This file is an appendix to technical specifications for the Chiller Replacement Project at Fremont, managed by the California Department of Education in partnership with the Department of General Services. The project involves comprehensive mechanical and HVAC system installation and commissioning at 39350 Gallaudet Drive, Fremont, Alameda County, California (Project Number 000000000009478). The scope of work encompasses complete Division 20 and Division 23 mechanical systems including hydronic piping, chillers, pumps, valves, controls, instrumentation, vibration isolation, mechanical insulation, and water treatment systems. All work must comply with 2022 California Building Code standards and applicable ASHRAE guidelines. The project director is Randi Chegwidden at the Department of General Services, with Stantec serving as the mechanical and electrical engineer consultant (contact: Mehran Khazra, PE). Contractors must submit detailed submittals including product data, shop drawings, welding certificates, and as-built drawings in electronic format. Pre-functional checklists, startup documentation, testing and balancing reports, and commissioning verification are required before substantial completion. The work requires coordination among mechanical, electrical, and controls contractors, with formal commissioning meetings scheduled throughout construction phases.

The contract specifications mandate that all Division 20 and 23 scope work include complete and functional systems with all required materials, labor, equipment, and services to achieve the desired final product. Contractors bear responsibility for all permits, inspections, certifications, utility fees, and connections. Testing, adjusting, and balancing work must achieve specified tolerances (plus 10 percent/minus 5 percent for air outlets; plus/minus 10 percent for hydronic systems) and comply with AABC, ASHRAE Standard 111, or SMACNA standards. Water treatment chemicals must be in solid form with service agreements provided for one year from substantial completion. All equipment warranties extend minimum one year from date of acceptance, with specific extended warranties for chillers, water treatment systems, and VFD controllers. Commissioning includes prefunctional checklists, functional performance testing, operator training (minimum 40 hours), and documentation in indexed bound commissioning record books. Contractors must provide qualified, factory-trained personnel for all startup, testing, commissioning, and training activities, with all costs included in contract pricing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFICATIONS PAGE

00 01 05 - 1 000000000009478

SECTION 00 01 05

PROJECT TITLE : CHILLER REPLACEMENT FREMONT

AGENCY : CALIFORNIA DEPARTMENT OF EDUCATION

LOCATION : 39350 GALLAUDET DR

FREMONT, ALAMEDA COUNTY, CALIFORNIA

PROJECT NUMBER : 000000000009478

PROJECT DIRECTOR : Randi Chegwidden, Project Director I State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (279) 240-6605 / (916) 693-3903 Email: randi.chegwidden@dgs.ca.gov

CONSULTANT : Stantec Mehran Khazra, PE Telephone Number: (415) 281-5458 Email: Mehran.khazra@stantec.com

ELECTRICAL ENGINEER MECHANICAL ENGINEER STRUCTURAL ENGINEER

ARCHITECT

00 01 05 - 2 000000000009478

PROJECT TITLE : CHILLER REPLACEMENT FREMONT

LOCATION : 39350 GALLAUDET DR

FREMONT, ALAMEDA COUNTY, CALIFORNIA

PROJECT NUMBER : 000000000009478

REGULATORY REVIEWS:

STATE FIRE MARSHAL

ACCESS COMPLIANCE

TABLE OF CONTENTS

00 01 06 - 1 000000000009478

SECTION 01 00 06

TABLE OF CONTENTS

Division 20 - General Mechanical

20 00 00 General Mechanical Requirements

20 05 00 Common Mechanical Work Results

20 05 13 Common Mechanical Motor Requirements

20 05 14 Variable-Frequency Motor Controllers

20 05 19 Meters and Gauges

20 05 23 General-Duty Valves for Piping

20 05 29 Hangers and Supports

20 05 48 Vibration and Seismic Controls

20 05 53 Mechanical Identification

20 07 00 Mechanical Insulation

20 08 00 Mechanical Commissioning

Division 23 - Heating, Ventilating, and Air-Conditioning (HVAC)

23 00 00 General HVAC Requirements

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 09 00 Instrumentation and Control for HVAC

23 09 50 Refrigerant Monitoring Systems

23 21 13 Hydronic Piping

23 21 16 Hydronic Piping Specialties

23 21 23 Hydronic Pumps

23 25 00 HVAC Water Treatment

23 64 16 Centrifugal Water Chillers

END OF SECTION

GENERAL MECHANICAL REQUIREMENTS

20 00 00 - 1 000000000009478

SECTION 20 00 00

GENERAL MECHANICAL REQUIREMENTS

PART 1 GENERAL

1.01 SCOPE OF WORK

A. It is intended for the Division 20 and 23 scope of work to include complete and functional systems - including all required materials, labor, equipment, and services necessary to achieve the desired final product. It is further intended for the Division 20 scope of work to include coordination with Division 23 for complete HVAC systems.

1.02 COORDINATION OF DIVISIONS 20 AND 23

A. Divisions 20 and 23 are used to communicate the requirements for the HVAC scope of work.

1.03 GENERAL REFERENCES

A. This section applies to all Division 20 and 23 work. The Division 20 and 23 Contractor shall ensure that all Division 20 and 23 work described throughout other specification sections and on the drawings is in accordance with this section.

