APPENDIX I - MAP.pdf

PDF 13 MB Posted

Attached to
Withlacoochee State Forest Seed and Longleaf Orchard Irrigation Installation
Solicitation number
ITB-14789
Issued by
Leon County, Florida

About this file

This is an appendix map document for the Withlacoochee State Forest Seed and Longleaf Orchard Irrigation Installation project, issued by the Florida Department of Agriculture and Consumer Services, Florida Forest Service. The map illustrates the irrigation system infrastructure planned for approximately 128 acres in Brooksville, Florida, depicting the layout of 3,000 linear feet of six-inch Schedule 40 PVC main distribution lines, 8,500 linear feet of four-inch Schedule 40 PVC feeder lines, associated valves, and flush-out stations. The map includes a legend identifying the different PVC pipe sizes and components, with directional orientation and reference to 2025 Airbus satellite imagery as the base mapping layer. The mandatory site visit is scheduled for January 15, 2026, at 10:00 AM, with written questions due by January 22, 2026, at 5:00 PM, and sealed bids due on February 2, 2026, at 5:00 PM. The project requires completion within 120 calendar days of the Notice to Proceed, with 100 days for substantial completion and 20 days for project close-out.

Contractors must be licensed for irrigation system installation under Florida Chapter 489, Part I, and provide detailed unit price and total project pricing. For bids exceeding $100,000, contractors must submit a 5% bid bond, 100% performance bond, and provide a minimum of three references from similar projects completed within the past five years. Liquidated damages are established at $250 per calendar day for delays beyond the completion date. Contractors must maintain comprehensive insurance coverage with the State of Florida listed as an additional insured, provide a one-year written warranty on all parts and labor, and supply all necessary materials including fittings, glue, cleaners, hose clamps, and elbows. The contractor is responsible for integrating the new irrigation system with existing well infrastructure at the site.

View the file

Other files

File Type Posted
APPENDIX II - SCOPE OF WORK.pdf PDF
ITB FFS 25 26 61.pdf PDF
APPENDIX I - MAP.pdf PDF
ITB FFS 25 26 61.pdf PDF
Addedum III.pdf PDF
ITB FFS 25 26 61.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
APPENDIX I - MAP.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
Addendum IV - Final.pdf PDF
ITB FFS 25 26 61.pdf PDF
Addedum - Timeline Revision.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
ITB FFS 25 26 61.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
Addedum III.pdf PDF
APPENDIX I - MAP.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
APPENDIX I - MAP.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Seed Orchard Irrigation Project 2025-2026

Legend

4 inch SCH40 PVC Feeder Line

4-inch SCH40 PVC Valves

6-inch SCH40 PVC Main Line

Flush-outs

1000 ft

N

N Image © 2025 Airbus

Image © 2025 Airbus

Image © 2025 Airbus

File details come from the government source that posted it. Updated .