Appendix A-4 Conveyance Systems.pdf

PDF 530 KB Posted

Attached to
HOUSEKEEPING SERVICES AT THE JOHN F. KENNEDY CENTER FOR THE PERFORMING ARTS
Solicitation number
33310522R0002
Issued by

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A-4

Conveyance Systems

Kennedy Center Elevators

EISENHOWER

THEATER

OPERA HOUSE CONCERT HALL

2E-1 & 2E-2:

Main elevators from C-Level Garage to Roof Terrace Level

3E-1:

OH Orchestra Level (north hall)

- from Bunker Level to 2nd Tier

4E-1 & 4E-2:

Main elevators from C-Level Garage to Roof Terrace Level

2E-3 & 2E-4:

Main elevators from Hall of States to Roof Terrace Level

3E-2:

OH Stage - Stagehand elevator to pin rail/grid

4E-3 & 4E-4:

Main elevators from Hall of Nations to Roof Terrace Level

2E-5:

ET Orchestra Level- from Orchestra Level to 3rd Floor

3E-3:

OH Stage Door - from Dressing Rooms to Rehearsal Rooms

4E-5:

Concert Hall Stage Door - from LD #2 to Roof Terrace Kitchen

2E-6:

ET Back Stage - from Dressing Rooms to 3rd Floor Admin

3E-4 & 3E-7:

From A Level “Canteen” to Roof Terrace Restaurant Hallway

4E-6:

CH Orchestra Level (south hall) -from Orchestra Level to 2nd Tier

2E-7:

ET/Family Theater Stage Door to Terrace Theater Stage Door

3E-5:

OH Backstage - Freight Elevator from LD#1 to Rehearsal Rooms

4E-7:

CH Freight Elevator - from LD #2 to Roof Terrace Kitchen

2E-8:

Administrative elevator behind

– from HON to 3rd floor

3E-6:

OH Orchestra Level - Orchestra Level to 2nd Tier

2E-9:

ET Stage – Stagehand elevator to pin rail/grid

3E-8:

3rd floor Education Department:

Accessibility elevator between floors

2E-10:

ET Freight Elevator – from LD#1 to Roof Terrace

3E-9:

Theater Lab front of house to mezzanine level

2E-11:

Inside Family Theater – from 1st to 2nd Level

2E12:

Terrace Theater Elevator

Kennedy Center Escalators

Escalator #1 – Hall of States – C Level to B Level

Escalator #2 – Hall of States – B Level to A Level

Escalator #3 – Hall of States – A Level to Hall of States

Escalator #4 – Hall of Nations – C Level to B Level

Escalator #5 – Hall of Nations – B Level to A Level

Escalator #6 – Hall of Nations – A Level to Hall of Nations

Kennedy Center Lifts

Concert Hall 2nd Tier – South side

Concert Hall 1st Tier – North side

Eisenhower Stage Door

Opera House – North Opera Tier Lounge

Opera House – South Opera Tier Lounge

REACH Elevators

Elevator 5E-1 - Entry Pavilion

Elevator 5E-2 - Entry Pavilion

Elevator 5E-3 * - Service Elevator

Elevator 6E-1 * - River Pavilion

* The Restaurant contractor is responsible for cleaning the floors of 5E-3 and 6E-1

File details come from the government source that posted it. Updated .