This document contains questions and responses pertaining to a solicitation for the Northern California TRACON Building Automation System Replacement. The Federal Aviation Administration is seeking proposals to design and construct a new BACnet Building Automation System for their facility located in Mather, California. Offerors must attend a mandatory site visit on either April 13th or 14th, with all questions due by April 23rd and proposals due by May 5th. Existing actuators, valves, and variable frequency drives can be reused provided they are compatible with the new control devices. Proposers must be registered in the System for Award Management database and must meet the requirements outlined in Sections L and M of the solicitation.

View the file

Other files

File Type Posted
APPENDIX K SECTION 10270 - ACCESS FLOORING.pdf PDF
APPENDIX L Ops Room VAVs Pictures.pdf PDF
697DCK-21-R-00041 Amendment 0005.pdf PDF
APPENDIX J Sequences of Operation.pdf PDF
APPENDIX B - AS BUILT CONTROL DRAWINGS_Revised.pdf PDF
Site Visit Attendee Log.pdf PDF
697DCK-21-R-00041_Amendment 0004.pdf PDF
ADDPENDIX J Sequences of Operation.pdf PDF
697DCK-21-R-00041 Amendment 0004.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
APPENDIX I SECTION 01 31 00 S Proj Mgmt and Coord for Sustainable Design.pdf PDF
697DCK-21-R-00041_Amendment 0004.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
SIR 697DCK-21-R-00041 Amendment 0003.pdf PDF
APPENDIX H NCT Mechanical Plans.pdf PDF
SIR 697DCK-21-R-00041 Amendment 0002.pdf PDF
SF330.pdf PDF
SIR 697DCK-21-R-00041_Amendment 0001.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
Corporate Experience Form.pdf PDF
Past Performance Questionnaire.pdf PDF
APPENDIX B - AS BUILT CONTROL DRAWINGS.pdf PDF
APPENDIX G - 01 74 19 construction waste management and disposal.pdf PDF
APPENDIX E - 23 09 23 Instrumentation and Controls.pdf PDF
APPENDIX D - COVID-19 Contractual Requirement (1).pdf PDF
Attachment J-1 Scope of Work.pdf PDF
APPENDIX F - ORM Concepts.pdf PDF
SIR 697DCK-21-R-00041.pdf PDF
APPENDIX C - AS BUILT COOLING TOWERS.pdf PDF
Attachment J-2 Wage Determiantion CA20200007.pdf PDF
APPENDIX A - AS BUILT MECHANICAL DRAWINGS SCHEDULE.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Responses_ April 27, 2021

1. Question: Can the existing damper actuators, valve actuators, and control valves reused?

Response: Existing actuators and valves may be reused as they are compatible with new control devices.

2. Question: Can the existing VFDs be reused?

Response: VFDs must be reused.