Past Performance Questionnaire.pdf

PDF 139 KB Posted

Attached to
Northern California (NCT) TRACON Building Automation System Replacement
Solicitation number
697DCK-21-R-00041
Issued by

About this file

This document includes a past performance questionnaire template and a solicitation for replacement of a building automation system. The past performance questionnaire is a template for evaluating contractors' prior work and includes sections for the contractor to provide contract details and for the evaluator to assess quality, performance, technical requirements, schedule, cost control, customer satisfaction, and overall assessment.

The solicitation seeks design and construction of a new BACnet building automation system for the Northern California TRACON facility. Interested vendors must request a site visit by April 6th to attend on April 13th or 14th. All questions are due by April 23rd and proposals must be received by May 5th at 5:00 PM Pacific Time. Proposals must meet the requirements of Sections L and M. Offerors must be registered in the System for Award Management to be eligible for award. The federal agency is the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
APPENDIX K SECTION 10270 - ACCESS FLOORING.pdf PDF
APPENDIX L Ops Room VAVs Pictures.pdf PDF
697DCK-21-R-00041 Amendment 0005.pdf PDF
APPENDIX J Sequences of Operation.pdf PDF
APPENDIX B - AS BUILT CONTROL DRAWINGS_Revised.pdf PDF
Site Visit Attendee Log.pdf PDF
697DCK-21-R-00041_Amendment 0004.pdf PDF
ADDPENDIX J Sequences of Operation.pdf PDF
697DCK-21-R-00041 Amendment 0004.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
APPENDIX I SECTION 01 31 00 S Proj Mgmt and Coord for Sustainable Design.pdf PDF
697DCK-21-R-00041_Amendment 0004.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
SIR 697DCK-21-R-00041 Amendment 0003.pdf PDF
APPENDIX H NCT Mechanical Plans.pdf PDF
Questions and Responses April 27 2021.pdf PDF
SIR 697DCK-21-R-00041 Amendment 0002.pdf PDF
SF330.pdf PDF
SIR 697DCK-21-R-00041_Amendment 0001.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
Corporate Experience Form.pdf PDF
APPENDIX B - AS BUILT CONTROL DRAWINGS.pdf PDF
APPENDIX G - 01 74 19 construction waste management and disposal.pdf PDF
APPENDIX E - 23 09 23 Instrumentation and Controls.pdf PDF
APPENDIX D - COVID-19 Contractual Requirement (1).pdf PDF
Attachment J-1 Scope of Work.pdf PDF
APPENDIX F - ORM Concepts.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
APPENDIX C - AS BUILT COOLING TOWERS.pdf PDF
Attachment J-2 Wage Determiantion CA20200007.pdf PDF
APPENDIX A - AS BUILT MECHANICAL DRAWINGS SCHEDULE.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE QUESTIONNAIRE

Your assistance is requested in support of a source selection Please complete this Questionnaire and email Contracting Officer at:

Katherine.fogle@faa.gov

TO BE COMPLETED BY OFFEROR

1. CONTRACTOR NAME & ADDRESS: 2. CONTRACT NO:

3. CONTRACT INITIATION DATE:

4. COMPLETION DATE:

5. TOTAL CONTRACT VALUE:

6. TYPE OF CONTRACT: (Fixed Price, GMP, FPI, etc.)

7. DESCRIPTION OF CONTRACT REQUIREMENTS:

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE

8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.

EX = Exceptional S = Satisfactory US = Unsatisfactory VG = Very Good MG = Marginal N/O = Not Observed

A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

EX VG S MG US N/O

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

EX VG S MG US N/O

C. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

EX VG S MG US

N/O

D. Schedule – Assess the timeliness of contractor against the schedule of activities.

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness” mailto:Katherine.fogle@faa.gov

G. Overall Assessment.

EX VG S MG US N/O

Comments:

Signature:_______________________________________ Date: ________________

File details come from the government source that posted it. Updated .