mountain bike trail construction. The design information presented establishes the baseline for cost estimation and schedule development by prospective design-build teams, enabling them to provide informed pricing and implementation timelines. This appendix serves as critical supporting documentation for the design-build procurement, providing the technical foundation upon which teams will develop their integrated design and construction proposals and cost proposals for City evaluation and selection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Raleigh, Forest Ridge Mountain Bike Trails
Extension Design Report
A natural surface mountain biking trail system for Intermediate and Advanced riders, located in Raleigh, NC.
Prepared For:
City of Raleigh, Parks, Recreation, and Cultural Resources
Prepared By:
Rock Solid Trail Contracting LLC
Bentonville Headquarters 8110 W Ford Springs Road
Bentonville AR, 72712 af ROCK SOLID
TRAIL. CONTRACTING
Document Version: Final
Last Updated: 12/15/2023 Publication Date: 12/15/2023
Forest Ridge Mountain Bike Trails Extension | Page 1 of 33
Contents OVErVIOW cccccccsccoccccsessssscsecensecossseseseectscseraensversesecieeenseenesusenssedeeennaaeenansersasacndssebaeesdsminaasengangedsesed 4
Key GOALS sc cccscsssesssssecsesneesrssiesssessseeseseneenseuneenssaneeneensrarsrsssssssessaseuennsrunarasrisesoeeesauanauincasssssessetsey 4
Site ASSESSIMENE seccscsesscessecsecsecsssestecsvesvecsssosnssssnesetseseeseeesseenrsareespestieseessienessneeneesesuneseenessneeerseereeree
Western Loop Trails ....c.ccccceecssesssssnsssensneenssssneesescnseanaaeererenesstissseaensieatenesrsesseesescaneceneeenanes 5
Primary Site COMStraimts ......-cccscccneesecceeseesseesteeneen sss sseessiessscnnennnesnsseensaasssoeauiseneesenssesstssetssttas 5
Primary Site Opportunities .....e cscs estes ee tener ress sesetesneneneereresssrsteteeeaaamenaeererssrst it eseits 6
Western Loop Connector (100) vo. cccccccseseensseneeenecseeneieteeieeniessrereseneecssimeearneatenenersesees 6
Western Loop (101) v.cccccecssssisissisesseresternssessessssaeanseessstesteitsnennernsaseenstecrrcesenssntenseenecenrenes 6
Western Loop Matrix Tables......c.csssccssersrrercesesesssnssersssecssstessaseataasaeensrtersrsrscaseseaseeeaeesnaens 6
Western LOOP Mapping u..c.ssccsccecsessessssessesseeenenssnssesesisseanesennsseeessssracetiststieannanenneneeenseesseaesteass 9
Southern Loop Trails... cssessseseeeeseeeeseeeeeceeeerensrersseeenarenesereesen sre neiinensaaenrneinirnr siete 10
Primary Site COMStraints ..ccccceussesnenss sees esstsceseneeneeeseneteteneeseeneeenesensaneessessessesseneereerreset 10
Primary Site OPPOrturnities ........cscscseseecseseeeeseeseasssatsessesneecensesenesteasnce centers geteceeceeneatneanes 11
Southern Connector (200) .......ccscescccessceseseseeeesssessussesassessssssteeseiseeniteerensenrvectsneratiessanvenes be
Southern Loop (201) cc cccseeeescecesneneissesssnseeeeesecsesneanssesianeianenneeaeentsaeaterseeereeereseenny 12
Southern Connector (202) ..ccsccsccsssecssssssssstssnccsesvssseessesssssnscsvesnacsiseseeseesssiiensenterereereesssaces LD
Southern LOOP (203) ...ececcecsecsecereersrsetseecsescseesesseansseesetsessanseenmanssneassssssstieeeseeesnannenneeateaceas 12
Southern Alt Lime (204) oo... cc ceeesceeeereecteeseeesssnestereseeaeeraectuaeeeenrerssienreseentetieagiseaenensenens 12
Southern Loop Matrix Tables.......ccccesisscesiiiece serene ieieeeiieeeeiernereriecs ie ienseeniseniay 13
Southern Loop Mapping ..... sasadanaguanenangunyanansaro nent nbal besSvOSSO So GUUS OU POUND PSION HUERTE TELA THIN EES EBS
Grading in Trail Construction...
Components of a Grade Plan.
Components of a Trail Design...
Sedimentation and Erosion Control... ieee etter nereneerieme errr reer 20
Tread Construction Types
Full Bench Cut Trad ...ccccececccccsscesscessstesesesnecensesenstsenonseseceeeenenensenensenesarstieetisentaaentnaesnaneneyes 21
Lift & Tilt Traiil.........ssssseseeeereeeeecees Jie
TUPTPIKe vssescsessisssssssseseseesseeseesssssesssiessssicusatscaeseneeneeneeneeneeneenesiennadeeciniunnastanmeserertrensrs tities 21
Boardwalks and Bridges...ccccccscsccccsssceessscetseeenserseresseseeeetneneeneceerenmeesereranecetuennenenerer es 21
Trail Feature TYD@S......cccccssssesscccececsesseseseerenenerrereessesesssananensusrsaseeeecenenenanananarernerstpessecesescaaaeannens 22
B@Q ih) icccsscctcsseseecacevesevssessssssseeeaeesesegeaeacanecanqenennnccotiteetaeeeecceaaaaaennniasaee testi enaannenresescesassaeessanenes 22
CHIMbING TU ccc tienes reer reiistseesereneeerereenentineiinies seeneyeoneorunciayecnersentsgs 22
Forest Ridge Mountain Bike Trails Extension | Page 2 of 33
DIOP, ersaecemneenaanirar isa seeet ep aiberennsetenis tateacanaamnvantatiaconasse nan Magee eas ae RARE nee 22
Ceeied emesczacissunasia resi asses STUER UV oaaneuacansenengengnoneessnecunsessvagnsestaananancceseenansuananstgneruasaveces 23
In-SlOped TUPM ....ssscccessecssssnessssveesssssssstiusessessaseerersseeeeesnsieerseseeseseitsesssssveusssrvasessesivessveneee 23
Rock AMMOAN Besucsnoiainonnaiei lA MRE og
ROCK Garlic ivan ainagSeaSSSTSTIEUAIING ee ceon snpvemeannsapnneresnenensazereerseerenroesesescieenearesomedl
Roller sicts Si aiisietssessnserresesseenessenessversoeesenseronssatenteateeussssnadtsnseriuesseiessvnssstiemasnceemennannes DE
Table: TOR AMM ccsasccrscasaiscsazcincanireper nee WIA NW Nee SAU cc casseesameeereeeasee
Trail Feature Example Photos ...cccccccsscsscssessessessecsessesessessecsecesssssssvsresseeseeseceersetese
Construction Budget Estimate... ccs
Recommended Next Steps......c.cccccccccccsesssessssscscsveversvapsvseatstesacansveneass
EMCIOSUPES cos cccscsscssssessnssssestssseseesseseneeseesnessnesucsuscsrensessraseesaveseieess
REPEPENCOS Loi. ccscseneseeseseess
PROQOO0 BY sco cccnciniieietiann nie
Forest Ridge Mountain Bike Trails Extension | Page 3 of 33
Overview
The City of Raleigh, Parks, Recreation and Cultural Resources has partnered with Rock Solid
Trail Contracting (Rock Solid) to develop Trail Design Report and accampanying Trail Design
Mapping to guide development of natural surface mountain biking trails for the Forest Ridge
Mountain Bike Trails Extension Project.
