APPENDIX II - SCOPE OF WORK.pdf

PDF 113 KB Posted

Attached to
Withlacoochee State Forest Seed and Longleaf Orchard Irrigation Installation
Solicitation number
ITB-14789
Issued by
Leon County, Florida

About this file

This Scope of Work document outlines the installation requirements for the Withlacoochee Seed Orchard Irrigation Project 2025-2026, prepared by the Florida Department of Agriculture and Consumer Services, Florida Forest Service. The project encompasses the complete installation of irrigation infrastructure across approximately 93 acres, consisting of 3,000 linear feet of six-inch Schedule 40 PVC main distribution lines, 8,500 linear feet of four-inch Schedule 40 PVC feeder lines organized into five feeder lines with spacing intervals of either 30 or 35 feet, ten four-inch valves, six flush-out stations (five four-inch and one six-inch), 283 two-inch PVC risers installed on the feeder lines, 179 two-inch PVC caps, 94 rolls of one-inch polyline (660 feet per roll), 3,920 Maxi-jet winged 340 Full Circle Flat Spray misters with mister stakes and 36 inches of dripline, and all associated fittings, glue, cleaners, hose clamps, 90-degree elbows, and t-fittings. The main distribution lines connect from the well to the irrigation area, with Main Line #1 measuring 1,300 feet, Main Line #2 measuring 560 feet, and Main Line #3 measuring 650 feet. The five feeder lines each contain valves positioned at specific intervals, with mister installation occurring at 30-foot intervals between valve numbers 2 and 3, and at 15-foot intervals between valve numbers 7, 8, 9, and 10. One-inch polyline flush-out caps total 104 units and are installed at the end of each polyline row.

The scope of work specifies that the contractor is responsible for supplying all materials and completing the installation as a turnkey project. The contractor must integrate the new irrigation system with existing well infrastructure at the Withlacoochee State Forest site in Brooksville, Florida. All installation must comply with the specifications outlined, including proper spacing of risers, placement of valves and flush-outs, and integration of the mister system with polyline distribution. The document does not specify pricing structures, bonding requirements, insurance requirements, or contract terms; these details are addressed in the related solicitation documents requiring a mandatory site visit on January 15, 2026, at 10:00 AM, with a sealed bid due date of February 2, 2026, at 5:00 PM, and a 120-calendar-day completion schedule following the Notice to Proceed.

View the file

Other files

File Type Posted
APPENDIX II - SCOPE OF WORK.pdf PDF
ITB FFS 25 26 61.pdf PDF
APPENDIX I - MAP.pdf PDF
ITB FFS 25 26 61.pdf PDF
Addedum III.pdf PDF
ITB FFS 25 26 61.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
APPENDIX I - MAP.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
APPENDIX I - MAP.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
Addendum IV - Final.pdf PDF
ITB FFS 25 26 61.pdf PDF
APPENDIX I - MAP.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
APPENDIX I - MAP.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Addedum - Timeline Revision.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
ITB FFS 25 26 61.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
Addedum III.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page | 1

Appendix II Scope of Work

Withlacoochee Seed Orchard Irrigation Project 2025-2026

The Contractor must complete installation of the following:

190 feet (MOL) six-inch (6”) Schedule 40 PVC (SCH40 PVC) from the well to the 93 acres (MOL).

Main line # 1 – 1300 feet (MOL) of six-inch (6”) SCH40 PVC.

Main Line #2 – 560 feet (MOL) of six-inch (6”) 190 feet (MOL) six-inch (6”) SCH40 PVC from the well to the 93 acres (MOL) SCH40 PVC.

Main Line #3 – 650 feet (MOL) of six-inch (6”) SCH40 PVC with a six-inch (6”) flush out above ground at the southern end.

Feeder Line #1 – 1850 feet (MOL) four-inch (4”) SCH40 PVC main line. This line parallels Soult Road.

There will be a four-inch (4”) SCH40 PVC valve on the western end and another four-inch (4”) SCH40 PVC valve 1,080 feet east down the line, and a four-inch (4”) flush out on the eastern end.

Feeder Line #2 – 430 feet south (MOL) of Line 1. This will be 1850 feet (MOL) four-inch (4”) schedule 40 PVC main line. There will be a four-inch (4”) SCH40 PVC valve on the western end and another four-inch (4”) SCH40 PVC valve 1,080 feet east down the line, and a four-inch (4”) flush out on the eastern end.

