This is a construction contract template issued by the City of Long Beach, California, through the Office of the City Attorney. The contract establishes the terms and conditions between the City of Long Beach and a contractor for the performance of public works construction. The contract requires the contractor to furnish all necessary labor, supervision, tools, materials, supplies, appliances, equipment, and transportation to complete work according to Project Plans and Specifications. The contractor shall commence work on a date specified in a written Notice to Proceed from the City and must complete all work within a timeframe designated in the contract (measured in working or calendar days), subject to strikes, lockouts, and events beyond the contractor's control. Time is deemed essential to the contract, and the contractor is subject to liquidated damages if work is not completed within the stated period. The contract incorporates by reference the Standard Specifications for Public Works Construction (Greenbook), City of Long Beach Standard Plans, project drawings, California Code of Regulations, Uniform Codes, prevailing wage rates, Instructions to Bidders, bid security, the City's Disadvantaged, Minority and Women-Owned Business Enterprise Program, and various bonds and insurance requirements.
Compensation to the contractor is based on the amounts identified in the contractor's bid, attached as Exhibit A, with a maximum cumulative amount not to exceed the contract price specified in the bid. Progress payments are made in accordance with Section 9 of the Greenbook. The contractor must comply with prevailing wage requirements under California Labor Code and shall post prevailing wage rate determinations at the job site. The contractor is required to maintain certified payroll records on a monthly basis for itself and all subcontractors, with records retained for at least three years after project completion. The contractor must obtain workers' compensation insurance, provide proof of all required insurance prior to commencing work, and submit an Information Sheet to comply with Labor Code Section 2810. The contractor is responsible for all loss or damage to the work not covered by collectible commercial insurance, excluding losses caused by earthquake, flood, or City negligence. The contract includes requirements for Department of Industrial Relations compliance, apprenticeship compliance, and registration to perform public work pursuant to Labor Code Section 1725.5. The contractor must comply with prevailing wage rates, the Equal Benefits Ordinance, and nondiscrimination requirements, and failure to comply with these provisions constitutes material breach.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Contract.docx (Revised 01-13-2022
O F
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N E
Y
D A
W N
M C
IN
T
O S
H C it y A tt o rn e y
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4
C O N T R A C T
THIS CONTRACT is made and entered, in duplicate, as of ________, 20__ for reference purposes only, pursuant to a minute order adopted by the City Council of the
City of Long Beach at its meeting held on _________, 20__, by and between
________________________, a California corporation/partnership/limited liability company (“Contractor”), whose address is
______________________________________, and the CITY OF LONG BEACH, a municipal corporation (“City”).
WHEREAS, pursuant to a Notice Inviting Bids for ___________________ in the City of Long Beach, California, dated __________, 20__, and published by City, bids were received, publicly opened and declared on the date specified in said Notice; and
WHEREAS, the City Manager accepted the bid of Contractor; and
WHEREAS, the City Council authorized the City Manager to enter a contract with Contractor for the work described in Project Plans and Specifications No. R-____;
NOW, THEREFORE, in consideration of the mutual terms and conditions herein, the parties agree as follows:
1. SCOPE OF WORK. Contractor shall furnish all necessary labor, supervision, tools, materials, supplies, appliances, equipment and transportation for the work described in Project Plans and Specifications No. R-____ for __________________ in the City of Long Beach, California, said work to be performed according to the Contract
Documents identified below. However, this Contract is intended to provide to City complete and finished work and, to that end, Contractor shall do everything necessary to complete the work, whether or not specifically described in the Contract Documents.
2. PRICE AND PAYMENT.
A. City shall pay to Contractor the amount(s) for materials and work identified in Contractor’s Bid for __________________________ in the City of
Long Beach, California, attached hereto as Exhibit “A”; provided, however, that the
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4 total compensation to Contractor shall not exceed the maximum cumulative amount of ________ Dollars ($_______________) for the estimated quantities established in the Bid, subject to additions or deductions as provided in the Contract Documents.
B. Contractor shall submit requests for progress payments and
City will make payments in due course of payments in accordance with Section 9 of the Standard Specifications for Public Works Construction (latest edition) (the
“Greenbook”).