The property targeted for develaping a trail system is located within Forest Ridge Park, Raleigh, NC. The trail system will be accessed via the existing parking facilities and Welcome Center.
The Forest Ridge Trail Extension will complement the existing network of natural surface trails.
The design report focuses on the development of intermediate flow trail to advanced XC trail across the property. It features large mature wooded areas with limited underbrush, there are also several wide drainages. Except for the drainages, the grades across the side are mellow to moderate, To accomplish the project goals for the trail system, with the site's terrain, trails will primarily be bench cut construction, with a small amount of lift and tilt and turnpike construction in flatter terrain where positive drainage is necessary. There are a number of drainage crossings required. Most drainages can be crossed with a rustic, natural crossing;
boardwalks; or short span trail bridges. We are making recommendations on crossing type based on the City9s project goals.
This report outlines our recommendations and proposal trail design, including the details and documents required for administering a quality public bid of the project.
Key Goals
* Gevelopment of intermediate flow trails for the western loop and more progressive advanced XC trails for the southern loop that provides a unique riding experience to camplement the existing trails found at Forest Ridge Park, ¢ Mitigate potential erosion and drainage issues by specifying modern trail construction techniques and suitable crossing designs.
® Make the best possible use of the terrain to provide a backcountry riding experience for the southern loop.
Site Assessment
Rock Solid performed an onsite assessment in March of 2025, and we were able ta access the entire site for assessment and ground scouting. This field work, paired with geospatial analysis of the site, is the foundation of the design presented in this report. During our time at the site, we identified the primary site constraints and opportunities, which are outlined in this section.
Forest Ridge Mountain Bike Trails Extension | Page 4 of 33
Western Loop Trails
Primary Site Constraints
Access
There is good access from the park maintenance road for the entire Western Loop, along with access from the lake if needed, This will allaw for ideal movement of people, equipment and materials to and fram the build site.
Onsite Rock Material
It has been noted that natural rack located within this site is minimal, therefore it will be necessary to source rock from a local quarry to be used for the purposes of, bridge abutment canstruction, tread hardening in drainage locations, rip rap at drainage structures, along with creating some technical trail features that could be incorporated into the trails.
Utility Coordination
There were no utilities noted during the site visit. Coordination with local utility companies should be completed before trail construction activities begin, to verify that no utilities are located within the project limits. If utilities are found within the project limits a plan should be put inte place ahead of construction so no damage is done to the utility infrastructure, and far the safety of project construction teams.
Drainages Across the Site The site's topography is defined by numerous small, dry gulleys and flowing creeks spread across the property. The drainages are naturally occurring and convey water from the City9s property to the downhill shores of the Neuse River and Jennys Branch. The drainages vary in size, with some exceeding 20 feet wide, with water present. Each drainage will require a specific crossing solution. The location of each drainage is called out on the Trail Design Map and the details for each are provided in the Crossing Inventory. Various types and styles of crossings will be necessary throughout the project. The most common, crassing for this site will include single and multi-span boardwalks where water is less present and the channel will not support bike traffic. In locations with flowing water, trail bridges with abutments anda minimum clearance of 49 above normal water elevation will be necessary. Same rustic crossings can be accomplished by clearing away fallen branches and leaf litter to expose a naturally occurring, durable, rocky trail surface, Bikes can traverse the crossing directly on the surface of the channel bottom. In some instances, a rustic crossing may require armoring by placing imported rock in the channel bottom. This will allaw for the existing channel geometry to remain but provide a hardened trail tread to mitigation erosian concerns.
Forest Ridge Mountain Bike Trails Extension | Page 5 of 33
Primary Site Opportunities
Intermediate Flow Trail
Flow Trails are usually associated with a trail that provides a <roller-coaster= type of experience.
Flow Trails offer lots of fluid up / down, and left / right changes in direction through the use of rollers and berms. Flow trails are also slightly wider that traditional trails which allows for more side-to-side play, wider landing areas where features allaw users to get airborne. When constructed to a wider standard, flow trails also allow for adaptive riders to use the trails, It is recommended that flow trails be designed and constructed with ane-way trail directionality in mind, Western Loop Connector (100) Approximately 0.9-mile connector trail that has been designed as a two-way intermediate flaw trail. This trail serves as the connection to the Western Loop. Designed ta optimize grades of 3-
5%, which are prevalent across the site. The proposed flow trail will be constructed with tread that is wide enough to be accessed by adaptive mountain bikers. There is an opportunity to include a rocky spine as an optional feature for this trail.
