APPENDIX I SECTION 01 31 00 S Proj Mgmt and Coord for Sustainable Design.pdf
PDF 101 KB Posted
- Solicitation number
- 697DCK-21-R-00041
About this file
This solicitation requests proposals for a new BACnet Building Automation System for the Northern California TRACON located in Mather, CA. Interested vendors must visit the site on April 13th or 14th and submit any questions to the Contracting Officer by April 23rd. Proposals are due by May 5th at 5:00 PM Pacific Time and must be emailed to the Contracting Officer. The selected vendor will be responsible for designing and constructing the new BAS to replace the existing system. The Federal Aviation Administration will evaluate proposals and make an award. Vendors must have an active SAM registration to be eligible for award.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION May 19, 2021
NCT BAS REPLACEMENT
PROJECT MANAGEMENT AND COORDINATION FOR 01 31 00 S - 1
SUSTAINABLE DESIGN
SECTION 01 31 00 S - PROJECT MANAGEMENT AND COORDINATION FOR SUSTAINABLE
DESIGN
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. General project coordination procedures.
2. Administrative and supervisory personnel.
3. Coordination drawings.
4. Requests for Information (RFIs).
5. Project meetings.
B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.
1.2 DEFINITIONS
A. RFI: Request from Owner, Architect, or Contractor seeking information from each other during construction.
1.3 PROJECT MANAGEMENT AND COORDINATION – ENVIRONMENTAL
A. Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection.
1. Responsibilities shall include:
a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.
b. Implementation of the Waste Management Plan.
B. Perform project quality control in accordance with requirements specified in Related Sections, including:
1. 01 74 19 – Construction Waste Management
1.4 COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation.
PROJECT MANAGEMENT AND COORDINATION FOR 01 31 00 S - 2
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. Coordination: Each contractor shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work.
Each contractor shall coordinate its operations with operations, included in different Sections, that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other contractors to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's construction schedule.
2. Preparation of the schedule of values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
9. Project closeout activities.
D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.
1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. Refer to other Sections for disposition of salvaged materials that are designated as Owner's property.
1.5 COORDINATION DRAWINGS
A. Coordination Drawings, General: Prepare coordination drawings in accordance with requirements in individual Sections, where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.
PROJECT MANAGEMENT AND COORDINATION FOR 01 31 00 S - 3
1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:
a. Use applicable Drawings as a basis for preparation of coordination drawings.
Prepare sections, elevations, and details as needed to describe relationship of various systems and components.
b. Coordinate the addition of trade-specific information to the coordination drawings by multiple contractors in a sequence that best provides for coordination of the information and resolution of conflicts between installed components before submitting for review.
c. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
d. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.
e. Show location and size of access doors required for access to concealed dampers, valves, and other controls.
f. Indicate required installation sequences.
g. Indicate dimensions shown on the Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Architect indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.
1.6 KEY PERSONNEL
A. Key Personnel Names: Prior to starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home, office, and cellular telephone numbers and email addresses. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project. Superintendent and Key Personnel that will be onsite everyday must get an FAA contractor badge. Badging process must be completed prior to start of construction.
1. Post copies of list in project meeting room and temporary field office. Keep list current at all times.
1.7 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
1. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. Project name.
2. Project number.
PROJECT MANAGEMENT AND COORDINATION FOR 01 31 00 S - 4
3. Date.
4. Name of Contractor.
5. Name of designer or construction manager
6. RFI number, numbered sequentially.
7. RFI subject.
8. Specification Section number and title and related paragraphs, as appropriate.
9. Drawing number and detail references, as appropriate.
10. Field dimensions and conditions, as appropriate.
11. Contractor's suggested resolution. If Contractor's solution(s) impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
12. Contractor's signature.
13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. General: Construction Manager will schedule and conduct meetings and conferences at Project site, unless otherwise indicated.
1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Entity responsible for conducting meeting will record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner, Construction Manager, and designer, within 3 days of the meeting.
