This document includes a federal solicitation for the replacement of the building automation system at the Northern California TRACON facility located in Mather, California. The Federal Aviation Administration is seeking proposals to design and construct a new BACnet-compliant BAS, with site visits scheduled for April 13-14, 2021. Questions are due by April 23, 2021 and proposals are due by May 5, 2021. Offerors must be registered in the System for Award Management and submit a proposal in accordance with the solicitation instructions. The solicitation describes the requirement, proposal instructions, and timelines for questions and responses.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX F: ORM Concepts
Any activities that may have the potential to affect FAA system shall go through Project Risk Management (PRM) and Operational Risk Management (ORM) meetings and reviews. These activities shall include work plans and briefing meeting with FAA stakeholders. PRM/ORM principles and concepts shall be considered and the design shall reflect those considerations.
Project Risk Management and Operational Risk Management Principles:
The construction phasing, drawings and specifications shall insure safe and uninterrupted operation of the TRACON. The design package shall include ingress and egress points to the site, the building and work areas, temporary power, communications, definition of storage and staging areas, dumpster placement locations, and construction offices and parking areas. The timing and any restrictions for demolition work and construction work shall be shown and identified.
• Construction schedules and temporary facilities drawings and specifications shall be included within the Construction Drawings and Specifications. The format of this information must be per the designer’s professional judgment for best clarity and coordination. The contractor will prepare construction phasing and temporary facilities drawings and specifications