3. CONTRACT DOCUMENTS.
A. The Contract Documents include: The Notice Inviting Bids, Project Specifications No. R-____ (which may include by reference the Standard
Specifications for Public Works Construction, latest edition, and any supplements thereto, collectively the “Standard Specifications”); the City of Long Beach Standard
Plans; Project Drawing No. ______ for this work; the California Code of Regulations;
the various Uniform Codes applicable to trades; the prevailing wage rates;
Instructions to Bidders; the Bid; the bid security; the City of Long Beach
Disadvantaged, Minority and Women-Owned Business Enterprise Program; this
Contract and all documents attached hereto or referenced herein including but not limited to insurance; Bond for Faithful Performance; Payment Bond; Notice to
Proceed; Notice of Completion; any addenda or change orders issued in accordance with the Standard Specifications; any permits required and issued for the work; approved final design drawings and documents; and the Information
Sheet (“Contract Documents”). These Contract Documents are incorporated herein by the above reference and form a part of this Contract.
B. Notwithstanding Section 2-5.2 of the Standard Specifications, if any conflict or inconsistency exists or develops among or between Contract
Documents, the following priority shall govern: 1) Permit(s) from other public agencies; 2) Change Orders; 3) this Contract (including any and all amendments hereto); 4) Addenda (which shall include written clarifications, corrections and
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4 changes to the bid documents and other types of written notices issued prior to bid opening; 5) Project Specifications; 6) Project Plans (including drawings); 7) the City of Long Beach Standard Plans; 8) Standard Specifications (as identified in Section
3.A. of the Greenbook); 9) other reference specifications; 10) other reference plans; 11) the Bid; and 12) the Notice Inviting Bids.
4. TIME FOR CONTRACT. Contractor shall commence work on a date to be specified in a written Notice to Proceed from City and shall complete all work within
____________ (___) working/calendar days thereafter, subject to strikes, lockouts and events beyond the control of Contractor. Time is of the essence hereunder. City will suffer damage if the work is not completed within the time stated, but those damages would be difficult or impractical to determine. So, Contractor shall pay to City, as liquidated damages, the amount stated in the Contract Documents.
5. ACCEPTANCE OF WORK NOT TO CONSTITUTE A WAIVER. The acceptance of any work or the payment of any money by City shall not operate as a waiver of any provision of any Contract Document, of any power reserved to City, or of any right to damages or indemnity hereunder. The waiver of any breach or any default hereunder shall not be deemed a waiver of any other or subsequent breach or default.
6. WORKERS' COMPENSATION CERTIFICATION. Concurrently herewith, Contractor shall submit certification of Workers' Compensation coverage in accordance with California Labor Code Sections 1860 and 3700, a copy of which is attached hereto as Exhibit “B”.
7. CLAIMS FOR EXTRA WORK. No claim shall be made at any time upon City by Contractor for and on account of any extra or additional work performed or materials furnished, unless such extra or additional work or materials shall have been expressly required by the City Manager and the quantities and price thereof shall have been first agreed upon, in writing, by the parties hereto.
8. CLAIMS. Contractor shall, upon completion of the work, deliver possession thereof to City ready for use and free and discharged from all claims for labor
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4 and materials in doing the work and shall assume and be responsible for, and shall protect, defend, indemnify and hold harmless City from and against any and all claims, demands, causes of action, liability, loss, costs or expenses for injuries to or death of persons, or damages to property, including property of City, which arises from or is connected with the performance of the work.
9. INSURANCE. Prior to commencement of work, and as a condition precedent to the effectiveness of this Contract, Contractor shall provide to City evidence of all insurance required in the Contract Documents.
In addition, Contractor shall complete and deliver to City the form
(“Information Sheet”) attached as Exhibit “C” and incorporated by reference, to comply with
Labor Code Section 2810.
10. WORK DAY. Contractor shall comply with Sections 1810 through
1815 of the California Labor Code regarding hours of work. Contractor shall forfeit, as a penalty to City, the sum of Twenty-Five Dollars ($25.00) for each worker employed by
Contractor or any subcontractor for each calendar day such worker is required or permitted to work more than eight (8) hours unless that worker receives compensation in accordance with Section 1815.