Western Loop (101) Approximately 3.0-mile loop that has been designed as a one-way intermediate flow trail.
Designed to optimize grades of 3-5% which are prevalent across the site. We arerecommending a high frequency of trail features, which can include berms, switch berms, rollers, in-slaped turns, and table-top jumps. Constructing the Western Loop as a flow trail featuring wider tread than the existing trails will improve accessibility for Adaptive Mountain Bikers.
Western Loop Matrix Tables
Table 1: Trail Matrix detail each segment9s primary design characteristics. These values are the basis for the construction budget estimate. Full size trail matrix can be found as an attachment to this report
Forest Ridge Mountain Bike Trails Extension | Page 6 of 33
Description Tread Width | = Unite 8Quantity Comments int late ¢ Bike Intermediate FlowTrail seca Flow 6 Lt thang Bench Cut Trail Construction in areas that offer
(Bench Cut) eat : ; Spportunity for natural drainage, a cine Tey fruntioni intermediate / Bike & Tit Tread Constructionin areas that have a natural
Intermediate FlowTrall Optimized os ie 2551 cross slope of legs than S%and offer little tano (Lift & Tilt) Trall J opportunity for natural drainage. Quantity represents an estimated 16% of total trail length, Turnpike Construction in areas that are Mat, that havea Intermediate | Bike|
Intermediate Flow Trail Optimized Flow 1° LF 26n natural cross slope of hes than Sand offer littia to no (Turnpike) aa : 8 opportunity for natural drainage, Quantity represents 15% of total tralllength, Intermediate / Hike TypeT {Larger Radius
FELIPE itary 8 Optimized Fiow x EA 5 Larger wide climbing turns of berms Flow Trail) Trail
Rock Armoring to be used in low grade, predominately dry At Grade Crossing (Rock Intermediate / Basta? LF s00 ditches, quiley's and depressions that may Gonwey water al
Armoring! Advanced some point. Width of Rock Armoring to be 48" See
Crossing Matrix for detalls
Used at prodomimately dry water crossing locations and th ih Intan ate at quiley's or depressions where a culvert pipe would Boardwalk Ve or LF i) restrict potential flaw. Boardwalk deck elevation would be
2 max, and not require hand rails. Giridga may require handrails
Used predominately with Turmpéha Construction whare Intermediate / :
Culvert Hdvanced 24° = 4g" EA 4 positive drainage Is necessary In varlous intervals below the trail tread. Minimum size tobe 1° diameter.
Used at culvert pipe installations. One SY per culvert pipe, Rip Rap NIA NIA sy a Half Sf at the inlet side, and MalF S¥ at outlet side of each pipe.
Wayfinding Posts NYA AA Ea 2 Sign Posts at Intersections
Table 2: Trail Quantites Inventory that details trail construction and feature quantities in an inventory format. These quantities are used to prepare the construction budget estimate and may be subject to changed based an the final project construction budget. Full size quanitity matrix can be found as an attachment to this report
Forest Ridge Mountain Bike Trails Extension | Page 7 of 33
8Tread
Name 8Trell 8Type of Grossing Crossing width ute Comments eu Bera Carley, Hecomenended Rock fumored at grade (Rustic) erawsing woot | ixtwrrndtiata (1501) ky : Dery Guitay 7 oF lining imparted rock. Acciees be frail fot lmparting rmimterishe in goad.
Indu Rocummunded width for Mech armoring tx srr uiey, Rec h at grade (Puccicl At Gienau Ceuseing
WeE interrandiate (100) Hye Dry Cauttery uw is Jusing anpotted ruck. Accems to trall for importing maderiate te yood.
asain hc evel (arly. coed Finch, tor ing wed Ietermoedtate [1007 Pepe (Bry Gulley on oF Laing dinported nok. Acerss to tall fer porting ereaperiate is good.
Riecorrenended whith for Fock Arrmueina ia erat Gute, Wace ator | croaming m rossing
Wx interrelate 190) as, Oey Chuang a - ning imported roth Acceta 1a tril for importing Mantierials oe coer.
-weletth For neh Arrmeationg Heb
Wot | intermediate (100 Bonctwath Bry Sula or st Smeal Harrow utley, steep slopes, wicie buartwalh recommended, intermediate Loop: t Small Marrow Cuiey, Culvert pine recommended dur tom ecitence ot Cutvert 7 WEE jn Dry tuttey ar alae Sevichidad voll interpnediate Loop Serna Marrow Gulley, culvert pipe recoeenended dua tomo evidence at we? Cutty {ol ig ne ha enter during felis mat irdormedine Loop: Genet Marrow Oadlay. culvert pier mpcommended Gus bo no evidence ot fear outing A isle How wt BY = 3 wat rhurinng foeeel Wor
Wie Fat walany, tar ebmaiti orm Poo ai tre if (had peri
Ineerrrmdtiata Loop | At Grad Ceowsing ta Rock at grade ingore wee 8Out i a
(an (Rack Armoring! bis rote Accoeto tral (ne fmporling materials is good, Rucnreerded midi for Fock Arenonee be ia encase petal eA wicie: | tweets Laon AL Gende Gnesing | or 4 Recommended Rock Armand at grade (Runtil crowing uding enportetd too) (Rock demaring) rock. Accate 1a 1ralt tor importing reateriae fe gone. Recoremended wert fr ng i Wile Plat walliry, oc tenting water Faron at irre of foeied wpe trary wth wen || (noerenset bene AbGrade Crasaing ty we Pd Croapiey 1), Recommended Roth Armorad.at grade (ustichoroaning
i) (Wook Arenering) sing immntted fork. Acces bo trnll forimeorting maneriats bs good.
frecormreencied widtn for Sock Aermareeg 18S
Pils tier walkey, ren vonantilr weer fica a tlerop oe lad wpe. Uwe eth sity jesermediat Loop | AtGrede Cromerg bry Buty ¥ ar Cromging © Racenrmnended Nock Armorbd at grade (fumticl oreeainy thin) (Ack Armoringl es lieing imported rock. Access to the fer importing materiale iw ond.