D. Preconstruction Conference: FAA will schedule a preconstruction conference before starting construction.
1. Conduct the conference to review responsibilities and personnel assignments.
2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Tentative construction schedule.
b. Phasing.
c. Critical work sequencing and long-lead items.
d. Designation of key personnel and their duties.
e. Lines of communications.
f. Procedures for processing field decisions and Change Orders.
g. Procedures for RFIs.
h. Procedures for testing and inspecting.
i. Procedures for processing Applications for Payment.
j. Distribution of the Contract Documents.
k. Submittal procedures.
l. Sustainable design requirements.
m. Preparation of record documents.
n. Use of the premises and existing building.
PROJECT MANAGEMENT AND COORDINATION FOR 01 31 00 S - 5
o. Work restrictions.
p. Working hours.
q. Owner's occupancy requirements.
r. Responsibility for temporary facilities and controls.
s. Procedures for moisture and mold control.
t. Procedures for disruptions and shutdowns.
u. Construction waste management and recycling.
v. Parking availability.
w. Office, work, and storage areas.
x. Equipment deliveries and priorities.
y. First aid.
z. Security.
aa. Progress cleaning.
3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 31 00 S
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 1
SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes requirements for temporary utilities, support facilities, and security and protection facilities.
1.2 DEFINITIONS
A. Permanent Enclosure: As determined by COTR, permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight; and all openings are closed with permanent construction or substantial temporary closures.
1.3 USE CHARGES
A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum.
Allow other entities to use temporary services and facilities without cost, including, but not limited to testing agencies, and authorities having jurisdiction.
B. Sewer Service: Pay sewer service use charges for sewer usage by all entities for construction operations.
C. Water Service: Pay water service use charges for water used by all entities for construction operations.
D. Electric Power Service: Pay electric power service use charges for electricity used by all entities for construction operations.
E. Water Service: Water from FAA's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
F. Electric Power Service: Electric power from FAA's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
1.4 SUBMITTALS
A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction personnel.
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 2
1.5 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.
B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.
1.6 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before FAA's acceptance, regardless of previously assigned responsibilities.
PART 2 - PRODUCTS
2.1 TEMPORARY FACILITIES
A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.
B. Common-Use Field Office: Of sufficient size to accommodate needs of construction personnel.
Keep office clean and orderly. Furnish and equip offices as follows:
1. Furniture required for Project-site documents including file cabinets, plan tables, plan racks, and bookcases.
2. Conference room of sufficient size to accommodate meetings of 10 individuals. Provide electrical power service and 120-V ac duplex receptacles, with not less than 1 receptacle on each wall. Furnish room with conference table, chairs, and 4-foot- square tack board.
3. Drinking water and private toilet.
4. Coffee machine and supplies.
5. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 to 72 deg F.
6. Lighting fixtures capable of maintaining average illumination of 20 fc at desk height.
C. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for construction operations.
1. Store combustible materials apart from building.
2.2 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 3
B. HVAC Equipment: Unless FAA authorizes use of permanent HVAC system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.
1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited.
2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
3. Permanent HVAC System: If FAA authorizes use of permanent HVAC system for temporary use during construction, provide filter with MERV of 8 at each return air grille in system and remove at end of construction.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.
1. Locate facilities to limit site disturbance as specified in Section 01 10 00 "Summary of Work."
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.
3.2 TEMPORARY UTILITY INSTALLATION
A. General: Install temporary service or connect to existing service.
1. Arrange with utility company, FAA, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.
B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.
C. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction.
D. Water Service: Use of FAA's existing water service facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to FAA. At Substantial Completion, restore these facilities to condition existing before initial use.
1. Where installations below an outlet might be damaged by spillage or leakage, provide a drip pan of suitable size to minimize water damage. Drain accumulated water promptly from pans.
E. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 4
F. Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed.
G. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption.
H. Electric Power Service: Use of FAA's existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to FAA.
I. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations.
1. Install electric power service overhead, unless otherwise indicated.
2. Connect temporary service to FAA's existing power source, as directed by FAA.
J. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.
1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system.