B. Refer to Division 1 Specification which is to be used with the scope of work for this project as shown on the drawings and in the specifications. This includes Bidding Requirements, Conditions of the Contract, and Supplementary Conditions. It is the Contractor’s responsibility to be aware of all information and requirements included in these locations, and to include those requirements as part of the Division 23 scope of work and associated disciplines.

C. It shall be understood by the Contractor that Divisions 20 and 23 information is intended to serve as a single document, and each section of these specifications directly or indirectly relates to all other sections. As such, each section does not attempt to identify every other Division 20 and/or 23 section that is related. Significant references to information outside of Division 20 and 23 are, however, occasionally provided for informational purposes. This information is provided to assist in coordination, but the lack of a reference to another portion of the Contract Documents does not relieve the Contractor of the responsibility for coordination with other sections of Divisions 20 and 23 and all other trades.

1.04 RELATED REQUIREMENTS

A. References to other Divisions and Sections of these specifications are occasionally provided to assist in coordination. These references are not intended to be comprehensive. It is the responsibility of the Contractor to coordinate between specification Sections and Divisions, and ensure any coordination with other Sections or Divisions necessary for compliance is executed.

1.05 REFERENCE STANDARDS

A. References to industry standards, testing procedures, etc. are noted in individual sections of these specifications. The requirements and standards from the referenced documents shall be considered part of the requirements of these specifications.

1.06 APPLICABLE CODES AND STANDARDS

A. Division 20, and 23 work shall be performed in accordance with applicable codes and standards as adopted by the authorities having jurisdiction including amendments. Following is a listing of major codes and standards, the requirements of which shall be considered part of the scope of this project. This list should not be considered comprehensive, and codes or standards not included in this list should not be excluded from the scope of the project.

1. Applicable Local Codes and Ordinances

a. General

1) 2022 California Building Code

2) 2022 California Plumbing Code

3) 2022 California Fire Code

4) 2022 California Mechanical Code

5) 2022 California Electrical Code

20 00 00 - 2 000000000009478

6) Local Safety Authority Safety Standards Act

7) Local Safety Authority Power Engineers, Boiler, Pressure Vessel, and

Refrigeration Safety Regulation

8) Local Electrical Safety Regulation

9) Local Electrical Safety Branch Bulletins

10) Local Elevating Devices Safety Regulation

11) Local Gas Safety Regulation

12) Local Code Amendments, Gas Safety Act & Regulations

13) Local Provincial Occupational Health & Safety (OHS) Regulations

14) Local Safety Standards Act

15) ANSI/ASME

(a) ASME/ANSI B31.9 Building Services Piping

(b) ASME B31E Standard for the Seismic Design and Retrofit of Above-Ground

Piping Systems, Includes Addenda A

16) National Fire Protection Association

(a) NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems

17) SMACNA Publications

(a) SMACNA 001 Guidelines for seismic restraints of mechanical systems

(b) SMACNA 006 HVAC Duct Construction Standards, Metal and Flexible

(c) SMACNA 012 HVAC Air Duct Leakage Test Manual

(d) SMACNA 014 HVAC Systems Commissioning Manual

18) ASHRAE Standards

(a) ASHRAE Standard 15.2 Safety Standard for Refrigeration Systems in

Residential Applications

(b) ASHRAE Standard 34 Designation and Safety Classification of Refrigerants

(c) ASHRAE Standard 202 The Commissioning Process for Buildings and

Systems.

(d) ASHRAE/NIBS Guideline 0 The Commissioning Process

(e) ASHRAE Guideline 1.1 HVAC&R Technical Requirements For The

Commissioning Process

(f) ASHRAE Guideline 1.3 Building Operations and Maintenance Training for

The HVAC&R Commissioning Process

(g) ASHRAE Guideline 1.4 Procedures for Preparing Facility Systems Manuals

19) United States Latest Edition

(a) Americans with Disabilities Act (ADA)

(b) National Electrical Code

1.07 ABBREVIATIONS AND ACRONYMS

A. The following are industry abbreviations used in these specifications:

1. AHJ: Authority Having Jurisdiction

2. ASJ: All-service jacket

3. BAS: Building automation system

4. BR: Butyl rubber; Buna-N: Nitrile rubber

5. CR: Chlorosulfonated polyethylene synthetic rubber

6. CSM: Chlorosulfonyl-polyethylene rubber

7. CWP: Cold working pressure

8. DDC: Direct digital control

9. DOP: Dioctyl phthalate or bis-(2-ethylhexyl) phthalate

10. EMCS: Energy Management and Control System

11. EMS: Energy Management System consisting of BAS (typically with a PC and support software), DDC controllers, and networking software/hardware/wiring.

12. EPDM: Ethylene-propylene-diene terpolymer rubber

20 00 00 - 3 000000000009478

13. FOG: Fats, oils, and greases

14. FRP: Fiberglass-reinforced plastic

15. FSK: Foil, scrim, kraft paper

16. FSP: Foil, scrim, polyethylene

17. HDPE: High-density polyethylene plastic

18. HEPA: High-efficiency particulate air

19. I/O: Input/output

20. LLDPE: Linear, low-density polyethylene plastic

21. MS/TP: Master slave/token passing

22. MSS: Manufacturers Standardization Society for The Valve and Fittings Industry Inc

23. NBR: Acrylonitrile-butadiene rubber

24. NC: Noise criteria; NR: Natural rubber

25. NUSIG: National Uniform Seismic Installation Guidelines

26. PE: Polyethylene plastic

27. PC: Personal computer

28. PID: Proportional plus integral plus derivative

29. PMMA: Polymethyl methacrylate (acrylic) plastic

30. PP: Polypropylene plastic

31. PTFE: Polytetrafluoroethylene plastic

32. PUR: Polyurethane plastic

33. PVC: Polyvinyl chloride plastic

34. PVDC: Polyvinylidene chloride

35. RC: Room criteria

36. RTD: Resistance temperature detector

37. SSL: Self-sealing lap

38. SWP: Steam working pressure

39. TFE: Tetrafluoroethylene plastic

40. TPE: Thermoplastic elastomer

41. ULPA: Ultra low penetration air

1.08 DEFINITIONS

A. The following definitions shall apply to the use of these words when used in Division 20 and 23.

These definitions are not intended to define use of these words outside of Division 20 and 23.

B. Acceptance: The Owner’s assumption of ownership of the Mechanical systems.

C. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures.

Examples include installations within unheated shelters.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in duct shafts.

E. Contractor (The Contractor, This Contractor, Division 20 and 23 Contractor, etc.): The contractor responsible for the Division 20 and 23 scope of work.

F. Date of Acceptance: The official date when Acceptance occurs. This will coincide with the granting of Substantial Completion unless noted otherwise by the Owner’s Representative. It shall not be assumed that the Date of Acceptance has deviated from Substantial Completion unless written documentation is provided by the Owner’s Representative indicating differently.

G. Electrical: Shall be considered interchangeable with "Division 26".

H. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

I. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

20 00 00 - 4 000000000009478

J. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

K. Mechanical: Shall be considered interchangeable with “Division 20 and 23”.

L. Owner’s Representative: The primary consultant or their designated representative, as outlined in the General Conditions.

M. Provide: Furnish and install.

N. Uncurated Definitions

1. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

2. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

3. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

4. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and chases.

5. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.

6. ABMA: American Bearing Manufacturers Association.

7. IEEE: Institute of Electrical and Electronics Engineers.

8. NEMA: National Electrical Manufacturers Association.

9. MG 1: (NEMA) Motors and Generators Standard.

10. VFD: Variable frequency drive.

1.09 SUBMITTALS

A. General

1. The Contractor is responsible for identifying all required submittals throughout these specifications, and following the required procedures for each type of submittal.

B. Action Submittals

1. Submittal information shall be provided and approved on all materials and equipment prior to ordering.

2. Materials or equipment that are procured, and work that is executed, without completing

Action Submittal review shall be at the Contractor's risk.

3. Review will be for general conformance only and shall not relieve the Contractor for any deviations from the requirements of the documents unless clear written reference is made by the Contractor in the submittal to proposed deviations.

a. Exceptions: FEMCS submittals can be provided separately. At the discretion of the

Owner’s Representative, partial submittals may be provided. If allowed, provide a table indicating submittal status with each submittal, and provide an initial submittal with all required tabs and space for all current and future submittals.

4. Provide one file per division containing one bookmarked PDF file with each bookmark corresponding to each Specification Section. Arrange bookmarks in ascending order of Specification Section number. Individual submittals sent piecemeal will be returned without review or comment. At Contractor’s option, four separate submittals may be provided consisting of long lead items, underground/site work, building work, and building automation system. Deviations will be returned without review.

5. All submittals must be provided as clearly marked and highlighted to identify which subsection of the specifications is being submitted. Submittals must clearly cross out or remove items in the submittal that do not apply to the project.

6. Provide product submittals and shop drawings in native/searchable PDF format. Scanned copies are not acceptable. Locked submittals are not acceptable.

20 00 00 - 5 000000000009478

a. A maximum of two resubmittals are included. If there are three or more resubmittals, the contractor is responsible to pay for the review by the owner and engineer of record.

7. Provide indication of which options and accessories are to be included.

8. Include all scheduled information for equipment listed in schedules on the drawings.

9. Efficiency Standards

a. Units requiring more than a 5% increase in power input beyond the scheduled equipment to meet design capacities will not be considered equal.

b. Units requiring more than a 15% increase in fan brake horsepower over the scheduled equipment to meet the design flow and external static pressure requirements will not be considered equal and will not be accepted.

C. Informational Submittals

1. Submit Informational Submittals for documentation purposes.

D. Operation and Maintenance Materials

1. Provide operation and maintenance data for individual equipment after initial submittals have been reviewed.

2. Operation and Maintenance Manuals shall be provided in three post binders capable of having materials added or removed. Standard clasp-type binders are not acceptable.

Binders with overlapping, telescoping posts shall be used.

3. Provide a title page at the beginning of the manual with the project title, date, Architect, Engineer, and Contractor. Also provide a master index. The title page and index shall be provided at the beginning of each volume when multiple volumes are required.