Pecorrensnded wih tie Finck Armaring ia
Notas:
8Loop direction #ar Grousing number Idonillcaticn is bhachudtee.
TBeardecal, eidth assumed al F609
Vleck Arcror With In assumed at S000") tread sidth at Rock Armor Locaticors-aastanied at 2088-1) Trond ahstedd be cuntarad welts Reach remoting
Table 3: Trail Crossing Matrix for the Western Trails. Full size quanitity matrix can be found as an attachment to this report
Forest Ridge Mountain Bike Trails Extension | Page 8 of 33
Western Loop Mapping
A full resolution Trail Design Mapping is included as an attachment to this report. The trails are numbered and correspond to data presented in the Trail Matrix and Trail Quantities Inventary.
Forest Ridge Mountain Bike Trails Extension | Page 9 of 33
Southern Loop Trails
Primary Site Constraints
<lecess
There is paor access from either end of the southern loop area, which makes hauling materials and equipment into this area more difficult. |t will be burdensome to move equipment and imported material along the existing trail corridor to the southern loop build, site due to the lack of access road and narrow tread of the trail. Importing materials for crossings and features may be accomplished via the lake by boat.
Onsite Rock Material
It has been noted that natural rock located within this site is minimal, therefore it will be necessary to source rock froma local quarry ta be used for the purposes of, bridge abutment construction, tread hardening in drainage locations, rip rap at drainage structures, alang with creating some technical trail features that could be incorporated into the trails.
Utility Coordination
There were no utilities noted during the site visit. Coordination with local utility companies should be completed before trail construction activities begin, to verify that no utilities are located within the project limits. If utilities are found within the project limits a plan should be put into place ahead of construction so no damage is done to the utility infrastructure, and for the safety of project construction teams.
Drainages Across the Site
The site9s topography is defined by numerous small, dry gulleys and flowing creeks spread across the property. The drainages are naturally occurring and convey water fram the City9s property to the downhill shores of the Neuse River and Jennys Branch. The drainages vary in size, with some exceeding 20 feet wide, with water present. Each drainage will require a specific crossing solution. The location of each drainage is called out on the Trail Design Map and the details for each are provided in the Crossing Inventory. Various types and styles of crossings will be necessary throughout the project. The most common, crossing for this site will include single and multi-span boardwalks where water is less present and the channel will not support bike traffic. Inlocations with flowing water, trail bridges with abutments and aminimum clearance of 49 above normal water elevation will be necessary. Same rustic crossings can be accomplished by clearing away fallen branches and leaf litter to expose a naturally occurring, durable, rocky trail surface. Bikes can traverse the crossing directly on the surface of the channel bottom. In some instances, a rustic crossing may require armoring by placing imported rock in the channel bottom. This will allow for the existing channel geometry to remain but provide a hardened trail tread to mitigation erosion concerns.
Forest Ridge Mountain Bike Trails Extension | Page 10 of 33
Primary Site Opportunities
Intermediate Mow Tratl
Flow Trails are usually associated with a trail that provides a 8roller-coaster9 type of experience.
Flow Trails offer lats of fluid up / down, and left / right changes in direction through the use af rollers and berms, Flow trails are also slightly wider that traditional trails which allows for more side-to-side play, wider landing areas where features allow users to get airborne. When constructed to a wider standard, flow trails also allow for adaptive riders to use the trails. It is recommended that flow trails be designed and constructed with one-way trail directionality in mind.
Advanced XC Trail
Advanced XC Trail traditionally tend to be a bit narrower (12"-24") and offer less manipulated tread surfaces, This style of trail alsa typically has less frequent and more natural laoking technical trail features. The trail width, grade, and remoteness lend this style of trail to be more advanced.
Gravity Trail
While gravity trail is more typically associated with resorts and locations that have some type of uphill assistance, Within Forest Ridge Park there is an opportunity to offer a gravity type of experience on a smaller scale in the form of directional one-way descending trail as a way to introduce and provide a gravity experience that may be found within a couple hours of the greater Raleigh area. At this site, a gravity style trail would be incorporated asa short loap within the Southern Loop Trails. There would be no uphill assistance provided or designed into this system, as elevation at this site doesn't support the need for uphill assistance.
Techoical Trail Features
We are strongly recommending the installation of prefabricated or imported features to increase the feature density of this trail system. This is because there is a lack of existing rock and other suitable materials onsite for building technical trail features.
Prefabricated features are constructed with a steel substructure and rot-resistant decking boards. Prefabricated technical trail features can be made to any size and shape the project requires and can be used to add visual character to a trail as well as opportunity for skill progression, They vary in size, complexity and cost.
Imported natural features at Forest Ridge Park would include jumps and drops constructed with native stone brought ta the site for construction. Like prefabricated features, they can be customized in size and difficulty, and can add visual character and opportunities for skill progression.
The incorporation and installation of Technical Trail Features can be defined by the client and / or builder during the final trail flagging phase of construction, which occurs before trail construction begins. A predefined budget will help determine the style and frequency of Technical Trail Features added to this trail system.
Forest Ridge Mountain Bike Trails Extension | Page 11 of 33
Southern Connector (200)
Approximately 0.23-mile connector trail that has been designed as a two-way advanced XC trail.
This trail serves as a connection between the existing beginner level trails to the first of two loops designed in the southern trail system. The nature of this trail will be advanced, with an average trail tread width of 18=.
Southern Loop (201)
Approximately 1.81-mile loop that has been designed as a directional advanced level XC Trail.
There are opportunities te incorporate tighter climbing turns / switch berms into this loop alang with some advanced feature such as rock gardens, ledges, rock gardens, rock rolls and other features commonly associated with advanced level XC trail. Feature materials wauld likely need to be imported to the site, as there is a minimal amount of rock native to this site.