2. Install lighting for Project identification sign.
3.3 SUPPORT FACILITIES INSTALLATION
A. General: Comply with the following:
1. Provide incombustible construction for offices, shops, and sheds located within construction area or within 30 feet of building lines. Comply with NFPA 241.
2. Maintain support facilities until near Substantial Completion. Remove before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to FAA.
B. Traffic Controls: Comply with requirements of authorities having jurisdiction.
1. Protect existing site improvements to remain including curbs, pavement, and utilities.
2. Maintain access for fire-fighting equipment and access to fire hydrants.
C. Parking: Use designated areas of FAA's existing parking areas for construction personnel.
D. Project Identification and Temporary Signs: Provide Project identification and other signs.
Install signs where indicated to inform public and individuals seeking entrance to Project.
Unauthorized signs are not permitted.
1. Provide temporary, directional signs for construction personnel and visitors.
2. Maintain and touchup signs so they are legible at all times.
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 5
E. Waste Disposal Facilities: Comply with requirements.
F. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction.
G. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.
1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.
H. Existing Elevator Use: Use of FAA's existing elevators may be permitted, as long as elevators are cleaned and maintained in a condition acceptable to FAA. At Substantial Completion, restore elevators to condition existing before initial use, including replacing worn cables, guide shoes, and similar items of limited life.
1. Do not load elevators beyond their rated weight capacity.
2. Provide protective coverings, barriers, devices, signs, or other procedures to protect elevator car and entrance doors and frame. If, despite such protection, elevators become damaged, engage elevator Installer to restore damaged work so no evidence remains of correction work. Return items that cannot be refinished in field to the shop, make required repairs and refinish entire unit, or provide new units as required.
I. Existing Stair Usage: Use of FAA's existing stairs will be permitted, as long as stairs are cleaned and maintained in a condition acceptable to FAA. At Substantial Completion, restore stairs to condition existing before initial use.
1. Provide protective coverings, barriers, devices, signs, or other procedures to protect stairs and to maintain means of egress. If, despite such protection, stairs become damaged, restore damaged areas so no evidence remains of correction work.
J. Temporary Use of Permanent Stairs: Cover finished, permanent stairs with protective covering of plywood or similar material so finishes will be undamaged at time of acceptance.
3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
1. Comply with work restrictions specified in Section 01 10 00 "Summary of Work."
B. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.
C. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure.
TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 6
1. Where heating or cooling is needed and permanent enclosure is not complete, insulate temporary enclosures.
D. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with
NFPA 241.
1. Prohibit smoking in facility and within 10 feet of building areas.
2. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition according to requirements of authorities having jurisdiction.
3. Develop and supervise an overall fire-prevention and -protection program for personnel at Project site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information.
4. Provide temporary standpipes and hoses for fire protection. Hang hoses with a warning sign stating that hoses are for fire-protection purposes only and are not to be removed.
Match hose size with outlet size and equip with suitable nozzles.
3.5 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.
B. Maintenance: Maintain facilities in good operating condition until removal.
1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage.
C. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.
1. Materials and facilities that constitute temporary facilities are property of Contractor.
FAA reserves right to take possession of Project identification signs.
2. Remove temporary paving not intended for or acceptable for integration into permanent paving. Where area is intended for landscape development, remove soil and aggregate fill that do not comply with requirements for fill or subsoil. Remove materials contaminated with road oil, asphalt and other petrochemical compounds, and other substances that might impair growth of plant materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary entrances, as required by authorities having jurisdiction.
3. At Substantial Completion, clean and renovate permanent facilities used during construction period. Comply with final cleaning requirements specified in Section 01 77 00 "Closeout Procedures."
END OF SECTION 01 50 00
FEDERAL AVIATION ADMINISTRATION MAY 19, 2021
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL FOR
01 74 19 S - 1
SECTION 01 74 19 S - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL FOR
SUSTAINABLE DESIGN
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Salvaging nonhazardous construction waste.
2. Recycling nonhazardous construction waste.
3. Disposing of nonhazardous construction waste.
1.2 DEFINITIONS
A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.
C. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.
D. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.
E. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.
1.3 PERFORMANCE REQUIREMENTS
A. General: Achieve end-of-Project rates for salvage/recycling of 50 percent by weight of total non-hazardous solid waste generated by the Work. Practice efficient waste management in the use of materials in the course of the Work. Use all reasonable means to divert construction and demolition waste from landfills and incinerators. Facilitate recycling and salvage of materials.
1.4 ACTION SUBMITTALS
A. Waste Management Plan: Submit plan within 7 days of date established for Notice to proceed
01 74 19 S - 2
1.5 INFORMATIONAL SUBMITTALS
A. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt.
B. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.
C. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
D. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
1.6 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Waste Management Conference: Conduct conference at Project site to comply with requirements in Division 01 Section "Project Management and Coordination." Review methods and procedures related to waste management including, but not limited to, the following:
1. Review and discuss waste management plan including responsibilities of waste management coordinator.
2. Review requirements for documenting quantities of each type of waste and its disposition.
3. Review and finalize procedures for materials separation and verify availability of containers and bins needed to avoid delays.
4. Review procedures for periodic waste collection and transportation to recycling and disposal facilities.
5. Review waste management requirements for each trade.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 PLAN IMPLEMENTATION
A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
1. Comply with Division 01 Section "Temporary Facilities and Controls" for operation, termination, and removal requirements.
01 74 19 S - 3
B. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold.
2. Comply with Division 01 Section "Temporary Facilities and Controls" for controlling dust and dirt, environmental protection, and noise control.
3.2 SALVAGING DEMOLITION WASTE
A. Salvaged Items for sale and donation: Permitted on Project site.
B. Salvaged Items for Owner's Use: Salvage items for Owner's use and handle as follows:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner
5. Protect items from damage during transport and storage.
3.3 RECYCLING CONSTRUCTION WASTE, GENERAL
A. General: Recycle paper and beverage containers used by on-site workers.
B. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall accrue to contractor.
C. Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process.
D. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan.
1. Provide appropriately marked containers or bins for controlling recyclable waste until they are removed from Project site. Include list of acceptable and unacceptable materials at each container and bin.
a. Inspect containers and bins for contamination and remove contaminated materials if found.
2. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
3. Stockpile materials away from construction area. Do not store within drip line of remaining trees.
4. Store components off the ground and protect from the weather.
01 74 19 S - 4
5. Remove recyclable waste off Owner's property and transport to recycling receiver or processor.
3.4 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
1. Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn waste materials.
C. Disposal: Transport waste materials off Owner's property and legally dispose of them.
| 01 31 00S_Proj Mgm and Coord |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: |
| 1. General project coordination procedures. |
| 2. Administrative and supervisory personnel. |
| 3. Coordination drawings. |
| 4. Requests for Information (RFIs). |
| 5. Project meetings. |
B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.
| 1.2 DEFINITIONS |
| A. RFI: Request from Owner, Architect, or Contractor seeking information from each other during construction. |
| 1.3 PROJECT MANAGEMENT AND COORDINATION – ENVIRONMENTAL |
| A. Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection. |
| 1. Responsibilities shall include: |
| a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation. |
| b. Implementation of the Waste Management Plan. |
| B. Perform project quality control in accordance with requirements specified in Related Sections, including: |
| 1. 01 74 19 – Construction Waste Management |
| 1.4 COORDINATION |
| A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that ... |
| 1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation. |
| 2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair. |
| 3. Make adequate provisions to accommodate items scheduled for later installation. |
| B. Coordination: Each contractor shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work. Each contractor shall coordinate its operations with op... |
| 1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation. |
| 2. Coordinate installation of different components with other contractors to ensure maximum performance and accessibility for required maintenance, service, and repair. |
| 3. Make adequate provisions to accommodate items scheduled for later installation. |
| C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are no... |
| 1. Preparation of Contractor's construction schedule. |
| 2. Preparation of the schedule of values. |