4. Organize the manual into five divisions: Contacts, Equipment, Maintenance Schedule and Extra Materials, Energy Management and Controls System, Warranties and Certifications.

a. Contacts division: Division shall consist of name, address, and phone number of the following parties: Architect, Mechanical Engineer, Electrical Engineer, General Contractor, Mechanical Contractor, Plumbing Contractor, Sheet Metal Contractor, EMCS Contractor, Electrical Contractor and major equipment suppliers.

b. Equipment division: Provide a separate section for each section of the specifications.

Each section shall include, at a minimum, the following for each item of Division 20 and 23 equipment.

1) Performance curves or tables showing the specified operating points and the operating points after final testing and balancing

2) Manufacturer’s maintenance instructions: Instructions shall include name of vendor, installation instructions, parts numbers and lists, operating instructions for equipment, maintenance and lubrication instructions, troubleshooting guides, and overhaul specifications for major equipment.

3) Wiring diagrams

4) Step-by-step procedures for putting each piece of mechanical equipment into operation

5) Refer to individual specification sections for additional information required to be incorporated into the Operation and Maintenance Manual.

c. Maintenance Summary and Extra Materials division: Division shall include two sections.

1) The first section shall consist of a preventative maintenance schedule summary table (or list). The table shall be organized by specification section and include equipment name and designation as it appears on the equipment schedule, equipment location, and type and frequency of preventative maintenance requirements (including lubrication).

2) The second section shall consist of a list of extra materials furnished under this contract. The list shall be organized by specification section and include equipment name and designation as it appears on the equipment schedule, extra material(s) furnished, and verification by an owner’s representative that

20 00 00 - 6 000000000009478 material(s) have been provided. List shall be similar to that included at the end of this section.

d. Energy Management and Controls System division: Division shall be as specified in 230900 (Instrumentation and Control for HVAC).

e. Warranties and Certificates division: Division shall include

1) Test and balance reports

2) Test records of piping, tanks, ductwork, etc

3) Signed checklist of Instruction Period

4) Certificate from Health Department indicating acceptance of domestic water quality

5) Copies of specific product Warranties

6) Copies of certified factory start-up reports

7) Valve tag identification schedules

8) Fire sprinkler system certification

5. Prior to binding, submit one copy of Operation and Maintenance Manual to Owner’s Representative for review. After this review and final approval of the manuals, prepare two

(2) copies of approved manuals for use during the instruction period. Following instruction period, turn over both copies to the Owner.

6. Manuals may be compiled in multiple volumes if necessary for ease of use.

E. Record Documents

1. Maintain a set of Contract Documents dedicated for record drawings. These documents shall incorporate all clarifications and changes provided by the Owner’s Representative, as well as field changes made by the Contractor. All markings shall be neat and legible.

Turn over documents to the Owner’s Representative at the completion of the project.

2. Submit record documents that include accurate dimensioned record drawings of all underground work, above ground piping, and ductwork systems. Record documents shall be submitted in electronic format.

1.10 WARRANTIES

A. General Warranty Requirements

1. The warranty period shall begin at the date of Substantial Completion.

2. If temporary use of equipment and/or systems is allowed prior to substantial completion, that shall not initiate the warranty period unless specifically noted otherwise. The warranty period shall be extended for equipment and systems as required to comply with the project warranty requirements.

3. Provide software and firmware updates for all equipment and systems that become available during the warranty period.

4. Submit manufacturer warranty and ensure forms have been completed in Owner's name and registered with manufacturer.

B. Special Warranty Requirements

1. Warranty requirements included in individual specification sections are supplemental to the general warranty requirements for the project. All requirements are intended to be additive, and in no way to lessen general project warranty requirements. If general project warranty requirements are more stringent than requirements listed in an individual section, the more stringent requirement shall take precedence.

2. Documentation shall be provided for required additional warranties, and included in Operation and Maintenance Materials.

1.11 QUALITY ASSURANCE

A. Material and Equipment Qualifications

1. Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use shall include applications of

20 00 00 - 7 000000000009478 equipment and materials under similar circumstances and of similar size. The product shall have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.

2. Alternative Qualifications: Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.

B. Service Support: The equipment items shall be supported by service organizations. When requested to gain approval, submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations shall be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

C. Manufacturer's Nameplate: Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

D. UL Listings: All equipment shall be provided with a UL or approved equivalent label when labeling is available for that type of equipment.

E. All control panels shall be UL listed (or equivalent approved label).

F. Pressure vessels shall be provided in accordance with applicable pressure vessel ordinances.

G. All Mechanical equipment shall have an AIC rating of 100,000 or otherwise specified on electrical one-line diagrams fault current for each piece of equipment.

1.12 PRE-INSTALLATION TESTING

A. Perform all required testing prior to installation of the affected systems and equipment.

B. Provide all required documentation of pre-installation testing.

C. When review and acceptance of pre-installation testing and documentation is required, any affected work performed without required acceptance shall be at the Contractor's risk.

1.13 MOCK-UPS AND SAMPLES

A. Provide all required mock-ups and samples prior to proceeding with affected work.

B. Provide all required documentation.

C. When review and acceptance of mock-ups and samples is required, any affected work performed without required acceptance shall be at the Contractor's risk.