11. PREVAILING WAGE RATES. Contractor is directed to pay the general rate of per diem wages for each craft, classification, or type of worker needed to execute the contract (prevailing wage rates). Copies of the current prevailing rate of per diem wages are on file at its principal office (Labor Compliance Division, 411 W. Ocean
Boulevard, 6th Floor, Long Beach, California, 90802), and shall be made available to any interested party upon request. Contractor is required to post a copy of the determination of the director of the prevailing rate of per diem wages at each job site. Pursuant to Section
1775, Contractor shall forfeit, as a penalty to the City, up to Two Hundred Dollars ($200) for each laborer, worker or mechanic employed for each calendar day, or portion thereof, that such laborer, worker or mechanic is paid less than the prevailing wage rates for any work done by Contractor, or any subcontractor, under this Contract. The difference
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4 between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the Contractor or subcontractor.
12. DEPARTMENT OF INDUSTRIAL RELATIONS COMPLIANCE.
Contractor is advised that this work constitutes a public work of improvement subject to
California Labor Code Division 2, Part 7, Chapter 1, Articles 1-5, §§1720-1861. Pursuant to Labor Code Section 1771.1. Contractor or subcontractors shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public contract Code, or engage in the performance of any contract for public work, as defined in the California Labor Code, unless currently registered and qualified to perform public work pursuant to Section 1725.5. Contract (or associated subcontracts) shall not be entered into without proof of the Contractor’s (or subcontractor’s) current registration to perform public work pursuant to Section 1725.5. All work conducted in support of this public work of improvement is subject to compliance monitoring and enforcement by the Department of
Industrial Relations. Contractor will abide by all applicable apprenticeship requirements in the California Labor Code Section 1777.5 and will be responsible for subcontractor apprenticeship compliance to the same.
13. CERTIFIED PAYROLL RECORDS.
A. Pursuant to the provisions of Labor Code Section 1776, Contractor shall keep and shall cause each subcontractor performing any portion of the work under this Contract to keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or subcontractor in connection with the work. Such payroll records for Contractor and all subcontractors shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor pursuant to the provisions of
Section 1776 of the Labor Code. Contractor's failure to furnish such records to City
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4 or City’s authorized Labor Compliance representative in the manner provided herein for notices shall entitle City to withhold the penalty prescribed by law from progress payments due to Contractor.
B. Contractor shall submit to the City certified payroll records for
Contractor and all subcontractors performing any portion of the work under this
Contract on a monthly basis. Certified payroll records for Contractor and all subcontractors shall be maintained during the course of the work and shall be kept by Contractor for at least three (3) years after completion of the work.
C. The foregoing is in addition to, and not in lieu of, any other requirements or obligations established and imposed by any department of the City with regard to submission and retention of certified payroll records for Contractor and subcontractors.
14. COORDINATION WITH GOVERNMENTAL REGULATIONS.
A. If the work is terminated pursuant to an order of any Federal or
State authority, Contractor shall accept as full and complete compensation under this Contract such amount of money as will equal the product of multiplying the
Contract price stated herein by the percentage of work completed by Contractor as of the date of such termination, and for which Contractor has not been paid. If the work is so terminated, the City Engineer, after consultation with Contractor, shall determine the percentage of work completed and the determination of the City
Engineer shall be final.
B. If Contractor is prevented, in any manner, from strict compliance with the Plans and Specifications due to any Federal or State law, rule or regulation, in addition to all other rights and remedies reserved to the parties City may by resolution of the City Council suspend performance hereunder until the cause of disability is removed, extend the time for performance, make changes in the character of the work or materials, or terminate this Contract without liability to either party.
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4
15. NOTICES.
A. Any notice required hereunder shall be in writing and personally delivered or deposited in the U.S. Postal Service, first class, postage prepaid, to
Contractor at the address first stated herein, and to the City at 411 West Ocean
Boulevard, Long Beach, California 90802, Attn: City Manager. Notice of change of address shall be given in the same manner as stated herein for other notices. Notice shall be deemed given on the date deposited in the mail or on the date personal delivery is made, whichever first occurs.