| 3. Installation and removal of temporary facilities and controls. |
| 4. Delivery and processing of submittals. |
| 5. Progress meetings. |
| 6. Preinstallation conferences. |
| 7. Project closeout activities. |
| 8. Startup and adjustment of systems. |
| 9. Project closeout activities. |
| D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste. |
| 1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. Refer to other Sections for disposition of salvaged materials that are designated as Owner's property. |
| 1.5 COORDINATION DRAWINGS |
| A. Coordination Drawings, General: Prepare coordination drawings in accordance with requirements in individual Sections, where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if co... |
| 1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable: |
| a. Use applicable Drawings as a basis for preparation of coordination drawings. Prepare sections, elevations, and details as needed to describe relationship of various systems and components. |
| b. Coordinate the addition of trade-specific information to the coordination drawings by multiple contractors in a sequence that best provides for coordination of the information and resolution of conflicts between installed components before submitti... |
| c. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems. |
| d. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation. |
| e. Show location and size of access doors required for access to concealed dampers, valves, and other controls. |
| f. Indicate required installation sequences. |
| g. Indicate dimensions shown on the Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Architect indicating proposed resolution of such conf... |
| 1.6 KEY PERSONNEL |
| A. Key Personnel Names: Prior to starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; li... |
| 1. Post copies of list in project meeting room and temporary field office. Keep list current at all times. |
| 1.7 REQUESTS FOR INFORMATION (RFIs) |
| A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified. |
| 1. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors. |
| B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following: |
| 1. Project name. |
| 2. Project number. |
| 3. Date. |
| 4. Name of Contractor. |
| 5. Name of designer or construction manager |
| 6. RFI number, numbered sequentially. |
| 7. RFI subject. |
| 8. Specification Section number and title and related paragraphs, as appropriate. |
| 9. Drawing number and detail references, as appropriate. |
| 10. Field dimensions and conditions, as appropriate. |
| 11. Contractor's suggested resolution. If Contractor's solution(s) impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI. |
| 12. Contractor's signature. |
| 13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation. |
| a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches. |
| C. General: Construction Manager will schedule and conduct meetings and conferences at Project site, unless otherwise indicated. |
| 1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times. |
| 2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees. |
| 3. Minutes: Entity responsible for conducting meeting will record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner, Construction Manager, and designer, within 3 days of the meeting. |
| D. Preconstruction Conference: FAA will schedule a preconstruction conference before starting construction. |
| 1. Conduct the conference to review responsibilities and personnel assignments. |
| 2. Agenda: Discuss items of significance that could affect progress, including the following: |
| a. Tentative construction schedule. |
| b. Phasing. |
| c. Critical work sequencing and long-lead items. |
| d. Designation of key personnel and their duties. |
| e. Lines of communications. |
| f. Procedures for processing field decisions and Change Orders. |
| g. Procedures for RFIs. |
| h. Procedures for testing and inspecting. |
| i. Procedures for processing Applications for Payment. |
| j. Distribution of the Contract Documents. |
| k. Submittal procedures. |
| l. Sustainable design requirements. |
| m. Preparation of record documents. |
| n. Use of the premises and existing building. |
| o. Work restrictions. |
| p. Working hours. |
| q. Owner's occupancy requirements. |
| r. Responsibility for temporary facilities and controls. |
| s. Procedures for moisture and mold control. |
| t. Procedures for disruptions and shutdowns. |
| u. Construction waste management and recycling. |
| v. Parking availability. |
| w. Office, work, and storage areas. |
| x. Equipment deliveries and priorities. |
| y. First aid. |
| z. Security. |
| aa. Progress cleaning. |
3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION (Not Used) |
| 01 50 00_Temporary Facilities |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. This Section includes requirements for temporary utilities, support facilities, and security and protection facilities. |
| 1.2 DEFINITIONS |
| A. Permanent Enclosure: As determined by COTR, permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight; and all openings are closed with permanent construction or substantial temporary cl... |
| 1.3 USE CHARGES |
| A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum. Allow other entities to use temporary services and facilities without cost, including, but not limited to testing agencies, and authorities having jurisd... |
| B. Sewer Service: Pay sewer service use charges for sewer usage by all entities for construction operations. |
