Appendix B_DQ Form_CAVEA Lighting MSU Denver.pdf
PDF 195 KB Posted
- Attached to
- CAVEA Lighting
- Solicitation number
- DQ1 GMAA 2027000142 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Documented Quote Form issued by the State of Colorado Office of the State Architect for the CAVEA Lighting project at Metropolitan State University of Denver (Project No. 26PR05). The form serves as the official bid submission document for contractors interested in providing labor and materials for the complete execution of work as described in the project's Bidding Documents, Drawings, and Specifications. Bidders are required to certify that they have thoroughly examined all project documents and the work site to understand the scope and conditions. The form requests the base bid quote amount, time of completion broken into two phases (Notice to Proceed to Substantial Completion, and Substantial Completion to Final Acceptance), and acknowledgment of any addenda received. Bidders must also declare whether services will be performed outside the United States or Colorado, confirm compliance with Colorado labor requirements, and identify if they are Service-Disabled Veteran Owned Small Businesses.
The form establishes standard bidding requirements including a bid guarantee of not less than 5% of the total bid for construction values of $50,000 or greater, with a 30-day hold period after bid opening. Successful bidders must execute the required Agreement and furnish Performance Bonds, Labor and Material Payment Bonds, and Insurance Policies within 10 days of Notice of Award. The document notes that certain requirements—including the 80% Colorado Labor compliance requirement, Service-Disabled Veteran Owned Small Business certification, Apprenticeship Utilization, and Prevailing Wage compliance—do not apply to projects for Metropolitan State University of Denver. Bidders are responsible for including all applicable taxes in their quote submissions and may submit alternate bids using the designated State Form SBP-6.13.1.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
DOCUMENTED QUOTE FORM
Institution or Agency:
Project No./Project Name:
Bidder Acknowledges Receipt of Addenda
Numbers: (See 3a below for the next 3 items)
Bidder Anticipates Services outside the United States or Colorado:* No Yes
Bidder will comply with 80% Colorado Labor on project above $500,000 No Yes
Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes
Quote $________________________
Time of Completion
Time Period from Notice to Proceed to Substantial Completion: ____________________________
Time Period from Substantial Completion to Final Acceptance: ____________________________
Total Time of Completion of Entire Project (a + b): _________________________
1. BID: Pursuant to the advertisement by the State of Colorado dated ______________ the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.
2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.
3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.
a. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) *
b. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) *
c. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs.
Attach proof of certification along with the bid submission. *
d. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S.
24-92-115
e. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.
4. BID GUARANTEE: This Quote is accompanied by the required Bid Guarantee. Per C.R.S.
§24-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Office of the State Architect, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy.
5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above.
6. EXECUTION OF DOCUMENTS: The bidder understands that if this Quote is accepted, bidder must execute the required Agreement and furnish (where required) the Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.
7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.
8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.
9. The right is reserved to waive informalities and to reject any and all Bids.
*Does not apply to projects for the Metropolitan State University of Denver.
SIGNATURES: If the Quote is being submitted by a Corporation, the Quote shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Quote, the Quote shall so indicate and be properly signed.
Dated this ________ Day of _______________________ , 20______
THE BIDDER:
By ________________________________________ _________________________________________________ Company Name Address
Phone Number ______________________________ _________________________________________________ City, State Zip Code
By ________________________________________ _________________________________________________ Name (Print) and Title Signature
| BID FORM |
| Base Bid ________________________ |
| Total Time of Completion of Entire Project (a b): _________________________ |
| THE BIDDER: |
| TextInput.119: Metropolitan State University of Denver |
| TextInput.165: 26PR05 / CAVEA Lighting |
| Check Box1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box2: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text3: |
| Text4: |
| 0: |
| 2: |
| Text5: |
| Text6: |
| Text7: 10/27/2026 |
File details come from the government source that posted it. Updated .