Appendix B1-Unit Pricing (SBP-6.133) AVCF Gas line.pdf

PDF 179 KB Posted

Attached to
Natural Gas Line Relocation, Arkansas Valley Correctional Facility (AVCF)
Solicitation number
EMP25-009
Issued by
Custer County, Colorado

About this file

This is a State Form SBP-6.133 Unit Pricing Form issued by the Colorado Office of the State Architect for the Colorado Department of Corrections / Facility Management Services, specifically for Project No. EMP25-009 - Natural Gas Line Relocation at the Arkansas Valley Correctional Facility. The form is designed to establish unit pricing for potential contract adjustments when changes in work are necessary, with unit prices applicable until the contract completion date specified in the Notice to Proceed.

The document provides a template for unit pricing, with a specific example (U1) detailing the unit price for removal and replacement of existing concrete pavement. This includes all associated labor, materials, equipment, and disposal needed to complete the work, with specific requirements for saw-cutting, concrete removal, surface finishing, curing, and joint sealing. The form allows for pricing to be provided per square foot (SF) or cubic foot (CF), and includes provisions for calculating overhead, profit, and bond costs according to the Change Order Proposal form SC-6.312. The pricing is intended to provide a standardized method for adjusting contract costs when scope modifications are required during the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State Form SBP–6.133 Issued 7/2022

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

UNIT PRICING FORM

Institution/Agency: Colorado Department of Corrections / Facility Management Services Project No./Name: EMP25-009 / Natural Gas Line Relocation, Arkansas Valley Correctional Facility

The unit prices below shall be used to determine adjustment to the contract sum when changes in the work involving said items are deemed necessary.

Unit Prices shall apply until the date of contract completion established at the time of Notice to Proceed.

All unit prices shall include the pro-rata share of all costs of materials, equipment and disposal required to complete the work item. Overhead, profit and bond will be calculated per Change Order Proposal form SC- 6.312.

(Note: Architect/Engineer should complete a brief description below based on their complete description provided in Division 01 of their specification before inserting into the solicitation)

UNIT PRICING

Number Description Unit of Measure

Unit Price

U1 Removal and replacement of existing concrete pavement, including all labor, materials, equipment, and disposal necessary to complete the work per project requirements. Include saw-cutting and removal of existing concrete pavement and surface finishing, curing, and joint sealing.

SF

or

CF $

THE BIDDER:

Company Name

Signature Date

STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
UNIT PRICING FORM
Colorado Department of Corrections / Facility Management Services
EMP25-009 / Natural Gas Line Relocation, Arkansas Valley Correctional Facility

File details come from the government source that posted it. Updated .