| C. Water Service: Pay water service use charges for water used by all entities for construction operations. |
| D. Electric Power Service: Pay electric power service use charges for electricity used by all entities for construction operations. |
| E. Water Service: Water from FAA's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations. |
| F. Electric Power Service: Electric power from FAA's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations. |
| 1.4 SUBMITTALS |
| A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction personnel. |
| 1.5 QUALITY ASSURANCE |
| A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70. |
| B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits. |
| 1.6 PROJECT CONDITIONS |
| A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before FAA's acceptance, regardle... |
| PART 2 - PRODUCTS |
| 2.1 TEMPORARY FACILITIES |
| A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading. |
| B. Common-Use Field Office: Of sufficient size to accommodate needs of construction personnel. Keep office clean and orderly. Furnish and equip offices as follows: |
| 1. Furniture required for Project-site documents including file cabinets, plan tables, plan racks, and bookcases. |
| 2. Conference room of sufficient size to accommodate meetings of 10 individuals. Provide electrical power service and 120-V ac duplex receptacles, with not less than 1 receptacle on each wall. Furnish room with conference table, chairs, and 4-foot- ... |
| 3. Drinking water and private toilet. |
| 4. Coffee machine and supplies. |
| 5. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 to 72 deg F. |
| 6. Lighting fixtures capable of maintaining average illumination of 20 fc at desk height. |
| C. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for construction operations. |
| 1. Store combustible materials apart from building. |
| 2.2 EQUIPMENT |
| A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures. |
| B. HVAC Equipment: Unless FAA authorizes use of permanent HVAC system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control. |
| 1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited. |
| 2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. |
| 3. Permanent HVAC System: If FAA authorizes use of permanent HVAC system for temporary use during construction, provide filter with MERV of 8 at each return air grille in system and remove at end of construction. |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION, GENERAL |
| A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work. |
| 1. Locate facilities to limit site disturbance as specified in Section 01 10 00 "Summary of Work." |
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.
| 3.2 TEMPORARY UTILITY INSTALLATION |
| A. General: Install temporary service or connect to existing service. |
| 1. Arrange with utility company, FAA, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services. |
| B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully. |
| C. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction. |
| D. Water Service: Use of FAA's existing water service facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to FAA. At Substantial Completion, restore these facilities to condition existing before i... |
| 1. Where installations below an outlet might be damaged by spillage or leakage, provide a drip pan of suitable size to minimize water damage. Drain accumulated water promptly from pans. |
| E. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities. |
| F. Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Sel... |
| G. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment t... |
| H. Electric Power Service: Use of FAA's existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to FAA. |
| I. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations. |
| 1. Install electric power service overhead, unless otherwise indicated. |
| 2. Connect temporary service to FAA's existing power source, as directed by FAA. |
| J. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions. |
| 1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system. |
| 2. Install lighting for Project identification sign. |
| 3.3 SUPPORT FACILITIES INSTALLATION |
| A. General: Comply with the following: |
| 1. Provide incombustible construction for offices, shops, and sheds located within construction area or within 30 feet of building lines. Comply with NFPA 241. |
| 2. Maintain support facilities until near Substantial Completion. Remove before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to FAA. |
| B. Traffic Controls: Comply with requirements of authorities having jurisdiction. |
| 1. Protect existing site improvements to remain including curbs, pavement, and utilities. |
| 2. Maintain access for fire-fighting equipment and access to fire hydrants. |
| C. Parking: Use designated areas of FAA's existing parking areas for construction personnel. |
| D. Project Identification and Temporary Signs: Provide Project identification and other signs. Install signs where indicated to inform public and individuals seeking entrance to Project. Unauthorized signs are not permitted. |
| 1. Provide temporary, directional signs for construction personnel and visitors. |
| 2. Maintain and touchup signs so they are legible at all times. |
| E. Waste Disposal Facilities: Comply with requirements. |
| F. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. |
| G. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel. |
| 1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities. |