APPENDIX I - MAP.pdf

PDF 13 MB Posted

Attached to
Withlacoochee State Forest Seed and Longleaf Orchard Irrigation Installation
Solicitation number
ITB-14789
Issued by
Leon County, Florida

About this file

APPENDIX I - MAP.pdf is a visual reference document for the Withlacoochee State Forest Seed and Longleaf Orchard Irrigation Installation project managed by the Florida Department of Agriculture and Consumer Services, Florida Forest Service. The map illustrates the irrigation system layout across the 128-acre project site in Brooksville, Florida, using a legend to identify key infrastructure components including 4-inch Schedule 40 PVC feeder lines, 4-inch Schedule 40 PVC valves, 6-inch Schedule 40 PVC main lines, and flush-out stations. The project requires installation of 3,000 linear feet of six-inch main distribution lines, 8,500 linear feet of four-inch feeder lines, 283 two-inch PVC risers, 10 four-inch valves, six flush-out stations, 94 rolls of one-inch polyline, and 3,920 Maxi-jet misters with integrated dripline. A mandatory site visit is scheduled for January 15, 2026, at 10:00 AM, with written questions due by January 22, 2026, at 5:00 PM, and sealed bids due on February 2, 2026, at 5:00 PM. The project has a strict 120-calendar-day completion schedule following the Notice to Proceed, with 100 days allocated for substantial completion and 20 days for project close-out.

Bidders must provide pricing on a unit price per linear foot basis and a total project price, with bids exceeding $100,000 requiring a 5% bid bond and 100% performance bond. Contractors must possess Florida Chapter 489, Part I irrigation system installation licenses and provide a minimum of three references from similar projects completed within the past five years. The solicitation does not identify set-aside designations for disadvantaged enterprises. Contractors are responsible for supplying all necessary materials including fittings, glue, cleaners, hose clamps, elbows, and t-fittings, and must integrate the new system with existing well infrastructure. Comprehensive insurance coverage is required with the State of Florida listed as an additional insured, and contractors must provide a one-year written warranty on all parts and labor. Liquidated damages are assessed at $250 per calendar day for completion delays beyond the contract deadline.

View the file

Other files

File Type Posted
APPENDIX II - SCOPE OF WORK.pdf PDF
ITB FFS 25 26 61.pdf PDF
ITB FFS 25 26 61.pdf PDF
Addedum III.pdf PDF
ITB FFS 25 26 61.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
APPENDIX I - MAP.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
APPENDIX I - MAP.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
Addendum IV - Final.pdf PDF
ITB FFS 25 26 61.pdf PDF
Addedum - Timeline Revision.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
ITB FFS 25 26 61.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
Addedum III.pdf PDF
APPENDIX I - MAP.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
APPENDIX II - SCOPE OF WORK.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Addedum - Timeline Revision.pdf PDF
Addedum II Final.pdf PDF
APPENDIX I - MAP.pdf PDF
EXHIBIT A - AGREEMENT.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Seed Orchard Irrigation Project 2025-2026

Legend

4 inch SCH40 PVC Feeder Line

4-inch SCH40 PVC Valves

6-inch SCH40 PVC Main Line

Flush-outs

1000 ft

N

N Image © 2025 Airbus

Image © 2025 Airbus

Image © 2025 Airbus

File details come from the government source that posted it. Updated .