Southern Connector (202)
Approximately 0.83-mile connector trail that has been designed as a two-way advanced XC trail, This trail serves as a connection between the first and second loops designed in the southern trail system. The nature of this trail will be advanced, with an average trail tread width of 18°, Southern Loop (203)
Approximately 1.1-mile loop that has been designed as a directional advanced level XC Trail, There are opportunities to incorporate tighter climbing turns / switch berms into this logp along with some advanced feature such as rock gardens, ledges, rock gardens, rock rolls and other features commonly associated with advanced level XC trail, Feature materials would likely need to be imported to the site, as there is a minimal amount of rock native to this site.
Southern Alt Line (204)
Approximately 0.15-mile alternate directional loop that can serve as a short climb and downhill section of trail. This trail should provide some features not found within the rest of the advanced trailsystem. Feature materials would likely need tobe imported tothe site, as there isa minimal amount of rock native to this site.
Forest Ridge Mountain Bike Trails Extension | Page 12 of 33
Southern Loop Matrix Tables
Moers |. Frantaret semerey sveraped eas ibdtonisas Pre MND9 oa's F2 aastcria, Meat 3-4 natures, Wight = wd fewest
Table 4: Trail Matrix detail each segment's primary design characteristics. These values are the basis for the construction budget estimate. Full size trail matrix can be found as an attachment to this report
Forest Ridge Mountain Bike Trails Extension | Page 13 of 33
Southern Loop Quanttles | Matrix
Description Tread Width | = Unite Quantity Comments
Bench Cut Trall Canstruction jn areas that offer
Advanced Trail [Benehcut) Advanced we-24" LF raners opportunity for natural drainage ond have a natural cross slope of 5% or greater.
Tuen Type 2 i Tightor Radius Singletrack Type Turn including insloped turns, Advanced i -2e E 1)
Advanced Trad) " ul = switchiack and tigher climbing turns
AtGrade Crossing [Trail] intermediate / A" ia WA 8Crossing Matrix tor i mrad ai anced! 2 N. See Crossing i tor details:
Used at crossing water locations where water !s commonly present, Ralings would be required on all Intermediate / 8i
Bridge awed 4g" 60° LF BB bridges per local building standards. Total of 6 Bridges!
Watercrossings on South Trais, This quantity lathe sum of oll 6 bridges.
Used at predomimately dry water crossing locations and lat quiley9s or depressions where a culvert pipe would Intermediate / 4 8
Boardwalk iearaaa a LF 26H restrict potential tow, Boardwatk deck @evatton would be fan 7 max, and not require hand mds, Bridge may require handrails
Lised predominately with Turnpike Construction where Intermediate / 8 s pe
Culvert A i 20-40 EA 2 positive draknage ls necessary in various intervals balow the trail tread, Minimum size to be 18° diameter.
ised at culvert pipe installations. One SY per culvert pipe.
Rip Rap Nia NIA SY 2 init SY at the inlet side, and Half SY at outlet side of each pipe.
Wayfinding Posts NIA NIA EA a Sign Poste at Intersections
Table 5: Trail Quantites Inventory that details trail construction and feature quantities inan inventory format. These quantities are used to prepare the construction budget estimate and may be subject to changed based on the final project construction budget. Full size quanitity matrix can be faund as an attachment to this report
Forest Ridge Mountain Bike Trails Extension | Page 14 of 33 ret rr) te roe | tyeesteraasing | eres teins | Greesing | rims | tas | sama 4" rat re, «fae revise edit Piece! <yh ae = [sone hahaha sr ad a i Bw ei leet ere = = at | Asemenaiceon | pee serene Se ae ttesae q bap tt at van = ote Sewer sg aa, Ft nh ar eat Readies wl ann we eee ct | eememacoo | bine: ewe wee [oe | u ae suede
| etait] MOET te | ne | atk Cree oo 8 im 8eet
ES Varta bets | Marines | a |e 4< . 8ext 1
Mead oe i mae i eee Lew | setae | ae » Tig eosin ty | teenie | PMT pec | te | wo ee | A | cree trany re | arate | oe |e Ce ee a a 44 me | eee x ae eee a be at nn ar
Memes Le eve tnt ea et | Memdateg | TS Dipti || ee ne eer ae
8Wony toy bee cal = Meree lor shserawras! me an emt ai beanristal Re al Ma « wn feat.
| emt fiend fr! me peviiad Err] Maat nyt | <e os lore Aaeetd teers ee amass an nme maa «| u a 0 loreaeee o snd sp ha an rll Cl] alee ea en oa
Aeteiedioe ea We 09 rh mete ee DTA rca esl teeta tet on vii hc | Raat teeeien | be | td ony aren rama ere Tt a wi Tank | Mbsaatvasing | TES 8eat Dus ae au
Meee en le ow Ta | Aes mre | femten | oe | oe » eed |e wr | teewwmcntt | a el Se ae ar
3 nee ae | saemzenent | amoneng | TERM | sieeve | iba a ree now tons | eavencaion | age ed Ce ee ee basta, se | Memomsiecat | tare ee ee Ct -in | Merete | seritas Vat an ac tain omug | ele Me Ba oo eons ow eet te Bb i is a | bse | MTS yt oo ~ teenies Aa i wa cen |e eerreneey | ME | caters | ome | wn wo wane
Mewes eer fa i. on Ten | Atalay | MPS yale ony wa a het heel tems ire!
== a | A ee || oe WO Pinte teh eames
Mrwend ewe a tre tet eee 18 Ten | Miinnaneny | PN eyes | oe | ew oo
(emt eee ee es fen | meee | oe | re : 4_ ~ tts Nhs acre ta Gresag sands or et abate fiaseeses sett nena TT Teck rir Were gears 8 AF Loren cera Rach rv cucabar one sad oe ota inreceannicg
Table 6: Trail Crossing Matrix for the Western Trails. Full size quanitity matrix can be found as an attachment to this report
Forest Ridge Mountain Bike Trails Extension | Page 15 of 33
Southern Loop Mapping
A full resolution Trail Design Mapping is included as an attachment to this report, The trails are numbered and correspond to data presented in the Trail Matrix and Trail Quantities Inventory.
