This is an Information for Bidders document issued by the State of Colorado Office of the State Architect State Buildings Program for the Colorado Department of Agriculture's Insectary Foundation Repair project (2027-034M26). Bidders are required to use the provided bid form and must bid on all alternates while specifying the timeline from Notice to Proceed to Substantial Completion in calendar days, as well as the period from Substantial Completion to Final Acceptance. Bids exceeding the completion timeframe indicated in the Advertisement for Bids will be rejected as non-responsive. Bidders may request clarification of bidding document inconsistencies at least three business days prior to bid opening, with major decisions issued as addenda. Requests for approval of "or equal" materials or equipment must be submitted in writing at least five business days prior to bid opening. All addenda issued by the owner or architect must be submitted no later than two business days before the bid opening date and must be acknowledged on the bid form.
Bid security of not less than 5 percent of the bid price is required for projects estimated at $50,000 or more, provided in the form of a surety bond, cash equivalent, or other form acceptable to the State. All bids must exclude applicable federal excise or manufacturers' taxes and all state sales and use taxes. Award will be made to the lowest responsible bidder taking into account Colorado resident bidder preference provisions, determined by the base bid combined with either deductible alternates (subtracted in numerical order to remain within available funds) or additive alternates (added in numerical order to remain within available funds), but not both. Bids must be submitted as a zip folder uploaded to the provided Box.Com link, titled with the IFB Number (IFB1,BDAA,2027-0032), project title, and offeror's name; bids submitted by other methods will not be accepted. All work must comply with Colorado state and local laws, approved state building codes, and prevailing wage requirements on public projects, including reporting requirements for embodied carbon emissions and Environmental Product Declarations meeting specified Global Warming Potential limits.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB1,BDAA,2027-0032,2 Insectary Foundation Repair FINAL.pdf | ||
| Appendix B1 SBP-6.133 Unit Pricing_2025.docx | DOCX document | |
| Appendix B SBP-6.13 Bid Form_2025.pdf | ||
| Appendix B2 SBP-6.14 Bid Bond_2025.docx | DOCX document | |
| Appendix D SC6.21 DBB A_2026.docx | DOCX document | |
| Appendix C SBP6.18 Labor Burden Calc R8-2023.docx | DOCX document | |
| CDA - Insectary Foundation Pre Bid Meeting Sign In Sheet.pdf | ||
| Appendix D SC6.23 DBB 2026_R2.docx | DOCX document | |
| Q&As as of 10.6.2026 IFB1,BDAA,2027-0032 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.12
Rev 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
INFORMATION FOR BIDDERS
Institution or Agency:
Project No./Project Name:
1. BID FORM: Bidders are required to use the Bid form attached to the solicitation.
Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days. In addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, in calendar days.
Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:
2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.
3. APPLICABLE LAWS AND REGULATIONS: All work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.
4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form
SBP-6.12
Rev 7/2025 satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.
5. TAXES: The Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the GENERAL CONDITIONS.
6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.
7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two
(2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.
8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative.
Bidders should note the Method of Award is applicable to this Bid as stated below.
A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by, and the contract will be awarded on the base bid combined with deductible alternates, accepted in numerical order as listed in the Bid Alternates Form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with additive alternates in numerical order in as listed in the Bid Alternates Form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
9. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation where settlement will be advertised in electronic media.
| INFORMATION FOR BIDDERS |
| DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by, and the contract will be awarded on the base bid combined with deductible alternates, accepted in numerical order as listed in the Bid Alternates Form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder. |
| ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with additive alternates in numerical order in as listed in the Bid Alternates Form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder. |
| DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used. |
| TextInput.136: Colorado Department of Agriculture |
| TextInput.182: 2027-034M26 / Insectary Foundation Repair |
| Submission Instructions: Upload your bid to the Box.Com link below, https://colorado.app.box.com/f/cd38243ef32b477b9e601ac1d23f50c5 attaching the bid as a zip folder. Bids sent by other methods will not be accepted. The Zip folder must be titled with the Invitation for Bid (IFB) Number, IFB Title, and the Offeror’s name as noted below: |
IFB1,BDAA,2027-0032 Insectary Foundation Repair_Company Name