1.14 COORDINATION

A. Contractor shall prepare above ceiling coordination drawings for efficient installation of different components and coordination for installation of products and materials fabricated by each trade.

1. Content: Project-specific information, drawn accurately to scale, 1/4 inch per foot . Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate required installation sequences.

c. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Architect for resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

2. Sheet Size: 24 by 36 inches.

3. Number of Copies: Electronic submissions are preferred. Where not feasible, provide the following.

20 00 00 - 8 000000000009478

a. Submit two opaque copies of each submittal. Architect will return one copy.

b. Submit five copies where Coordination Drawings are required for operation and maintenance manuals. Architect will retain two copies; remainder will be returned.

Mark up and retain one returned copy as a Project Record Drawing.

4. Refer to individual Sections for Coordination Drawing requirements for Work in those Sections.

1.15 DELIVERY, STORAGE AND HANDLING

A. Follow manufacturer’s directions in delivery, storage, protection, and installation of equipment and materials.

B. Promptly notify Owner’s Representative in writing of conflicts between requirements of Contract

Documents and Manufacturer’s directions and obtain written instructions from Owner’s Representative before proceeding with work. The Contractor shall bear expenses arising from correcting deficiencies of work that do not comply with manufacturer’s directions or such written instructions from Owner’s Representative.

C. Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.

D. Store ductwork in a clean, dry location. If the location of storage cannot be protected from moisture, keep ductwork above grade level to protect from standing water.

1.16 EXTRA MATERIALS

A. Refer to individual specification sections for specific requirements of extra materials to be furnished under this contract.

B. Provide summarized list of extra materials that have been furnished. List shall include verification by Owner’s Representative that parts have been furnished. Incorporate into O&M Manual. Extra materials list shall be similar to that provided at the end of this section.

1.17 PERMITS AND FEES

A. All permits and inspections required to complete the Division 20 and 23 scope of work shall be included in the prices of the respective divisions’ bid prices. All certifications provided as part of the permit and inspection process shall be provided to the Owner as part of the Mechanical scope of work as specified in these documents.

B. All fees required by utility providers shall be included in the 20 and 23 bid price, including water, connections. This shall include all charges to the project by these agencies, including but not limited to general fees, equipment charges (meters, vaults, etc.), tap fees, and utility main installation charges.

1.18 ALTERNATES

A. Alternate pricing shall reflect a complete and working mechanical system, with specific features and/or portions of the systems designated as base bid or alternate as described.

1.19 SCOPE AND APPROPRIATE USE OF BID DOCUMENTS

A. These specifications and accompanying drawings are intended to communicate the design concept for this project and outline the scope of work. They should not be viewed as a comprehensive document that details every specific task, item, or piece of equipment required to complete the project. It is understood that industry knowledge and experience is required to establish an accurate and complete scope of work from these documents, and it is assumed that the Division 20 and 23 Contractors possess that knowledge and experience. Work not specifically noted in these specifications or the accompanying drawings, but which is required to complete the project, shall be included by the Division 20 and 23 Contractors as part of their scope of work.

B. These specifications and the accompanying drawings are intended to supplement each other.

Information included in either one shall be incorporated into the project as if included in both.

20 00 00 - 9 000000000009478

In the event of any conflicts, the most stringent requirements shall be considered the governing scope of work until and unless clarification can be obtained by the Contractor.

C. In the event of dimensional discrepancies between Division 20 and 23 documents and other disciplines, Structural documents take precedence over Division 20 and 23. Refer to this information for sufficient understanding to the extent that it impacts the Division 23 scope of work.

D. Drawings are intended to indicate the general arrangement of piping, ductwork, equipment and other components of Division 20 and 23 systems. They shall be followed as closely as possible, but shall be considered diagrammatic in nature. They are not intended to show every component, fitting, offset, etc. Components, fittings, offsets, etc. as required to meet the intent of the documents and to achieve coordination with other trades shall be included in the Division 20 and 23 scope of work. Note that more detailed information about routing may be provided for certain areas of the project where special constraints exist. It is the intent of this detailed information to better communicate the constraints, but these drawings and details shall still be considered diagrammatic in nature as outlined above.

1.20 ROUTING AND LOCATIONS

A. It is the Contractor’s responsibility to coordinate equipment locations and system routing with available space and with all other trades.

B. It is the Contractor’s responsibility to coordinate and verify the exact locations and routing of equipment and systems prior to fabrication and installation. If discrepancies become apparent as part of the verification process, the Contractor shall ask for written clarification/direction.

Alteration, removal and/or replacement of work already installed as a result of failure to verify and/or coordinate locations and routing prior to fabrication and/or installation shall be at the Contractor’s expense.

C. Locations of equipment shown on the drawings are approximate unless specifically dimensioned.

D. All ductwork, piping, tubing, conduit, etc. shall be concealed within building construction unless noted otherwise. Mechanical rooms are considered to be within building construction for the purposes of this requirement.

E. Existing utilities, piping, and ductwork have been indicated as closely as possible. The Contractor can assume that points of connection to existing utilities have been shown within 10 feet (3 meters) of the actual location. When actual points of connection are more than 10 feet (3 meters) from the location shown on the drawings, the Contractor shall notify the Owner’s Representative prior to commencing this portion of the work.

F. The Contractor is responsible for any remedial work required from failure to locate and preserve underground utilities. This shall include all work necessary to repair any damaged utilities to their original condition.

1.21 SCHEDULING

A. It is understood that while drawings are to be followed as closely as circumstances permit, the

Contractor shall be responsible for installation of systems according to the true intent and meaning of Contract Documents. Anything not clear or in conflict will be explained by making application to Owner’s Representative. The Contractor shall familiarize himself with his scope of work as well as the required coordination with other trades and the scheduling of other trades sufficiently to address coordination issues in a timely manner such that they do not result in remedial work for other trades.

B. Should conditions arise where certain changes would be advisable, secure approval from Owner’s Representative for those changes before proceeding with work. Proceeding without written approval is at the Contractor’s risk and at the Contractor’s expense.

C. The contractor shall coordinate with the work of various trades when installing interrelated work.

Before installation of mechanical items, proper provisions shall be made to avoid interferences.

20 00 00 - 10 000000000009478

Changes required in work specified in Division 20 and 23 caused by neglect to do so shall be made at no cost to Owner.

D. Inserts and supports required by Division 20 and 23 shall be furnished and installed unless otherwise noted. Furnish sleeves, inserts, supports, and equipment that are an integral part of other Divisions of the Work to those involved in sufficient time to be built into construction as the Work proceeds. Locate these items and see that they are properly installed. Expense resulting from improper location or installation of items above shall be borne under Division 20 and 23.

1.22 CUTTING AND PATCHING

A. The Division 20 and 23 Contractor shall be responsible for all cutting and patching required to complete the Division 20 and 23 scope of work.

B. All patching shall be performed such that it matches existing finishes.

C. The Contractor shall not cut any structural members without first getting approval from the

Owner’s Representative to do so.

D. All cutting and patching required to correct defective or otherwise unacceptable work shall be the responsibility of the Division 20 and 23 Contractor.

1.23 GUARANTEE

A. All Division 20 and 23 systems and equipment shall be guaranteed for a minimum period of one year.

B. Specific equipment and/or systems requiring warranties beyond one year are indicated in the table at the end of this section.

C. The guarantee shall begin at the Date of Acceptance, unless written documentation is provided noting otherwise. When more than one Date of Acceptance is indicated for various portions or specific equipment, the guarantee shall begin at the Date of Acceptance independently for each portion of the system or piece of equipment.

D. Permission to use Division 20 and 23 systems or equipment for temporary heating or other contractor use prior to the Date of Acceptance, as outlined elsewhere in these specifications, shall not constitute the beginning of the guarantee period. The contractor shall make any necessary arrangements to extend equipment and/or system warranties sufficient to maintain the designated guarantee period from the Date of Acceptance.

1. Exception: When temporary heating and or other system use is requested by the Owner for the Owner’s benefit prior to the Date of Acceptance, the guarantee period for the portions of the system or specific equipment requested for use may begin at the time it is put into service. This can only be assumed to have occurred if written documentation is provided indicating such.

1.24 SUBSTITUTIONS

A. When multiple manufacturers are listed in these specifications, equipment can be used from those manufacturers providing they can meet the requirements of the specifications and drawings. This shall include meeting capacity requirements, efficiencies, space and weight limitations, electrical provisions, etc. The detailed information in the specifications, scheduled equipment information, additional drawing information and any specific references to a particular manufacturer and/or model of equipment shall be considered the basis of design.

Other listed manufacturers, even when listed in these specifications, will only be allowed if they meet or exceed that basis of design.

B. Substitutions involving manufacturers not listed in these specifications will not be allowed without written approval. When written approval is requested, information will be reviewed in preliminary fashion for general conformance only. Any approved manufacturers will still be required to meet the requirements of these specifications and the drawings, and final approval during submittal review will only be granted if the equipment meets or exceeds the requirements of the documents.

20 00 00 - 11 000000000009478

C. It is the Contractor’s responsibility when utilizing approved substituted equipment to ensure the equipment will fit within the constraints of the project as detailed using the basis of design equipment (space, weight, power, etc.). Any required alterations by Division 20 and 23 or any other Division of work to accommodate differences between the substituted equipment and the basis of design equipment shall be the responsibility of the Division 20 and 23 Contractor, including the cost of design for the required changes.

D. If the changes required by substituted equipment cannot be accommodated, the Contractor shall be responsible for replacing the substituted equipment with the basis of design equipment.

E. Proposed substituted equipment will not be considered equal if it requires an increase of more than 5% in power usage at design conditions.

1.25 VISITING THE PROJECT SITE

A. The premises shall be examined and conditions shall be understood which may affect performance of work of this Division before submitting proposals for this work.

B. No subsequent allowance for time or money will be considered for any consequence related to failure to examine existing site conditions.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.01 START UP SERVICE

A. Refer to individual sections of these specifications for specific requirements.

B. Start-up shall be performed by a certified representative when required. Prior to start-up, certification of representative shall be forwarded to the Engineer for review.

