Appendix F RCM Feedback Format.docx
DOCX document 14 KB Posted
- Attached to
- Solicitation for Sustainment Modernization Services Federal contract opportunity
- Solicitation number
- W911QX23R0004
About this file
This document contains a federal contract solicitation for sustainment modernization services and an appendix providing a feedback format for a vehicle diagnostic and repair program.
The solicitation seeks proposals for sustainment modernization services in support of the Department of the Army Materiel Command Army Contracting Command located at Aberdeen Proving Ground. Offerors are asked to review the attached solicitation document for additional details on required services, response date, and contract terms. The appendix outlines the format contractors should use to provide feedback on vehicle diagnostic test results, including vehicle information, event details, diagnostic tools used, repair parts, and summaries of analysis and diagnostic results. Pictures of failed components may also be included where applicable.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Feedback for DTC and NSN watch List:
· Associated project Code
· Date of test or analysis
· Location of analysis
· Total time of analysis
· Vehicle information
· VIN
· Vehicle Number
· Model
· Power train models (Engine, Trans, ABS)
· Event Information
· Event Type (DTC, NMC, Site)
· Unit Diagnostic days
· Vehicle NMC days
· Complaint (Issue)
· Component (Fault component found to cause the issue)
· Cause (Component failure reason)
· Applicable DTC(s) and occurrences
· Diagnostic Aides Required (from list of diagnostic tools used to perform analysis)
· Special project information
· Repair parts information
· Event Type (savings or failure)
· Request type (suggested, current, previous, TM directed)
· Qty
· Price
· Total price
· NSN
· Description
· Summary of analysis action
· Diagnostics results, downloads, and reports (e.g. OEM or Noregon JPRO reports)
· Pictures of failed components or issues seen (where applicable)
· Tech digital signature
File details come from the government source that posted it. Updated .