Forest Ridge Park:
Flagged Trails w/2ft >_, 2 800 Feat
Contours
2: Southern Advanced Trails
Forest Ridge Mountain Bike Trails Extension | Page 16 of 33
Grading in Trail Construction
Trail design and construction does not conform well to traditional grading plans, A traditional grading plan outlines the criteria for large-scale land development, and is a precise, engineered document. The grading plan gives the regulatory agency, owner and contractor all the information required to manage and inspect the grading process from start to finish. The information in this section is provided to give an understanding of the process used to design and construct a trail and resources for managing trailbuilding and ensuring there are no undesirable drainage impacts on the project site, Components of a Grade Plan
Design elevation, surface gradient, and swale location are the usual components of the plan. The plan also shows the elevations, dimensions, slopes, drainage patterns, etc, The location of the building, existing/proposed elevation, drainage arrows, location of erosion control, and details of retaining walls are some of the key elements featured on this plan. Cuts and fills are the most common aspects of any grading plan. The former refers to the material that is removed from the land, and the latter refers to the material used to fill an area.
Components of a Trail Design
Trailbuilding varies from large-scale land development in that the construction activity occurs in an undeveloped, natural area and the intent is to maintain the topography and drainage of the natural area. To direct a trailbuilder on where to build, trail design is focused on defining the corridor within which a trailbuilder can construct trail. That corridor is defined as 50 feet fram either side of the corridor centerline, which is represented on the trail design mapping as a linear alignment. The trailbuilder takes the alignment (given to them as a flag line on the site and as a georeferenced PDF map) and the trail design information (given to them in Trail Matrix, Quantity Inventory Matrix and Crossing Matrix) and makes a final determination about where the final trail tread centerline fits best within allowed corridor. Once that determination has been made, the trailbuilder will clear the corridor (See Figure 1) and establish the trailbed.
The trailbed will follow the contours of the site, and trailbuilding activity will result in no net fill or cut along the trail corridor. The trail will be constructed to minimize potential erosion, and the primary tool for accomplishing this is the use of outsloping and rolling grade dips (See Figures 2 and 3.
Forest Ridge Mountain Bike Trails Extension | Page 17 of 33
Saw branches flush with trunk rather Than cutting into ihe tree.
Original trai alignment
Figure 2: Diagram of a rolling grade dip
Forest Ridge Mountain Bike Trails Extension | Page 18 of 33 s te
Roln collects on hill anc . ' or : flows down in dispersed ' eee ee 9 shoots, called sheet flow co, ' 8 7
Water runs across trail ihat hrs o sustainable
8 grade and outsioped tread
Figure 3; Diagram of sheet flow across a trail with gentle outsloping
Forest Ridge Mountain Bike Trails Extension | Page 19 of 33
Sedimentation and Erosion Control
Trailbuilding activities will conform to the State of North Carolina sedimentation and erosion control requirements outlined in the Sedimentation Pollution Control Act of 1973.
A buffer zone around the lake will be required such that visible siltation will be kept in the 25% of the buffer zone nearest the trailbuilding activity.
Any slope generated during trailbuilding activity may not be so steep that it is impossible to prevent erosion from them by promoting the establishment of natural groundcover.
Groundcover or other erosion control devices must be in place within 21 days of completion of any segment of trail. Groundcover may be plants, mulches, duff, natural debris, rocks, etc that hold the soil in place, Permanent groundcover must be in place within 15 working days or 90 calendar days after completion of a segment of trail. Groundcover will be established with passive natural revegetation. Passive revegetation allows surrounding vegetation to colonize the abandoned trail. This process works when erosion has been stopped, precipitation is adequate, the tread has been scarified, and adjacent vegetation spreads and grows rapidly.
Rock armoring may be used to prevent soil erosion in areas where sustainable trail construction alone (rolling grade dips, well compacted tread, outsloping of tread, etc) will not limit soil erosion.
Forest Ridge Mountain Bike Trails Extension | Page 20 of 33
Tread Construction Types
Developing a sustainable trail system at Forest Ridge Park property will require multiple tread canstruction methods, which have been called out by location on the Concept Plan map. Each special construction type is briefly explained for reference in reviewing the Cancept Plan map and Trail Inventary.
Full Bench Cut Trail Full Bench Cut Trail is a section of trail tread cut across the side or contour of t hill, A full bench is constructed by cutting the full width of the tread into the hillside. Finished tread cross slape should be 3%-5%. The entire tread is dug dawn to campacted mineral sail. This design creates a constant and stable tread. Drainage is provided by use of grade reversals along the trail alignment.
Lift & Tilt Trail Lift and Tilt trailis specified in flatter areas (defined as where the hill slide slope is less than 5%) where the tread prism must be elevated and shaped to enhance drainage and flow. This tread type uses near to trail borrow pits to source mineral soil to create the elevated tread. Drainage is achieved at grade where possible, but occasional use of culverts below the trail tread will be required to achieve positive drainage along the entire trail.
Turnpike Turnpike Tread is specified in flatter areas (defined as where the hill slide slope is less than 5%) is recommended to be constructed in a superelevated manor that allows passage of water under the tread. This method of construction elevates the trail above the prevailing grades a minimum of 18 inches with culverts placed at set intervals. This trail Is primarily called out through the Western Loap.
Boardwalks and Bridges In some areas of the property, trail must be continued over soils that cannot support natural surface trail construction. At Forest Ridge, these areas are located at natural drainage areas and ravines, Here a boardwalk, punchean or short span bridge is specified. Both are constructed as lumber structures supporting a rot-resistant wood decking for trail users to travel over.
Handrailing will be installed in sections where the distance from the top of the decking to the existing grade below exceeds 3 feet. The Crossing Inventory outlines the specifications foreach crossing and the Trail Design Map details the location of each crossing.
Forest Ridge Mountain Bike Trails Extension | Page 21 of 33
Trail Feature Types
Trail Features are what make a trail experience unique and specific to each location or trail system. Bike specific trail features are essential to creating a high-quality mountain bike trail experience.
Berm A berm is a banked turn designed to help a rider change direction while maintaining speed and maximizing traction. A berm is typically larger both in terms of height and radius than an in-sloped turn. Rollers or Grade Reversals / rollers should be incorporated into the approach and exit of a berm for drainage purposes.
Climbing Turn
Acclimbing turn has trail tread at each end of the turn that is fully bench cut and are typically constructed on hillside slopes of 20% or less. The connection between the approach and exit of the climbing turn is a larger radius which allows for a flatter cross slope within the radius of the turn. Grade Reversals should be incorporated into the approach and exit of a climbing turn for drainage purposes.
Drop
A ledge that is tao tall fora rider to rall down. With enough speed and proper technique, a rider can ride off the drop so that both wheels are in the air briefly before landing back on the ground.
A drop can vary fram beginner to expert level and be made out of dirt, rack, wood, metal, engineered materials, or any combination of these materials, Due to the momentum required to ride a drop, these features are typically only built on flat or descending trail. Specific to this project, a drop would be incarporated per the request of the client as an optional feature within the trail project. Materials to construct this feature would need to be imported to the site.
Jump A Jump isa feature designed to send a rider upward into the air. A Jump consists of a takeoff and landing, with space between the two. Jumps can be designed asa Step Up/ Step Down, Gap or Table Top. Designing and building jumps require a high degree of skilland experience. A jump section or jump line refers to a section of trail with multiple jumps in a row, The skill level af a jump can vary from beginner to expert. Materials to construct jumps could be native to the project site, requiring material to be excavated from a site away from the trail and hauled to the jump location. Using imported rock for the lips of jumps would decrease maintenance of the feature, and increase the predictability of the feature. Materials required to construct a rock lip would need to be imparted to the site. Specifying a prefabricated metal frame with rot resistant wooden decking for the lip of the jumps is another option that would require less angoing maintenance and would increase the predicably of the feature, at an increased cast.
Forest Ridge Mountain Bike Trails Extension | Page 22 of 33
Ledge
4 ledge is a vertical face that a rider must either ride up or down, Ledges can appear naturally or they can be constructed. Ledges can be made out of dirt, rack, wood, metal, engineered materials, or any combination of these materials. Ledges can be located on flat, climbing or descending trails, or a combination of all three. Specific to this project, a ledge would be incorporated per the request of the client as an optional feature within the trail project, Materials to construct this feature would need to be imported ta the site, In-sloped Turn In-slaped turns are similar to in-sloped tread which allows a rider to keep their bike perpendicular ta the ground for maximum traction, reducing the need for breaking or slowing down, In-sloped turns are proportionately smaller than Berms as described above, Grade Reversals should be incorporated into the approach and exit of a climbing turn for drainage purposes.
Rock Armoring Rock Armoring refers to a section of trail that has rock slabs or flagstone embedded into the tread. Rock Armaring would be used to harden the trail tread surface for at grade crossings or gullies. The purpose of rack armoring is to reinforce crossing locations, and stabilize sections of trail that transition into / out of at grade crossing locations, The tread surface of rock armoring is to remain relatively smooth, and represent the intended surface of the rest of the trail it can be found on. Materials ta construct this feature would need to be imported to the site.
Rock Garden A Rock Garden refers to a section of trail that has racks embedded into the tread. Rock Gardens can add difficulty and texture to the trail tread surface and can be optional or mandatary features based on the difficulty rating of the trail they are located on. Rock Gardens may also be lacated on Flat, Climbing, or Descending sections of trail. Specific to this project, Rock Gardens would be incorporated per the request of the client as optional features within the trail project.
Materials to construct this feature would need to be imported ta the site.
Roller
Rollers are grade reversals that have been shaped and spaced to optimize a fluid riding experience. Rollers are commonly found on modern flow trail. Rollers also aid in proper drainage for the trail tread.
Skinny
A*Skinny" is a narrow section of trail that requires increased skill, focus and balance for the rider ta navigate. Skinnies are commonly constructed out of downed trees, lumber, rock ar can be purpose-built metal framed features, Skinnies are commonly found as optional lines on beginner or intermediate trails, but can be the only line on advanced or expert level trails. Rot resistant materials should be used when constructing skinnies. Specific to this project, Skinnies would be incorporated per the request of the client as optional features within the trail project. Materials to construct this feature would need to be imported to the site, Forest Ridge Mountain Bike Trails Extension | Page 23 of 33
Table Top Jump
A table-top jump feature has trail tread connecting the top of the jump with the top of the landing to provide a safe landing area and promote progression (may only be located on directional downhill sections of the Western Loop). Specific to this project, Table Top Jumpis)} would be incorporated per the request of the client as optional features within the trail project.
Materials to construct this feature could be native to the project site. Using imported rock for the lips of Table Top Jumps would decrease maintenance of the feature, and increase the oredictability of the feature. Materials required to construct a rock lip would need to be imported to the site.
Trail Feature Example Photos
Figure 1: Conceptual experience representing rock armoring at grade crossings
Forest Ridge Mountain Bike Trails Extension | Page 24 of 33 gure 2: Conceptual experiences representing a boardwalk sections of trail
Forest Ridge Mountain Bike Trails Extension | Page 25 of 33 ure 4; Conceptual experience representing Turnpike Tread construction seen in areas with flatter natural cross slopes.
Forest Ridge Mountain Bike Trails Extension | Page 26 of 33
Figure 5: Conceptual experience representing Benchcut Tread construction, Forest Ridge Mountain Bike Trails Extension | Page 27 of 33
Combo Rock/Prefabricated Technical Trail Feature with Jump
Downhill Trail Rollers, Tables and Mini-Berms Skinny, Ladder Bridge, or Boardwalk with
Features
Figure 5: Sample Options for Technical Trail Features.
Forest Ridge Mountain Bike Trails Extension | Page 28 of 33 i 6: Rider hits a constructed drop. Example of an optional feature constructed within the proposed trail design.
Forest Ridge Mountain Bike Trails Extension | Page 29 of 33
Construction Budget Estimate
The Construction Budget Estimate provides a budgetary estimate for each of the trail desiqn items identified. If this project maves forward to the construction phase, cost estimates will be refined upon the completion of a comprehensive schedule of work items.
Forest Ridge Trail Extension
CONSTRUCTION COST ESTIMATE
TRAIL CONSTRUCTION
ary Unit
Lump Sum $74,712
TOTAL
$74,712) Item $/Unit
Trail 100 (Intermediate Flow Connector)
Trail 101 (Intermediate Flow Loap) Lump Sum | $167,180)
200 (Advanced Connector) Lump Sum $35,920] i
201 (Advanced Loop) pl Lump Sum | $121,724
L, 202 (Advanced Connector) Lump Sum $45,370
203 (Advanced Loop) Lump Sum $44,800
204 (Advanced DH Spur) Lump Sum $8,665
SUB-TOTAL: WORK ITEM 1
TOTAL:
Table 7; Construction Budget Estimate for all trails presented in design report. Estimates pravided for the purposes of financial planning & fundraising.
Forest Ridge Mountain Bike Trails Extension | Page 30 of 33
Summary
Forest Ridge Park has potential for develapment into an engaging, nature-based space for park visitors of all ability levels and the local trail user community. While the development near and on the site presents same constraints, the location of the site will make for @asy access toa large population of current and future riders. The inclusion of feature-rich mountain biking trails for intermediate to advanced riders will make this a valuable addition to the existing Forest Ridge Park trail system.
Forest Ridge Mountain Bike Trails Extension | Page 31 of 33
Recommended Next Steps
1. Schedule a review meeting: Winter 2023 /2024
a. Discuss feedback on Trail Design Report.
b, Refine the project scope to meet intended goals and fulfill stakeholder needs.
c, Schedule any required design phase specification, constructian documentation or design-build phase of this project when funded.
2. Permitting & Construction Planning Stage: Winter 2025/2024
a. With an approved trail design and flagging completed, permitting and construction planning is the next step towards construction.
3. Construction Stage: Spring / Summer 2024 a, Construction could commence in Spring 2024 if approvals and funding are available. Trail construction scope is dependent on budget, available construction weather window, and contractor availability.
Enclosures e Western Trail Matrix (full size}
Western Quantity Matrix (full size)
Western Trail Crassing Report (full size}
Western Mapping (full size)
Southern Trail Matrix (full size) Southern Quantity Matrix {full size} Southern Trail Crossing Report (full size} Southern Mapping (full size)
Boardwalk Design and Construction Guidelines
Boardwalk Crossing Typical Drawings
Erosion Control and Vegetation Establishment for State Construction Office
« Crossing Framing Plan for State Construction Office
References e Mountain Bike Development Guide Lines for Successfully Managing the Process (2023)
° Guidelines for a Quality Trail Experince (2016) e Bike Parks: IMBA8s Guide to New School Trails (2014)
«Trail Solutions: IMBA9s Guide to Building Sweet Singletrack (2004)
Forest Ridge Mountain Bike Trails Extension | Page 32 of 33
Prepared By
Matt Britton, PE
Design Project Manager
Rock Solid Trail Contracting
Josh Blum
Trail Planner / Designer
Rock Solid Trail Contracting
With Input from Matt Torvenin
Trail Planner
Elemental Industries, LLC
Forest Ridge Mountain Bike Trails Extension | Page 33 of 33
City of Raleigh, Forest Ridge Mountain Bike Trails
Extension Design Report
Enclosures
Western Trail Matrix (full size)
Western Quantity Matrix (full size)
Western Trail Crossing Report (full size)
Western Mapping (full size)
Southern Trail Matrix (full size)
Southern Quantity Matrix (full size)
Southern Trail Crossing Report (full size)
8Southern Mapping (full size)
Boardwalk Design and Construction Guidelines
Boardwalk Crossing Typical Drawings
Erosion Control and Vegetation Establishment for State
Construction Office
Crossing Framing Plan for State Construction Office
Forest Ridge Mountain Bike Trails Extension
SBSTYPS] Go = YEH, SB. T}RBY 6-2 = Paw. S2uNBy Z| = OT, ~ COOL Jay <SATUELSIp Jeng pabesaae s) fouanba.4 suniesy |
53198
Criseuema | (up@pimnsee | sesnpmeiie, | uonasag | fouenbuay | odfine | soon be ~ | peauitg [Buney Minaya) amen nea Payangsued amyesy ASH
PepuewWooay
SUEY HELL doo] WwayseA, Western Loop Quan Ss Inventory Ma
Estimated
Deseription Tread Width Units Quantity Comments
Intermediate / Bike a Intermediate FlowTrail i re Bench Cut Trail Construction in areas that offer
Optimized Flow 36 Le 1,809 " (Bench Cut) Trail opportunity for natural drainage.
fai 8 Lift & Tilt Tread Constructionin areas that have a natural
8 Intermediate / Bike - Intermediate FlowTrail cross slope of less than 5%and offer little ta no
. 8Optimized Flow 36° Lr 2,531 ¥ (Lift & Tilt) Trall opportunity for natural drainage. Quantity represents an
: estimated 15% of total trail length.
= Turnpike Construction in areas that are flat, that have a i _ [intermediate / Bike Intermediate FlowTrail - r natural cross slope of lass than 6%and offer little ta no
Optimized Flow 36 LF 2,53) :
(Turnpike) Trai opportunity for natural drainage, Quantity represents 15% Ht of total trail length, Sith lin Radics Intermediate / Bike rn ger Radiu : ; :
vee a Optimized Flow a" EA a Larger wide climbing turns or berms Flow Trail) E
Trail
Rock Armoring to be used in low grade, predominately dry
At Grade Crossing{Rock Intermediate! 94-48" LF aan ditches, gulley's and depressions that may convey water at}
Armaring) Advanced some point, Width of Rock Armoring ta be 48" See
Crossing Matrix for details
Used at predomimately dry water crossing locations and
| at guiley's or depressions where a culvert pipe would Intermediate / P
Boardwalk Ad 8 36" LF 70 restrict potential flow. Boardwalk deck elevation would be Vance:
? max, and not require hand rails.