B. Except for stop notices and claims made under the Labor Code, City will notify Contractor when City receives any third party claims relating to this
Contract in accordance with Section 9201 of the Public Contract Code.
16. BONDS. Contractor shall, simultaneously with the execution of this
Contract, execute and deliver to City a good and sufficient corporate surety bond, in the form attached hereto and in the amount specified therein, conditioned upon the faithful performance of this Contract by Contractor, and a good and sufficient corporate surety bond, in the form attached hereto and in the amount specified therein, conditioned upon the payment of all labor and material claims incurred in connection with this Contract.
17. COVENANT AGAINST ASSIGNMENT. Neither this Contract nor any of the moneys that may become due Contractor hereunder may be assigned by Contractor without the written consent of City first had and obtained, nor will City recognize any subcontractor as such, and all persons engaged in the work of construction will be considered as independent contractors or agents of Contractor and will be held directly responsible to Contractor.
18. RESPONSIBILITY OF CONTRACTOR. Notwithstanding anything to the contrary in the Standard Specifications, Contractor shall have the responsibility, care and custody of the work. If any loss or damage occurs to the work that is not covered by collectible commercial insurance, excluding loss or damage caused by earthquake or flood or the negligence or willful misconduct of City, then Contractor shall immediately make the
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4
City whole for any such loss or pay for any damage. If Contractor fails or refuses to make the City whole or pay, then City may do so and the cost and expense of doing so shall be deducted from the amount due Contractor from City hereunder.
19. CONTINUATION. Termination or expiration of this Contract shall not terminate the rights or liabilities of either party which rights or liabilities accrued or existed prior to termination or expiration of this Contract.
20. TAXES AND TAX REPORTING.
A. As required by federal and state law, City is obligated to and will report the payment of compensation to Contractor on Form 1099-Misc.
Contractor shall be solely responsible for payment of all federal and state taxes resulting from payments under this Contract. Contractor shall submit Contractor’s
Employer Identification Number (EIN), or Contractor’s Social Security Number if
Contractor does not have an EIN, in writing to City’s Accounts Payable, Department of Financial Management. Contractor acknowledges and agrees that City has no obligation to pay Contractor until Contractor provides one of these numbers.
B. Contractor shall cooperate with City in all matters relating to taxation and the collection of taxes, particularly with respect to the self-accrual of use tax. Contractor shall cooperate as follows: (i) for all leases and purchases of materials, equipment, supplies, or other tangible personal property totaling over One
Hundred Thousand Dollars ($100,000.00) shipped from outside California, a qualified Contractor shall complete and submit to the appropriate governmental entity the form in Appendix “A” attached hereto; and (ii) for construction contracts and subcontracts totaling Five Million Dollars ($5,000,000.00) or more, Contractor shall obtain a sub-permit from the California Department of Tax and Fee
Administration (“CFTA”) for the Work site. “Qualified” means that the Contractor purchased at least Five Hundred Thousand Dollars ($500,000.00) in tangible personal property that was subject to sales or use tax in the previous calendar year.
C. Contractor shall create and operate a buying company, as
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4 defined in CFTA Regulation 1699, subpart (i), in City if Contractor will purchase over
Five Million Dollars ($5,000,000.00) in tangible personal property subject to
California sales and use tax.
D. In completing the form and obtaining the permit(s), Contractor shall use the address of the Work site as its business address and may use any address for its mailing address. Copies of the form and permit(s) shall also be delivered to the City Engineer. The form must be submitted and the permit(s) obtained as soon as Contractor receives a Notice to Proceed. Contractor shall not order any materials or equipment over One Hundred Thousand Dollars
($100,000.00) from vendors outside California until the form is submitted and the permit(s) obtained and, if Contractor does so, it shall be a material breach of this
Contract. In addition, Contractor shall make all purchases from the Long Beach sales office of its vendors if those vendors have a Long Beach office and all purchases made by Contractor under this Contract which are subject to use tax of
Five Hundred Thousand Dollars ($500,000.00) or more shall be allocated to the City of Long Beach. Contractor shall require the same cooperation with City, with regards to subsections B, C and D under this section (including forms and permits), from its subcontractors and any other subcontractors who work directly or indirectly under the overall authority of this Contract.