C. Schedule start-up with the Owner. Perform operation and maintenance training at the time of start-up for equipment requiring start up service.

D. Certified factory start-up is required for the following equipment:

E. Section 200514 - Variable Frequency Motor Controllers F. Section 230900 - Instrumentation and Control for HVAC G. Section 232500 - HVAC Water Treatment H. Section 236416 - Centrifugal Water Chillers

3.02 CLEANING

A. Leave all equipment and systems in a clean and new condition at the completion of the project.

Clean all piping and ductwork exposed in finished spaces. Remove all stickers from equipment in finished spaces (plumbing fixtures, etc.). Repair all scratched and damaged equipment to new condition, to include touch-up painting.

3.03 DEMONSTRATION AND TRAINING

A. Provide two training sessions for the Owner. The first training session shall occur prior to substantial completion. The second training session shall occur prior to completion of the warranty period. The content below is required for the first training session. The content for the second training session shall be as requested by the Owner, up to and including all information included in the first training session.

B. Operation and maintenance of mechanical systems utilizing Operation and Maintenance Manual. During the training session, each piece of equipment shall be located, and all information included in the O&M manuals shall be demonstrated to the satisfaction of the Owner’s Representative.

C. Individuals present shall include the mechanical contractors, subcontractors and equipment factory representatives as appropriate. Certified factory representatives shall be present for all equipment requiring certified factory start-up.

20 00 00 - 12 000000000009478

D. Provide a video tape of the training sessions conducted and furnish copies of the tape to the Owner. Video tapes shall be of sufficient quality to allow training of future employees or refresher training of personnel. Turn over to the Owner in DVD format.

E. The two training sessions shall each occur in one consolidated session for all mechanical equipment.

1. Exceptions:

a. Training for equipment requiring certified factory start-up shall be conducted at the time of start-up.

b. Multiple sessions shall be scheduled as required to maintain a maximum allowable duration of any single session of four hours.

c. When separate training sessions are warranted to achieve proper training on all equipment and systems, as determined by the owner’s representative, multiple sessions shall be scheduled as required.

d. EMCS system training shall occur independently, and shall be in accordance with the requirements of Section 23 09 00 .

e. Training session shall include all equipment included in the table at the end of this section. A table similar to this one shall be used to verify owner training has been completed on all equipment, and shall be included in the Operation and Maintenance Manual.

3.04 PUNCH LISTS

A. Notify the Owner’s Representative in writing when the project is ready for punch lists.

B. When all punch list items have been addressed, notify the Owner’s Representative in writing that the project is ready for a backcheck of completed punch list items. Include a copy of the original punch list with each completed item initialed and any required notation indicating if something was not completed and why.

C. If, at the time of the backcheck, items are found that continue to be in non-conformance with the project documents, these items will be forwarded to the Contractor. Completion of these items shall be required to achieve substantial completion. All site visits required beyond the initial punch list and initial back check visits, including visits required to verify completion of these remaining outstanding items, shall be charged to the Contractor at normal billing rates.

COMMON MECHANICAL WORK RESULTS

20 05 00 - 1 000000000009478

SECTION 20 05 00

COMMON MECHANICAL WORK RESULTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Pipe, Tube and Fittings.

B. Joining Materials.

C. Transition fittings.

D. Dielectric fittings.

E. Mechanical sleeve seals.

F. Sleeves.

G. Sleeve-Seal Systems.

H. Sleeve-Seal Fittings.

I. Escutcheons.

J. Grout.

K. Silicone Sealants.

L. Mechanical Demolition M. Work in Existing Buildings N. Piping Systems - Common Requirements O. Piping Joint Construction P. Equipment Insulation - Common Requirements Q. Concrete Bases R. Erection of Supports and Anchorages S. Grouting

1.02 GENERAL REFERENCES

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions Specification Sections, apply to this Section. Requirements noted in this Section are supplemental to the requirements of these General References.

B. Division 20, including all Common Mechanical Requirements in Section 20 00 00 , apply to this Section. Requirements noted in this Section are supplemental to the requirements of these General References.

1.03 REFERENCE STANDARDS

A. ASME B1.20.1 - Pipe Threads, General Purpose, Inch; 2013 (Reaffirmed 2018).

B. ASME B16.21 - Nonmetallic Flat Gaskets for Pipe Flanges; 2021.

C. ASME B18.2.1 - Square, Hex, Heavy Hex, and Askew Head Bolts and Hex, Heavy Hex, Hex

Flange, Lobed Head, and Lag Screws (Inch Series); 2012 (Reaffirmed 2021).

D. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless; 2024.

E. ASTM B32 - Standard Specification for Solder Metal; 2020.

F. ASTM B633 - Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel;

2023.

G. ASTM B813 - Standard Specification for Water Flushable Liquid and Paste Fluxes for Soldering of Copper and Copper Alloy Tube; 2024.

20 05 00 - 2 000000000009478

H. ASTM B828 - Standard Practice for Making Capillary Joints by Soldering of Copper and Copper Alloy Tube and Fittings; 2023.

