Appendix A - Cost Breakdown.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
EEPZ248314-15 - Install Mx Hanger Fans
Solicitation number
EEPZ248314-15
Issued by

About this file

The file is a cost breakdown template for a construction project at Columbus Air Force Base. The solicitation (EEPZ248314-15) seeks a contractor to install two high-volume, low-speed (HVLS) ceiling fans in an existing building, with a project value between $100,000 and $250,000. The procurement requires contractors to complete Controlled Unilateral Information (CUI) training and obtain special access to drawings through SAM.gov.

The cost breakdown template includes sections for bonds and insurance, mobilization, architecture and engineering design, materials, equipment, labor, and miscellaneous charges. A mandatory site visit is scheduled for Tuesday, 17 June 2025 at 1:00 PM CST, with registration required by 12:00 PM CST on 13 June 2025. Contractors must provide photo identification and vehicle documentation, and all Request for Information (RFIs) must be submitted by 12:00 PM CST on 24 June 2025. The project is being managed by the Department of the Air Force Air Education and Training Command.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAFB

Appendix A - COLUMBUS AIR FORCE BASE
INSTRUCTIONS: Please provide information that properly reflects the total cost of the project. Refer to the Statement of Work and Sections L and M in the solicitation to ensure that your proposal meets the requirementsof this project.
SOLICITATION NUMBER:
CONSTRUCTION PRICE PROPOSAL BREAKDOWN
VENDOR'S INFORMATION
Name:
Address:
Phone Number:
Email:
NAICS Code
Cage Code:
SOLICITATION INFORMATION
Title of Project:
Solicitation Number:
Proposed Period of Performance
Number of Days Proposal and Price are Valid:
BONDS AND INSURANCEQTYUNIT OF ISSUEPRICETOTAL
Certificate of Insurance1
Performance Bonds1
Payment Bonds1
Bid Bonds1
subtotal
MOBILIZATIONQTYUNIT OF ISSUEPRICETOTAL
subtotal
ARCHITECTURE AND ENGINEERING DESIGNQTYUNIT OF ISSUEPRICETOTAL
35% Design
65% Design
95% Design
100% Design (Construction Set)
subtotal
MATERIALQTYUNIT OF ISSUEPRICETOTAL
subtotal
EQUIPMENTQTYUNIT OF ISSUEPRICETOTAL
subtotal
LABORHOURSUNIT OF ISSUERATEAMOUNT
subtotal
MISCELLANEOUS CHARGESQTYUNIT OF ISSUEPRICETOTAL
Misissippi State Tax
subtotal
CONSTRUCTION PROJECTTOTAL PROJECT PRICE
GENERAL INFORMATION
The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal that reflects the total cost of the project. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate.

File details come from the government source that posted it. Updated .