This document is a Schedule of Bid Quantities for the City of Huntsville's Periodic Bid for Asphalt and Construction Projects (Project #79-2025-55), issued on August 20, 2025. The bid covers a comprehensive range of construction and infrastructure services including asphalt work, concrete improvements, traffic installations, and miscellaneous construction activities. The project encompasses various specific tasks such as asphalt layering (with 15% RAP), milling, manhole adjustments, concrete driveway and sidewalk replacements, handicap ramp installations, traffic calming features like speed tables, and miscellaneous stone backfill. Quantities range from 5 to 23,000 units across different line items, with work focused on road and infrastructure restoration and improvement.
The bid schedule indicates that all pricing is to be considered "in-place" and includes all labor, equipment, materials, and removal requirements. Notably, all prices are currently listed at $0.00, suggesting this is a preliminary or template bidding document. The project includes specific technical requirements such as limestone road edge lining, base failure remediation, and ADA compliance for concrete and ramp installations. Mobilization costs are structured with graduated pricing based on project value ranges from $5,000 to $250,000, providing flexibility for different project scales. The document appears to be a comprehensive bid template for infrastructure and construction work within the Huntsville municipal area, allowing for various types of road, sidewalk, and traffic infrastructure projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum.pdf | ||
| Project Manual - Periodic Bid for Asphalt _ Construction Projects.pdf | ||
| App C Supplement - Schedule of Bid Quantities - Revised 08.21.2025.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Periodic Bid for Asphalt and Construction Projects 2025 |
| Project #79-2025-55 |
| Issued: August 20, 2025 |
| ASPHALT | ||||
| All roads that are limestone will be edge lined and tie in milled. All roads with brown mix will be completely milled. All asphalt will be considered complete when site is restored. All base failures will be dug/milled out 6-8" deep and backfilled with binder at the discretion of the onsite inspector. Further subgrade work will also be determined at the time of construction by the onsite inspector. There will be no separate pay item for excavating the base failure. | ||||
| 1 | 424A 1/2" Mix Wearing Surface Layer in Place (15% RAP after cleaning and tacking) 1" to 1/12" Thick | 23000 | TON | $0.00 |
2 414B 3/4" Mix (Leveling) Layer in Place (15% RAP after cleaning and tacking) 400 TON $0.00
3 420A-Open Grade Friction Course in Place (15% Rap after cleaning and tacking) 1" to 1 1/2" Thick 1500 TON $0.00
4 414B 1" Mix Binder (Base Failure) Layer in Place (15%RAP) 7500 TON $0.00
5 414B 1" Mix Binder (Binder Layer) Layer in Place (15% RAP) 6500 TON $0.00
6 Milling 0-2" Total Mill 250000 SY $0.00
7 Milling 2-4" Total Mill 2000 SY $0.00
8 Manhole Riser 25 EA $0.00
9 Manhole Adjustment 25 EA $0.00
| CONCRETE | ||||
| All concrete work will be considered complete when site is restored to like conditions. All pour in place elements include all items shown on the standard drawing. Removal is included in all pricing. Landscaping is included in all pricing. | ||||
| 10 | Remove and Replace Concrete Driveway Apron (MEET ADA COMPLIANCE) | 200 | SY | $0.00 |
11 Remove and Replace Concrete Sidewalk (MEET ADA COMPLIANCE) (5' WIDE) 300 LF $0.00
12 Remove and Replace Concrete Crossdrain (MEET ADA COMPLIANCE) 100 SY $0.00
13 Remove and Replace Curb and Gutter (MEET ADA COMPLIANCE) 400 LF $0.00
14 Handicap Ramps With ADA Detectable Warning Pavers (All Widths) TY1 Parallel Corner (ALDOT Drawing SW-618 Index #735) 15 EA $0.00
15 Handicap Ramps With ADA Detectable Warning Pavers (All Widths) TY1A Parallel Corner (ALDOT Drawing SW-618 Index #735) 15 EA $0.00
16 Handicap Ramps With ADA Detectable Warning Pavers (All Widths) TY2 Parallel Midblock (ALDOT Drawing SW-618 Index #736) 20 EA $0.00
17 Handicap Ramps With ADA Detectable Warning Pavers (All Widths) TY2A Parallel Midblock (ALDOT Drawing SW-618 Index #736) 20 EA $0.00
18 Handicap Ramps With ADA Detectable Warning Pavers (All Widths) TY2 Blended Corner(ALDOT Drawing SW-618 Index #735) 5 EA $0.00
19 Handicap Ramps With ADA Detectable Warning Pavers (All Widths) TY1 Perpendicular Midblock (ALDOT Drawing SW-618 Index #735) 20 EA $0.00
20 Handicap Ramps With ADA Detectable Warning Pavers (All Widths) TY3 Combination Midblock (ALDOT Drawing SW-618 Index #736) 10 EA $0.00
21 Unreinforced Concrete (Forming, pouring, finishing, complete in place.) 100 CY $0.00
22 Reinforced Concrete (Forming, steel, pouring, finishing, complete in place.) 650 CY $0.00
23 Concrete Flume COH Standard DR-161 200 SY $0.00
24 Reinforced Concrete Slope Paving with 4" Thick Gravel Base. COH Standard DR-164 A, B, C, D, E. 200 SY $0.00
25 Concrete Box Culvert and Wing Walls. 100 CY $0.00
26 Inlet Top Single Wing "S" Type 25 EA $0.00
27 Inlet Top Double Wing "S" Type 25 EA $0.00
| TRAFFIC | ||||
| 28 | Install 22" Flat Topped Speed Table | 30 | EA | $0.00 |
29 Speed Cushions/Removal Only 30 EA $0.00
30 Delineators 100 EA $0.00
31 Q Loops 30 EA $0.00
32 D Loops 30 EA $0.00
33 Bike Loops 5 EA $0.00
| MOBILIZATION | ||||
| 34 | Contract Mobilization, (3% of the total cost of the workorder adjusted for final quantities). | 1 | EA | $0.00 |
35 Project Mobilization C (will be paid on projects that have a cost of $5000 but less than $10,000) 5 EA $0.00
36 Project Mobilization D (will be paid on projects that have a cost of $10,000 but less than $25,000) 5 EA $0.00
37 Project Mobilization E (will be paid on projects that have a cost of $25,000 but less than $50,000) 25 EA $0.00
38 Project Mobilization F (will be paid on projects that have a cost of $50,000 but less than $75,000) 5 EA $0.00
39 Project Mobilization G (will be paid on projects that have a cost of $75,000 but less than $100,000) 5 EA $0.00
40 Project Mobilization H (will be paid on projects that have a cost of $100,000 but less than $250,000) 5 EA $0.00
| MISCELLANEOUS | ||||
| 41 | Miscellaneous Stone Backfill (Any Size) In Place Measurement | 500 | CY | $0.00 |
42 Historical District Sidewalk (See Brick Detail) 1500 LF $0.00
43 NO2. Crushed Stone 0-6" 850 TON $0.00
| TOTAL BASE BID | $0.00 | |
| ALL ITEMS SHALL BE CONSIDERED IN-PLACE. PRICES SHALL INCLUDE ALL LABOR, EQUIPMENT,MATERIALS, AND REMOVALS AS REQUIRED FOR CONSTRUCTION OF THE REQUIRED WORK. | ||