I. ASTM C920 - Standard Specification for Elastomeric Joint Sealants; 2018 (Reapproved 2024).

J. ASTM C1107/C1107M - Standard Specification for Packaged Dry, Hydraulic-Cement Grout

(Nonshrink); 2020.

K. ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules

40, 80, and 120; 2021a.

L. ASTM D2235 - Standard Specification for Solvent Cement for Acrylonitrile-Butadiene-Styrene

(ABS) Plastic Pipe and Fittings; 2022.

M. ASTM D2564 - Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC)

Plastic Piping Systems; 2020 (Reapproved 2024).

N. ASTM D2661 - Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40

Plastic Drain, Waste, and Vent Pipe and Fittings; 2024.

O. ASTM D2672 - Joints for IPS PVC Pipe Using Solvent Cement; Latest Edition.

P. ASTM D2846/D2846M - Standard Specification for Chlorinated Poly(Vinyl Chloride) (CPVC)

Plastic Hot- and Cold-Water Distribution Systems; 2024.

Q. ASTM D2855 - Standard Practice for the Two-Step (Primer and Solvent Cement) Method of

Joining Poly (Vinyl Chloride) (PVC) or Chlorinated Poly (Vinyl Chloride) (CPVC) Pipe and Piping Components with Tapered Sockets; 2020 (Reapproved 2024).

R. ASTM D3138 - Standard Specification for Solvent Cements for Transition Joints Between Acrylonitrile-Butadiene-Styrene (ABS) and Poly(Vinyl Chloride) (PVC) Non-Pressure Piping Components; 2021.

S. ASTM D3139 - Standard Specification for Joints for Plastic Pressure Pipes using Flexible Elastomeric Seals; 2019.

T. ASTM D3212 - Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals; 2013.

U. ASTM F493 - Standard Specification for Solvent Cements for Chlorinated Poly(Vinyl Chloride) (CPVC) Plastic Pipe and Fittings; 2022.

V. ASTM F656 - Standard Specification for Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings; 2021.

W. AWS A5.8M/A5.8 - Specification for Filler Metals for Brazing and Braze Welding; 2019.

X. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2025.

Y. AWS D10.12 - Guide for Welding Mild Steel Pipe; Latest Edition.

Z. AWWA C110/A21.10 - Ductile-Iron and Gray-Iron Fittings; 2021.

1.04 SUBMITTALS

A. Action Submittals

1. Product Data:

a. Transition fittings.

b. Dielectric fittings.

c. Mechanical sleeve seals.

d. Escutcheons.

e. Coordination drawings.

2. Welding certificates.

3. Shop drawings: Submit for all major equipment including, but not limited to the items listed in Division 20 and 23. Submittals shall be provided in electronic format.

4. As-built Drawings: Submit as-built drawings that include accurate dimensioned record drawings of all underground work, above ground piping, and ductwork systems. As-built drawings shall be submitted in electronic format.

20 05 00 - 3 000000000009478

5. Substitutions: The contractors’ base bid must be in accordance with the materials or products specified. Any exceptions to this must be approved in writing by the Engineer, 10 days or more prior to bidding. Voluntary alternates may be submitted for consideration on the proposal, with listed addition or deductions to the base bid, but will not affect the awarding of the contract.

6. Coordination Drawings: Contractor shall prepare coordination drawings for efficient installation of different components and coordination for installation of products and materials fabricated by each trade.

a. Content: Project-specific information, drawn accurately to scale, 1/4 inch per foot. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

1) Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

2) Indicate required installation sequences.

3) Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Architect for resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

b. Sheet Size: 24 by 36 inches

c. Number of Copies: Electronic submissions are preferred. Where not feasible, provide the following.

1) Submit two opaque copies of each submittal. Architect will return one copy.

2) Submit five copies where Coordination Drawings are required for operation and maintenance manuals. Architect will retain two copies; remainder will be returned. Mark up and retain one returned copy as a Project Record Drawing.

d. Refer to individual Sections for Coordination Drawing requirements for Work in those Sections.

B. Informational Submittals

1. Field quality control reports.

C. Operation and Maintenance Materials

1. Operation and Maintenance Manuals: When the building is substantially complete and before the building is taken over by the Owner for maintenance purposes, the contractor shall provide four sets of complete operation and maintenance manuals. The manual shall consist of an indexed loose-leaf binder containing the equipment data, manufacturer’s installation, operating, and maintenance, repair parts manual for each system component, test reports, and as-built temperature control diagrams. Refer to Divisions 20 and 23 for additional submittal requirements. Provide an electronic copy of the operation and maintenance manual in addition to three (3) sets of loose-leaf hard copy binders. Preliminary copy of O&M manuals shall be submitted to commissioning agent for review. Schedule of preliminary submittal will be reviewed with Commissioning Agent at the commissioning kick off meeting.

1.05 COORDINATION

A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for installations.

B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.

C. Under provisions of commissioning documentation; testing of mechanical equipment, as well as training of owner’s operation and maintenance personnel, shall be required in cooperation with the commissioning agent.

D. Refer to the Owner/Utility tie-in schedule.

20 05 00 - 4 000000000009478

E. Each contractor shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work.

F. Each contractor shall coordinate its operations with operations, included in different sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or…