Appendix A - Cost Breakdown.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Replace Base Ops Generator - B847
- Solicitation number
- FA302225R0006
About this file
The document is an Appendix A Cost Breakdown spreadsheet for a construction project involving generator replacement at Columbus Air Force Base. The solicitation (FA302225R0006) requires a full replacement of the backup generator for the Base Ops Facility (B847), which includes a 120/208V 125 kW Generator, day tank, fuel pump, and Automatic Transfer Switch. The project is valued between $100,000 and $250,000, and proposals will be submitted electronically.
Key procurement details include a mandatory site visit on Monday, 12 May 2025 at 1:30 PM CST, with registration required by 2:00 PM CST on 07 May 2025. Contractors must complete Controlled Unclassified Information (CUI) training, sign a training acknowledgment, and obtain document access through SAM.gov. All Request for Information (RFI) submissions are due by 2:00 PM CST on 15 May 2025. Attendees must bring valid photo identification, and vehicles must have proper documentation. The procurement is being managed by the Department of the Air Force Air Education and Training Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Appendix A |
| CONSTRUCTION PRICE PROPOSAL BREAKDOWN |
| VENDOR'S INFORMATION |
| Name: |
| Address: |
| Phone Number: |
| Email: |
| Cage Code: |
| SOLICITATION INFORMATION | ||||
| Title of Project: | ||||
| Solicitation Number: | ||||
| Days proposal good for: | ||||
| BONDS AND INSURANCE | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| Certificate of Insurance | 1 | |||
| Performance Bonds | 1 | |||
| Payment Bonds | 1 | |||
| Bid Bonds | 1 | |||
| MOBILIZATION | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| ARCHITECTURE AND ENGINEERING DESIGN | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| 35% Design's | ||||
| 65% Design's | ||||
| 95% Design's | ||||
| 100% Design's (Construction Set) | ||||
| MATERIAL | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| EQUIPMENT | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| LABOR | HOURS | UNIT OF ISSUE | RATE | AMOUNT |
| MISCELLANEOUS CHARGES | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| CONSTRUCTION PROJECT | GRAND TOTAL | |||
| GENERAL INFORMATION | ||||
| The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit certified cost or pricing data. (Updated Nov. 19, 2013) |
supportable and well-prepared propsal. The basis and rationale for all proposed pricing should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate.
File details come from the government source that posted it. Updated .