Feeder Line #3 – 430 feet south (MOL) of Line 2. This will be 1850 feet (MOL) four-inch (4”) SCH40 PVC main line. There will be a four-inch (4”) SCH40 PVC valve on the western end, another four-inch (4”) SCH40 PVC valve 1,080 feet east down the line, and a four-inch (4”) flush out on the eastern end.

Feeder Line #4 – 430 feet south (MOL) of Line 3. This will be 1300 feet (MOL) four-inch (4”) SCH40 PVC main line. There will be a four-inch (4”) SCH40 PVC valve on the western end where it meets the six-inch (6”) SCH40 PVC, another four-inch (4”) SCH40 PVC valve 650 feet east down the line, and a four-inch (4”) flush out on the eastern end.

Feeder Line #5 – 650 feet south (MOL) of Line 4. This will be 1300 feet (MOL) four-inch (4”) SCH40 PVC main line. There will be a four-inch (4”) SCH40 PVC valve on the western end where it meets the 650 feet of six-inch (6”) SCH40 PVC main line that runs north and south, another four-inch (4”) SCH40 PVC valve 650 feet east down the line, and a four-inch (4”) flush out on the eastern end.

Valves – There will be 10 four-inch (4”) SCH40 PVC valves.

Flush-outs – There will be five (5) four-inch (4”) SCH40 PVC flush-outs and one (1) six-inch (6”) SCH40 PVC flush-out.

Risers – There will be 283 two-inch (2”) SCH40 PVC risers (MOL) installed on the four-inch (4”) SCH40 PVC feeder lines. All two-inch (2”) SCH40 PVC risers installed between valve number 2 and valve number 3 will have 35 foot spacing. All two-inch (2”) SCH40 PVC risers installed on the four-inch (4”) SCH40 PVC feeder lines, between valve numbers 1, 4, 5, 6, 7, 8, 9, and 10 will have 30 foot spacing.

Caps – There will be 179 two-inch (2”) SCH40 PVC caps (MOL) installed on all risers between valve numbers 1, 4, 5, and 6.

Page | 2

Polyline – There will be 94 rolls of 660 feet one-inch (1”) polyline. The one-inch (1”) poly line will be installed on all two-inch (2”) SCH40 PVC risers installed between valve numbers 2, 3, 7, 8, 9, and 10. The one-inch (1”) polyline installed on the two-inch (2”) SCH40 PVC risers between valve numbers 2 and 3 will be 430 (MOL) in length. The one-inch (1”) polyline installed on the two-inch (2”) SCH40 PVC risers between valve numbers 7, 8, 9, and 10 will be 650 feet (MOL) in length. There will be 104 (MOL) one-inch (1”) polyline flush outs installed at the end of each row of one-inch (1”) polyline installed.

Misters, mister stakes, and 36 inches of dripline – There will be 3,920 (MOL) Maxi-jet winged 340° Full Circle Flat Spray 23.5 GPH/ seven-foot (7’) spray diameter misters, mister stakes with 36 inches of dripline installed. These will be installed every 30 feet down the one inch (1”) polyline that is installed off each two-inch (2”) SCH40 PVC riser between valve numbers 2 and valve 3 and every 15 feet between valve numbers 7, 8, 9, and 10.

MISC – This is to include all fittings, glue, cleaners, hose clamps, 90-degree elbows, t-fittings needed for all SCH40 PVC and poly line.

Summary of Materials:

1. Six-inch (6”) SCH40 PVC: 3,000 linear feet

2. Four-inch (4”) SCH40 PVC: 8,500 linear feet

3. Four-inch (4”) SCH40 PVC flush out valve: 5 each

4. Six-inch (6”) SCH40 PVC flush out valve: 1 each

5. Four-inch (4”) SCH40 PVC valves: 10 each

6. One inch (1”) polyline, each roll measuring 660 feet: 94 rolls

7. Two-inch (2”) SCH40 PVC risers: 283 each

8. Two-inch (2”) SCH40 PVC caps: 179 each

9. One-inch (1”) polyline flush-out caps: 104 each

10. Maxi-jet winged 340° Full Circle Flat Spray 23.5 GPH/ seven-foot (7’) spray diameter misters, mister stakes with 36 inches of dripline: 3,920.

11. All other fittings, glue, cleaners, hose clamps, 90-degree elbows, t-fittings needed for all SCH40 PVC and poly line.

The Contractor must complete installation of the following: