Appendix_1_Permits.pdf
PDF 10 MB Posted
- Solicitation number
- 24-0791-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is a Florida Department of Transportation (FDOT) Utility Permit for Pinellas County Utilities, specifically for the 53rd Avenue N Force Main Replacement project. The permit authorizes the replacement and abandonment of approximately 2,756 linear feet of existing 20-inch and 24-inch prestressed concrete cylinder pipe (PCCP) force main along 53rd Avenue N. The project aims to address the existing facility's deteriorated conditions, which have resulted in two previous pipe ruptures causing sewage spills. The proposed work includes installing 2,598 linear feet of 20-inch fusible C-900 PVC pipe and 170 linear feet of 20-inch C-900 PVC pipe, with the new force main connecting to existing infrastructure near Duhme Road and Seminole Boulevard. The project will involve drilling under Seminole Boulevard and is scheduled to begin on 2/11/2024, with an anticipated 181 calendar days needed for completion.
The permit details specific requirements for utility work within FDOT right-of-way, including traffic control, lane closure restrictions, and restoration guidelines. The work is limited to Monday through Friday, 7:00 AM to 5:30 PM, with specific provisions for emergency contact, pedestrian pathway maintenance, and roadway restoration. The project requires coordination with multiple utility owners, including Charter Communications, Zayo Group, Duke Energy, Frontier Communications, and Knology Broadband, who were notified on 5/17/2023. The permit includes comprehensive construction notes addressing everything from bore pit depths to pavement restoration techniques, emphasizing safety, environmental considerations, and maintaining the integrity of the transportation infrastructure during the utility replacement project.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rule 14-46.001 F.A.C.
FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016
UTILITY PERMIT
PERMIT NO:__________________________________
STATE ROAD INFORMATION
County: Section: State Road No: Beginning Mile Post: Ending Mile Post:
APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.
Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________
Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________
City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________
Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________
WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation.
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No
TRAFFIC CONTROL (TCP)
The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.
MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
Name: ________________________________ Telephone ________________________ Email: _______________________________
COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.
Anticipated Start Date: ___________________ Calendar days needed to completed: ________
Pinellas
(727) 464-4223 ext. ______
Florida
SR-595
Pinellas County Utilities
2/11/2024
10.403
14 S. Fort Harrison Avenue
600, 603, 625
33756
The purpose of this project is to replace and abandon approximately 2756 LF of an existing 20-inch and 24-inch prestressed concrete cylinder pipe (PCCP) force main along 53rd Avenue N. to address the existing facility’s deteriorated conditions.
The existing force main has ruptured twice within the project limits, resulting in sewage spills within the street and adjacent private properties. The proposed pipe includes 2598 LF of 20-inch fusible C-900 PVC and 170 LF of 20-inc ... (see work description cont. page)
2023-H-799-00253
15010000
Pinellas County Utilities
Clearwater dsimpson@pinellascounty.org
10.421
Approved 2023-H-799-00253 Chris M. Gregory
10/2/2023
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________ Name (printed): _____________________________________________ Name (printed): __________________________________________ Title: ______________________________________________________ Title: ___________________________________________________
FDOT PROJECT INFORMATION
Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits:
FDOT SPECIAL INSTRUCTIONS
In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.
Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No
PERMIT APPROVAL
By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.
Approving Engineer: _____________________________________________ Date: _______________ Name: _____________________________________________
Title:______________________________________________
Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________
An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No Rep. Name: _____________________________ Telephone _____________________ Email: _____________________________
10/2/2023
Permittee is to contact local maintaining agency, WEBBER SERVICES at 727-573- 7672, for roadway lighting locates prior to beginning work in State right-of-way.
Work and inspections must be scheduled with Webber before beginning work.
Permittee shall notify FDOT RTMC at 813-615-8657 of the exact time any lane closure begins and a second notification when lane closure is removed.
8/18/2023
(727) 575-8300 ext. ______ Chris.Gregory@dot.state.fl.us
Chris M. Gregory
Chris M. Gregory (digital signature) lisa.gallman@wwebber.com
DENNIS SIMPSON (digital signature)
Charter Communications5/17/2023 Zayo Group5/17/2023 Duke Energy - St. Petersburg5/17/2023 Frontier Communications5/17/2023 Knology Broadband of FL5/17/2023
DENNIS SIMPSON
7275737672
Lisa Gallman
MAINTENANCE MANAGER/PERMITS
2023-H-799-00253
There are NO FDOT constructions (proposed or underway).
This work is NOT related to an approved Utility Work Schedule.
