Corporate Experience Form.pdf

PDF 125 KB Posted

Attached to
Northern California (NCT) TRACON Building Automation System Replacement
Solicitation number
697DCK-21-R-00041
Issued by

About this file

This solicitation requests proposals for a new Building Automation System for the Northern California TRACON facility located in Mather, California. Offerors must submit proposals by May 5, 2021 to the contracting officer at the Federal Aviation Administration Southwestern Region. The selected contractor will design and construct a new BACnet BAS to replace the existing system. Site visits are scheduled for April 13-14, 2021 with a maximum of four attendees per offeror. All questions must be submitted by April 23, 2021. To be eligible for award, offerors must have a current SAM registration and submit a proposal in accordance with the solicitation instructions.

View the file

Other files

File Type Posted
APPENDIX K SECTION 10270 - ACCESS FLOORING.pdf PDF
APPENDIX L Ops Room VAVs Pictures.pdf PDF
697DCK-21-R-00041 Amendment 0005.pdf PDF
APPENDIX J Sequences of Operation.pdf PDF
APPENDIX B - AS BUILT CONTROL DRAWINGS_Revised.pdf PDF
Site Visit Attendee Log.pdf PDF
697DCK-21-R-00041_Amendment 0004.pdf PDF
ADDPENDIX J Sequences of Operation.pdf PDF
697DCK-21-R-00041 Amendment 0004.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
APPENDIX I SECTION 01 31 00 S Proj Mgmt and Coord for Sustainable Design.pdf PDF
697DCK-21-R-00041_Amendment 0004.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
SIR 697DCK-21-R-00041 Amendment 0003.pdf PDF
APPENDIX H NCT Mechanical Plans.pdf PDF
Questions and Responses April 27 2021.pdf PDF
SIR 697DCK-21-R-00041 Amendment 0002.pdf PDF
SF330.pdf PDF
SIR 697DCK-21-R-00041_Amendment 0001.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
Past Performance Questionnaire.pdf PDF
APPENDIX B - AS BUILT CONTROL DRAWINGS.pdf PDF
APPENDIX G - 01 74 19 construction waste management and disposal.pdf PDF
APPENDIX E - 23 09 23 Instrumentation and Controls.pdf PDF
APPENDIX D - COVID-19 Contractual Requirement (1).pdf PDF
Attachment J-1 Scope of Work.pdf PDF
APPENDIX F - ORM Concepts.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
APPENDIX C - AS BUILT COOLING TOWERS.pdf PDF
Attachment J-2 Wage Determiantion CA20200007.pdf PDF
APPENDIX A - AS BUILT MECHANICAL DRAWINGS SCHEDULE.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORPORATE EXPERIENCE FORM

Names and references must be current and verifiable. (Copy for additional sheets)

Project Name:

Location:

Reference - Owner (Contact Person) Name and Current Telephone Number:

Description of Project, Scope of Work Performed:

Type of Project Delivery (Design-Build; Design-Bid-Build; CM@R, etc.):

Final Project Cost (include non-owner requested change-orders):

Value of Original Contract:

Summarize reason(s) for difference in Original vs. Total cost:

Key Team Members (company and/or individual) critical to project success and is also proposed for this FAA Project:

• Name:___________________;

• Title: ___________________________________________

• Name: __________________;

• Name: __________________;

File details come from the government source that posted it. Updated .