Appendix B1 - Bid Alternates SCCF Dementia Unit Improvements.pdf

PDF 227 KB Posted

Attached to
CTF SCCF Dementia Unit Improvements IFB1 TBD CMS210935
Solicitation number
IFB1 CAAA 2027000030 1
Issued by
El Paso County, Colorado Springs City, Colorado

About this file

This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for the Colorado Department of Corrections' Dementia Unit Improvements project at San Carlos Correctional Facility (Project No. ADA27-001). The form provides a structured template for bidders to submit pricing for additive and deductive alternates to the base bid. One identified additive alternate (A.A.1) involves replacing light fixtures in 21 remaining cells within the dementia unit. The document specifies that additive and deductive alternates are mutually exclusive—if additive alternates are accepted, deductible alternates cannot be used, and vice versa. The form includes ten line items each for additive and deductive alternates, with corresponding specification section references and pricing columns, though most descriptions and pricing fields remain blank in this template version.

Bidders are required to complete the form by entering descriptions of alternates, associated specification sections, and proposed pricing for each line item. The form requires the bidder's company name, authorized signature, and date upon submission. The document references Item #8 in the Instructions to Bidders (SBP-6.12) for additional details regarding alternate procedures and requirements. No specific deadline dates, funding amounts, or contract term information is provided in this alternates form, as those details would be contained in the primary bid documents and project specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBP-6.131

Rev 7/2025 R1

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

BID ALTERNATES

Institution or Agency:

Project No./Project Name:

INSTRUCTIONS:

1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.

2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.

3. Refer to the contract documents for thorough description(s) of the alternates.

4. If alternates are accepted, the base bid will be modified by the amount entered below.

ADDITIVE ALTERNATES

Alt. # Description of Additive Alternate Spec. Section Pricing

A.A.1 $

A.A.2 $

A.A.3 $

A.A.4 $

A.A.5 $

A.A.6 $

A.A.7 $

A.A.8 $

A.A.9 $

A.A.10 $ lanexxTX Line lanexxTX Line

SBP-6.131

Rev 7/2025 R1

DEDUCTIVE ALTERNATES

Alt. # Description of Deductive Alternate Spec. Section Pricing

D.A.1

D.A.2 $

D.A.3 $

D.A.4 $

D.A.5 $

D.A.6 $

D.A.7 $

D.A.8 $

D.A.9 $

D.A.10 $

THE BIDDER

BY_________________________________________________________________

Company Name

BY__________________________________________________________________

Signature Date

BID ALTERNATES
INSTRUCTIONS:
ADDITIVE ALTERNATES
DEDUCTIVE ALTERNATES
THE BIDDER
TextInput.127: Colorado Department of Corrections
TextInput.173: ADA27-001 / Dementia Unit Improvements, San Carlos Correctional Facility
TextInput:
AA1:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1: Replace Light Fixtures in 21 remaining Cells
AA1S:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1:
AA1P:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1:
DA1:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1S:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1P:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:

Company Name:

File details come from the government source that posted it. Updated .