Approved 2023-H-799-00253
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________ Name (printed): _____________________________________________ Name (printed): ____________________________________________ Title: ______________________________________________________ Title: ____________________________________________________
FINAL INSPECTION OF WORK
The work was inspected and found to be in non-compliance as noted below:
All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.
FDOT Inspector: _____________________________________________ Date: _______________ Name: _____________________________________________
Title: ______________________________________________
2023-H-799-00253
Approved 2023-H-799-00253
PERMIT NO.:
The complete Work Description could not fit in the space allotted on Page 1 of the Utility Permit so it is displayed below.
Work Description work description continuation page
2023-H-799-00253
The purpose of this project is to replace and abandon approximately 2756 LF of an existing 20-inch and 24-inch prestressed concrete cylinder pipe (PCCP) force main along 53rd Avenue N. to address the existing facility’s deteriorated conditions. The existing force main has ruptured twice within the project limits, resulting in sewage spills within the street and adjacent private properties. The proposed pipe includes 2598 LF of 20-inch fusible C-900 PVC and 170 LF of 20-inch C-900 PVC. The proposed 20-inch force main will connect to an existing 20-inch PCCP force main at approximately 100 feet east of Duhme Road, and traverse east tying into an existing 24-inch PVC force main at approximately 150 feet east of Seminole Boulevard.
The proposed 20-inch pipe will be drilled under Seminole Blvd, as shown in the plans provided.
Approved 2023-H-799-00253 continuation page
PERMIT NO.:
STATE ROAD INFORMATION:
NAME OF OTHER FACILITY OWNERS / DATE NOTIFIED:
FDOT PROJECT INFORMATION:
THE WORK WAS INSPECTED AND FOUND TO BE IN NON-COMPLIANCE AS NOTED BELOW:
Facility Name: Pinellas County Utilities - Sewer, Date Notified: 5/17/2023, Facility Name: TECO People's Gas - St.
Petersburg, Date Notified: 5/17/2023, Facility Name: Pinellas County Utilities - Water, Date Notified: 5/17/2023, Facility Name: Pinellas County HWY/ENG, Date Notified: 5/17/2023, Facility Name: Uniti Fiber LLC, Date Notified: 5/17/2023
There are NO FDOT constructions (proposed or underway).
This work is NOT related to an approved Utility Work Schedule.
2023-H-799-00253
Approved 2023-H-799-00253
REQUIRED NOTIFICATIONS
TWO (2) BUSINESS DAYS
BEFORE STARTING WORK:
PERMIT TYPE WHO TO CONTACT WHAT TO DO
FDOT One-Stop Permitting (OSP)
Enter MOT Technician Information.
Click on either “48 Hour Request to Begin Work” or “2 Business Day Notice”.
FDOT Pinellas Operations Permits
Asset Contractor Call Webber Infra at 727-573-7672 for inspections.
Sunshine 811 Call Sunshine 811 for locates (other than roadway lighting).
All Permits and Agreements
FDOT Regional Traffic Management
Center (RTMC)
Call FDOT Regional Traffic Management Center at 813-615-8657 of the Exact Time Any Lane Closure Begins and a Second Notification When Lane Closure is Removed.
Utility Permits Highway Lighting and ATMS Locates
Highway Lighting and ATMS are not part of the Sunshine 811 Locate System. Permittee is to Contact the Maintaining Agency/Organization for Highway Lighting and ATMS Locates.
As-Needed FDOT Advanced
Dynamic Message Sign (ADMS) Arterial
Locates
Call FDOT SunGuide at 813-615-8613 (prefer email to Romona.Burke@dot.state.fl.us).
Permits in Active FDOT Construction
Project
FDOT Construction Office
Call Jeyson Arroyave at 813-220-1872 to Coordinate MOT and Work.
Approved 2023-H-799-00253 Chris M. Gregory mailto:Romona.Burke@dot.state.fl.us
THIS FDOT PERMIT COVERS ACCESS
TO FDOT RIGHT-OF-WAY FOR
PROPOSED WORK.
PERMITTEE/UAO/CONTRACTOR IS
RESPONSIBLE FOR SECURING
AUTHORIZATION FROM ANY PROPERTIES
OUTSIDE OF THE FDOT RIGHT-OF-WAY
THAT MAY BE UTILIZED FOR THE
PROPOSED WORK.
WORKDAYS AND TIMES ARE MONDAY
THRU FRIDAY, 7:00 AM TO 5:30 PM.
Approved 2023-H-799-00253
PID 005582A
100% PLANS FOR
53RD AVE N
FORCE MAIN REPLACEMENT
FINANCIAL PID 005582A
Approved 2023-H-799-00253 Chris M. Gregory
10/2/2023
Morgan, Taylor Line
Morgan, Taylor Line
Morgan, Taylor Line
Morgan, Taylor Line
Morgan, Taylor Line
Feet 3001500 75
1000 N. ASHLEY DRIVE, SUITE 900
TAMPA, FLORIDA USA 33602
Phone 813.620.4500 www.Halff.com
FL CA 33380 FL LC 26000645
Approved 2023-H-799-00253
1000 N. ASHLEY DRIVE, SUITE 900
TAMPA, FLORIDA USA 33602
Phone 813.620.4500 www.Halff.com
FL CA 33380 FL LC 26000645
SCALE: 1" = 4'
Approved 2023-H-799-00253
Phone 813.620.4500 www.Halff.com
FL CA 33380 FL LC 26000645
Feet 100500 10
Approved 2023-H-799-00253
Phone 813.620.4500 www.Halff.com
FL CA 33380 FL LC 26000645
Feet 100500 10
Approved 2023-H-799-00253
ST
AT
E R
O
AD
(U .S
. H W
Y
)(P
(A
LT
. U .S
. H W
Y
)(P )(F
(S
EM
IN
O
LE
B
LV
D
F)
53rd AVE. N.(P)53rd AVE. N.(F)
Feet
40200 10
1000 N. ASHLEY DRIVE, SUITE 900
TAMPA, FLORIDA USA 33602
Phone 813.620.4500 www.Halff.com
FL CA 33380 FL LC 26000645
Approved 2023-H-799-00253 Chris M. Gregory
10/2/2023
Taylor Morgan Rectangle
Phone 813.620.4500 www.Halff.com
FL CA 33380 FL LC 26000645
SCALE: 1" = 4'
SCALE: 1" = 4'
Approved 2023-H-799-00253
N
HA
HA
BORING TERMINATED
AT ELEVATION 9.3 FEET
LATITUDE: N 27.8202014
LONGITUDE: W 82.7877045
N
BORING TERMINATED
AT ELEVATION -1.0 FEET
LATITUDE: N 27.8202631
LONGITUDE: W 82.7864684
11/21/22 11/21/22
2" PAVEMENT
9" LIMEROCK BASE MATERIAL
4" PAVEMENT
6.5" SHELL BASE MATERIAL
DARK BROWN FINE SAND (SP)
LIGHT BROWN SLIGHTLY SILTY SAND (SP-SM)
LIGHT BROWN SAND (SP)
LIGHT BROWN SLIGHTLY SILTY SAND WITH TRACE ROOTS (SP-SM)
DARK BROWN-GRAY SLIGHTLY SILTY SAND WITH TRACE SHELL DARK BROWN-GRAY SLIGHTLY SILTY SAND WITH FEW SHELL
WOOD AND GRAVEL WITH SOME SILTY SAND
BROWN-GRAY SLIGHTLY SILTY SAND (SP-SM)
BROWN-GRAY SAND WITH TRACE DECAYED WOOD
DARK BROWN SLIGHTLY SILTY SAND WITH TRACE CEMENTED
DARK BROWN SLIGHTLY SILTY SAND (SP-SM)
DARK GRAY SILTY SAND WITH CEMENTED FRAGMENTS (SM)
AND CEMENTED SAND FRAGMENTS AND TRACE DECAYED
FRAGMENTS (SP)
SAND FRAGMENTS (SP-SM)
FRAGMENTS (SP-SM)
Soil Profile Notes:
1. The profiles depicted are of a generalized nature to highlight the major subsurface stratification features and material characteristics. The soil profiles include soil description, stratifications and penetration resistances. The stratifications shown on the boring profiles represent the conditions only at the actual boring location. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the actual transition may be gradual.
2. Groundwater levels generally fluctuate during periods of prolonged drought and extended rainfall and may be affected by man-made influences. In addition, a seasonal effect will also occur in which higher groundwater levels or temporary perched conditions are normally recorded in rainy seasons.
3. The Boring Locations Presented are Approximate and Based on Hand Held GPS with an Accuracy of +/- 10 Feet.
4. SPT borings were performed using a safety hammer.
DATE APPROVED
REVISIONS DATENAME
SUPERVISED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PREPARED BY:
NO. DESCRIPTIONS
3B
SHEET NO.PROJECT NO.PROJECT NAME
D :\1
-A re hn a\
Pr oj ec ts
\2
2\ B
-2 2-
7.
rd
A ve
N F or ce
M ai n\ B
-2 2-
7.
.d w g
(3 B
-P R
F)
D ec
1,
- 4 :4
6p m
SOIL BORING PROFILES
Andy Tao, P.E.
53RD AVE N FORCE MAIN
ST. PETERSBURG, FLORIDAAT
DG
GA
B-22-007.03Engineering,Inc.AREHNA 12296 Wiles Road, Coral Springs, FL 33076 Phone 954.417.8412 Fax 813.944.4959
Certificate of Authorization No. 28410
11/2022 11/2022 11/2022
SPT-03 SPT-04
ELEV. 24.3' ELEV. 24.0'
-200=3
NMC=23
OC=1
-200=2
NMC=21
LESS THAN 3
3 to 8 8 to 24 24 to 40
GREATER THAN 40
VERY SOFT
SOFT
FIRM
STIFF
VERY STIFF
HARD
LESS THAN 1
1 to 3 3 to 6 6 to 12 12 to 24
GREATER THAN 24
AUTOMATIC
HAMMER
SAFETY
HAMMER
LESS THAN 4
4 to 10 10 to 30 30 to 50
GREATER THAN 50
LESS THAN 2
2 to 4 4 to 8 8 to 15 15 to 30
GREATER THAN 30
VERY LOOSE
LOOSE
MEDIUM
DENSE
VERY DENSE
SPT
(BLOWS/FT)
SPT
(BLOWS/FT)
SPT
(BLOWS/FT)
SPT
(BLOWS/FT)
SILTS AND CLAYS
CONSISTENCY
GRANULAR MATERIALS-
RELATIVE DENSITY
PAVEMENT, BASE
AND/OR SUBGRADE
LEGEND
FINE SAND (SP/SP-SM)
SILTY SAND (SM)
GROUNDWATER TABLE AT THE TIME OF DRILLING
UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D
2488) GROUP SYMBOL AS DETERMINED BY VISUAL
REVIEW AND/OR LABORATORY TESTING
SP
SPT N-VALUE IN BLOWS/FOOT FOR 12 INCHES OF
PENETRATION
N
HAND AUGERHA
-200 FINES PASSING THE #200 STANDARD SIEVE (%)
LL LIQUID LIMIT (%)
PI PLASTICITY INDEX (%)
NMC NATURAL MOISTURE CONTENT (%)
OC ORGANIC CONTENT (%)
CLAYEY SAND (SC)
-5
EL
EV
A
TI
O N
IN
F
EE
T, N A
VD
-5
EL
EV
A
TI
O N
IN
F
EE
T, N A
VD
WOOD FRAGMENTS (SP-SM)
Approved 2023-H-799-00253
Approved 2023-H-799-00253
FDOT CONSTRUCTION NOTES FOR UTILITIES
1. Aerial crossings of State roads involving temporary lane closures are to be done between the hours of 12:00 am and 5:00 am Monday through Thursday unless previously approved by the Department.
2. When directional bore is the method of installation, a minimum 24-inch separation shall be maintained from all existing utilities, ITS/ATMS lines, and storm drain systems while maintaining the minimum required depth under pavement or non-paved ground.
3. If the proposed utility cannot be installed per the approved permitted plan and by FDOT specifications, a revised plan must be provided to the Department for review and approval prior to the installation of products or materials at the given locations where conflicts occur.
4. Any new proposed plan shall include cross sections, plan views and profiles of the State Road adequately reflecting all right-of-way features including but not limited to existing utilities, storm drain systems and any above or below ground appurtenances where applicable.
5. No pedestrian pathway is to be removed, blocked, or disturbed without having a sufficient designated temporary pedestrian pathway with all appropriate pedestrian maintenance of traffic signs (Index 660) in-place prior to pathway being affected.
6. All temporary pedestrian pathways must be firm and unyielding.
7. Any sidewalk disturbed will be replaced by section within 72 hours to FDOT specifications.
8. Any sidewalk fronting the property that is cracked, damaged or unstable and is creating an ADA trip hazard must be replaced by section, using Standard #520-001, #522-002, and #522-001 for the construction of sidewalk and meet current ADA Standards. All concrete placed in the right of way shall be a minimum of 6" thick, FDOT Certified Class 1 non-structural, 57 stone, 2500 PSI concrete, with fiber mesh material from a FDOT approved plant.
9. FDOT reserves the right to make adjustments to any permitted method of installation, scope of work, and restoration that may be required to positively support life, safety, and environmental well-being of all users of the transportation system.
10. The Permittee shall notify the FDOT of date of completion, request a final inspection, and a Notice of Final Acceptance.
11. All construction and/or maintenance in the FDOT right-of-way shall conform to the Federal Manual on Uniform Traffic Devices (MUTCD), the FDOT Roadway and Traffic Design Standards, the Standard Specifications for Road and Bridge Construction, the Florida Design Manual, and the Drainage Manual.
12. Prior to removal of existing curb or driveway, the edge of travel shall be sawcut to avoid damaging the existing roadway asphalt. All concrete to be removed in FDOT right-of-way shall be sawcut and removed from the nearest joint.
13. No lane closure of any State roadway is allowed without a minimum of two (2) business days advance notification and approval from
FDOT.
14. Lane closures must be limited to Sunday through Thursday 8:00 pm to 5:30 am unless otherwise approved by FDOT.
15. Any sidewalk damaged because of work being performed in association with the Permittee and Contractor shall be removed and replaced with 6-inch-thick Class 1 non-structural, 2,500 PSI with fiber mesh.
16. Open cutting of any roadway, driveway or sidewalk outside those limits identified within the permit are not allowed without prior approval of FDOT.
17. The Contractor shall have an authorized person available at/or near the work site on a 24-hour basis, 7 days a week in order to address emergency issues associated with the project.
18. No stockpiling, storing or semi-permanent use of the right-of-way is authorized unless specifically identified within the permit.
19. No work shall be performed during the weeks of any State or Federal holiday unless otherwise approved in writing by FDOT.
20. No work requiring lane or sidewalk closure shall be performed during Spring Break on SR 699 (Gulf Boulevard). Spring Break is identified as March 1 thru the first Monday following Easter. During this time, lane and sidewalk closures on all State roadways that lead to SR 699 (Gulf Boulevard) will be restricted to night work, Sunday thru Thursday, 8:30 pm to 5:30 am.
21. The permitted work schedule is defined as Monday through Friday 7:00 am to 5:30 pm unless otherwise noted within the permit. Any work desired outside of this period must be requested in advance and approved before working the alternate schedule.
22. When work is associated with roadway modifications and/or site development, the Contractor is required to have a preconstruction meeting with the FDOT inspector two weeks prior to any construction beginning within the right-of-way.
23. All work performed under this permit within the right-of-way is to be scheduled with FDOT inspection staff.
24. Roadway restoration shall utilize 100 PSI excavatable flowable fill material and asphalt placed within the State right-of-way shall be placed full-depth, two 2.5-inch lifts of SP 12.5, two 1.5-inch lifts of SP 9.5. Typical sections will need to be provided within the plans for the pavement placement. A stair step method should be incorporated, prior to placing asphalt, to avoid vertical joints. Milling of the patch may be required based on the patched surface performance. The milling shall be utilized for surface leveling to a thickness equal to or greater than the existing friction coarse material. The milling limits are 50-foot of the patch along the longitudinal path of the lane, full lane width and to include any adjacent bike lanes, shared path, or urban shoulder sections.
Approved 2023-H-799-00253
25. Any disruptions to any permeable pedestrian way and bike lane are to be restored as work continues. All patches shall be full width from outside edge of pedestrian path to white line edge of travel lane with stair step (staggered) joints. Restoration to include backfill with existing sub-grade material and #57 stone as base material (compact in 6-inch lifts) to bottom of existing pervious asphalt base, followed by permeable design mix (if available) or FC-5 (Friction Course) mix with a minimum of two 2-inch and a maximum of two 3-inch lifts. Maintain ingress/egress on all drives and side streets during construction.
26. Any bore pit greater than five (5) feet in depth requires a Sheeting and Shoring Plan as well as a Dewatering Plan.
Approved 2023-H-799-00253
| Sheets and Views |
| 01 KEY SHEET |
| 02 SIGNATURE SHEET |
| 03 GENERAL NOTES |
| 04 KEY MAP & LEGEND |
| 05 STA (10+00.00-15+80.00) |
| 06 STA (15+80.00-21+60.00) |
| 07 STA (21+60.00-27+40.00) |
| 08 STA (27+40.00-33+20.00) |
| 09 STA (33+20.00-38+72.19) |
| 10 CROSS SECTION |
| 11 DETAILS |
| 12 DETAILS |
| 13 DETAILS |
| 14 EROSION CONTROL DETAILS |
| 15 EROSION CONTROL NOTES |
| 16 TRAFFIC CONTROL PLAN SCENARIO A |
| 17 TRAFFIC CONTROL SCENARIO B |
| Sheets and Views |
| 09 STA (33+20.00-38+72.19) |
| 10 CROSS SECTION |
File details come from the government source that posted it. Updated .