Appendix C_AF DRAWING BRM1B5-01.pdf

PDF 251 KB Posted

Attached to
Amended _721 APS Baggage Conveyor System
Solicitation number
FA561326Q0029
Issued by

About this file

This is an architectural floor plan for a baggage handling and conveyor system installation at a passenger terminal facility. The plan depicts both indoor and outdoor baggage build-up areas connected by an integrated conveyor system with multiple components including scale conveyors, transfer conveyors, takeaway conveyors, and overhead doors. The design includes a check-in area equipped with an operator control panel (OCP), motor control panel (MCP), and emergency stop (ES) features positioned throughout the layout. The system incorporates turning posts at typical intervals, side guards, and bare grating sections for maintenance access. An existing flip-up counter and check-in counter are identified for removal and relocation. The plan specifies new MCP location installation alongside existing equipment removal notation. The layout demonstrates a comprehensive automated baggage handling infrastructure serving both arrivals and departures, with physical dimensions and clearance measurements marked in green throughout the drawing. The schematic indicates this is Sheet 5 of 8 and references Building 3333 as the project location, with the system designed to facilitate passenger terminal conveyor operations.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .