The document is a Permit Index for the High Point Community Park project in Pinellas County, Florida, prepared by the Southwest Florida Water Management District (SWFWMD). The permit index outlines various environmental and construction-related permits required for the project, including an exemption from Environmental Resource Permit (ERP) for the proposed removal of existing impervious areas and construction of new sidewalks, recreational equipment storage structures, basketball court relocation, and associated infrastructure. The project results in a net decrease of approximately 7,965 square feet of impervious area.
The permits listed include no-charge permits from SWFWMD, Pinellas County Habitat Management, Dewatering, Department of Environmental Protection for water main and sanitary sewer extensions, and a $400 National Pollutant Discharge Elimination System (NPDES) Construction Generic Permit for large construction sites over 5 acres. The document indicates that the contractor is responsible for obtaining most permits, which will be issued at the pre-construction meeting or as directed by the county. A link to Pinellas County's Permitting Guide and Access Portal is provided for additional information.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1- PERMITS
P.I.D. NO. 002998A
High Point Community Park
In Pinellas County, Florida
PERMIT INDEX
AGENCY PERMIT No. PERMIT FEE / OTHER
SWFWMD
Exempt File Number: 854355 No permit charge
Pinellas County Habitat Management Permit –
CONTRACTOR SHALL
OBTAIN
Issued to Contractor at Pre-construction meeting if applicable or as directed by the County.
No permit charge
Dewatering Permit –
CONTRACTOR SHALL
OBTAIN
Issued to Contractor following the Pre-construction meeting if applicable or as directed by the County.
National Pollutant Discharge Elimination System (NPDES) – Construction Generic Permit
The Contractor shall obtain this permit – refer to:
https://floridadep.gov/water/stormwater/content/con struction-activity
Large Construction (>5 acres)
$400.00
Department of Environmental Protection (DEP) – Permit for Construction of Water Main Extensions PWS
Department of Environmental Protection (DEP) - Sanitary Sewer Permit
Link to information regarding Pinellas County’s Permitting Guide and Access Portal:
https://pinellas.gov/permitting-guide/ https://floridadep.gov/water/stormwater/content/construction-activity https://floridadep.gov/water/stormwater/content/construction-activity https://pinellas.gov/permitting-guide/
February 02, 2023
Pinellas Couny Public Works Attn: Paul Cozzie 14 South Fort Harrison Avenue Clearwater, FL 33756
Subject: Project Evaluation - Permit Not Required Project Name: Highpoint Park File Number: 854355 County: Pinellas Sec/Twp/Rge: S32/T29S/R16E
References: Chapter 62-330, Florida Administrative Code (F.A.C.)
Section 373.406(6), Florida Statues (F.S.)
Dear Mr. Cozzie:
The District has reviewed the information you submitted for the project referenced above and has determined that an Environmental Resource Permit (ERP) will not be required for the proposed removal of existing impervious area associated with driveways and parking and the construction of new sidewalks, recreational equipment storage structures, relocation of existing basketball courts, and associated infrastructure. The proposed project results in a net decrease of approximately 7,965 square feet of impervious area. [Rule 62-330.051(2), F.A.C.]
The information received by the District will be kept on file to support the District's determination regarding your application. This information is available for viewing or downloading through the District's Application and Permit Search Tools located at www.WaterMatters.org/permits.
The District's determination that your project does not require an ERP is only applicable pursuant to the statutes and rules in effect at the time the information was submitted and may not be valid in the event subsequent changes occur in the applicable rules and statutes. Additionally, this notification does not mean that the District has determined that your project is permanently exempt from permitting requirements. Any subsequent change you make in the project's operation may necessitate further evaluation or permitting by the District. Therefore, you are advised to contact the District before beginning the project and before beginning any activity which is not specifically described in your submittal. Your timely pursuit of this activity is encouraged to avoid any potential rule changes that could affect your request.
This letter constitutes notice of Intended Agency Action of the project referenced above. The District’s action in this matter only becomes closed to future legal challenges from members of the public if such persons have been properly notified of the District’s action and no person objects to the District’s action within the prescribed period of time following the notification. The District does not publish notices of agency action. If you wish to limit the time within which a person who does not receive actual written notice from the District may request an administrative hearing regarding this action, you are strongly encouraged to publish, at your own expense, a notice of agency action in the legal advertisement section of a newspaper of general circulation in the county or counties where the activity will occur. Publishing notice of agency action will close the window for filing a petition for hearing. Legal requirements and instructions for publishing notice of agency action, as well as a noticing form that can be used is available from the District’s website at www.WaterMatters.org/permits/noticing. If you publish notice of agency action, a copy of the affidavit of publishing provided by the newspaper should be sent to the Regulation Division at the District Service Office that services this permit or other agency action, for retention in the File of Record for this agency action.
If you have questions regarding this matter, please contact Brandee Alexander, in the Tampa Service Office, at 8134456649. Please reference the Project Name and Inquiry/Permit Number in future communications concerning this project.
Sincerely, David Kramer, P.E.
Bureau Chief Environmental Resource Permit Bureau Regulation Division
Enclosures: Notice of Rights cc: Pennoni Associates, Inc.
Peter Nikolov
Notice of Rights
Administrative Hearing
1. You or any person whose substantial interests are or may be affected by the District’s intended or proposed action may request an administrative hearing on that action by filing a written petition in accordance with Sections 120.569 and 120.57, Florida Statutes (F.S.), Uniform Rules of Procedure Chapter 28-106, Florida Administrative Code (F.A.C.) and District Rule 40D-1.1010, F.A.C. Unless otherwise provided by law, a petition for administrative hearing must be filed with (received by) the District within 21 days of receipt of written notice of agency action. “Written notice” means either actual written notice, or newspaper publication of notice, that the District has taken or intends to take agency action. “Receipt of written notice” is deemed to be the fifth day after the date on which actual notice is deposited in the United States mail, if notice is mailed to you, or the date that actual notice is issued, if sent to you by electronic mail or delivered to you, or the date that notice is published in a newspaper, for those persons to whom the District does not provide actual notice.
2. Pursuant to Subsection 373.427(2)(c), F.S., for notices of intended or proposed agency action on a consolidated application for an environmental resource permit and use of sovereignty submerged lands concurrently reviewed by the District, a petition for administrative hearing must be filed with (received by) the District within 14 days of receipt of written notice.
3. Pursuant to Rule 62-532.430, F.A.C., for notices of intent to deny a well construction permit, a petition for administrative hearing must be filed with (received by) the District within 30 days of receipt of written notice of intent to deny.
4. Any person who receives written notice of an agency decision and who fails to file a written request for a hearing within 21 days of receipt or other period as required by law waives the right to request a hearing on such matters.
5. Mediation pursuant to Section 120.573, F.S., to settle an administrative dispute regarding District intended action is not available prior to the filing of a petition for hearing.
6. A request or petition for administrative hearing must comply with the requirements set forth in Chapter 28-106, F.A.C. A petition for a hearing must: (1) explain how the substantial interests of each person requesting the hearing will be affected by the District’s intended action or proposed action, (2) state all material facts disputed by the person requesting the hearing or state that there are no material facts in dispute, and (3) otherwise comply with Rules 28-106.201 and 28-106.301, F.A.C. Chapter 28-106, F.A.C., can be viewed at www.flrules.org or at the District’s website at www.WaterMatters.org/permits/ rules.
7. A petition for administrative hearing is deemed filed upon receipt of the complete petition by the District Agency Clerk at the District’s Tampa Service Office during normal business hours, which are 8:00 a.m. to 5:00 p.m., Monday through Friday, excluding District holidays. Filings with the District Agency Clerk may be made by mail, hand-delivery or facsimile transfer (fax). The District does not accept petitions for administrative hearing by electronic mail. Mailed filings must be addressed to, and hand-delivered filings must be delivered to, the Agency Clerk, Southwest Florida Water Management District, 7601 US Hwy 301, Tampa, FL 33637-6759. Faxed filings must be transmitted to the District Agency Clerk at (813) 367-9776. Any petition not received during normal business hours shall be filed as of 8:00 a.m. on the next business day. The District's acceptance of faxed petitions for filing is subject to certain conditions set forth in the District's Statement of Agency Organization and Operation, available for viewing at www.WaterMatters.org/about.
Judicial Review
1. Pursuant to Sections 120.60(3) and 120.68, F.S., a party who is adversely affected by District action may seek judicial review of the District's action.Judicial review shall be sought in the Fifth District Court of Appeal or in the appellate district where a party resides or as otherwise provided by law.
2. All proceedings shall be instituted by filing an original notice of appeal with the District Agency Clerk within 30 days after the rendition of the order being appealed, and a copy of the notice of appeal, accompanied by any filing fees prescribed by law, with the clerk of the court, in accordance with Rules
9.110 and 9.190 of the Florida Rules of Appellate Procedure (Fla. R. App. P.). Pursuant to Fla. R. App.
P. 9.020(h), an order is rendered when a signed written order is filed with the clerk of the lower tribunal.
File details come from the government source that posted it. Updated .