E. Contractor shall not be entitled to and by signing this Contract waives any claim or damages for delay against City if Contractor does not timely submit these forms to the appropriate governmental entity. Contractor may request a waiver to subsections B, C, and/or D. Waiver requests must be submitted in writing and will be subject to City review and approval. Contractor may contact the Financial
Management Department, Budget Management Bureau at (562) 570-6425 for assistance with the form.
21. ADVERTISING. Contractor shall not use the name of City, its officials or employees in any advertising or solicitation for business, nor as a reference, without the
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4 prior approval of the City Manager, City Engineer or designee.
22. AUDIT. City shall have the right at all reasonable times during performance of the work under this Contract for a period of five (5) years after final completion of the work to examine, audit, inspect, review, extract information from and copy all books, records, accounts and other documents of Contractor relating to this
Contract.
23. NO PECULIAR RISK. Contractor acknowledges and agrees that the work to be performed hereunder does not constitute a peculiar risk of bodily harm and that no special precautions are required to perform said work.
24. THIRD PARTY BENEFICIARY. This Contract is intended by the parties to benefit themselves only and is not in any way intended or designed to or entered for the purpose of creating any benefit or right of any kind for any person or entity that is not a party to this Contract.
25. SUBCONTRACTORS. Contractor agrees to and shall bind every subcontractor to the terms of this Contract; provided, however, that nothing herein shall create any obligation on the part of City to pay any subcontractor except in accordance with a court order in an action to foreclose a stop notice. Failure of Contractor to comply with this Section shall be deemed a material breach of this Contract. A list of subcontractor(s) submitted by Contractor in compliance with Public Contract Code
Sections 4100 et seq. is attached hereto as Exhibit “D” and incorporated herein by this reference.
26. NO DUTY TO INSPECT. No language in this Contract shall create and City shall not have any duty to inspect, correct, warn of or investigate any condition arising from Contractor's work hereunder, or to insure compliance with laws, rules or regulations relating to said work. If City does inspect or investigate, the results thereof shall not be deemed compliance with or a waiver of any requirements of the Contract
Documents.
27. GOVERNING LAW. This Contract shall be governed by and
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4 construed pursuant to the laws of the State of California (except those provisions of
California law pertaining to conflicts of laws).
28. INTEGRATION. This Contract, including the Contract Documents identified in Section 3 hereof, constitutes the entire understanding between the parties and supersedes all other agreements, oral or written, with respect to the subject matter herein.
29. NONDISCRIMINATION. In connection with performance of this
Contract and subject to federal laws, rules and regulations, Contractor shall not discriminate in employment or in the performance of this Contract on the basis of race, religion, national origin, color, age, sex, sexual orientation, gender identity, AIDS, HIV status, handicap or disability. It is the policy of the City to encourage the participation of
Disadvantaged, Minority and Women-Owned Business Enterprises, and the City encourages Contractor to use its best efforts to carry out this policy in the award of all subcontracts.
30. EQUAL BENEFITS ORDINANCE. Unless otherwise exempted in accordance with the provisions of the Ordinance, this Contract is subject to the applicable provisions of the Equal Benefits Ordinance (“EBO”), section 2.73 et seq. of the Long Beach
Municipal Code, as amended from time to time.
A. During the performance of this Contract, the Contractor certifies and represents that the Contractor will comply with the EBO. The Contractor agrees to post the following statement in conspicuous places at its place of business available to employees and applicants for employment:
“During the performance of a Contract with the City of Long Beach, the
Contractor will provide equal benefits to employees with spouses and its employees with domestic partners. Additional information about the City of
Long Beach’s Equal Benefits Ordinance may be obtained from the City of
Long Beach Business Services Division at 562-570-6200.”
B. The failure of the Contractor to comply with the EBO will be deemed to be a material breach of the Contract by the City.
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4
C. If the Contractor fails to comply with the EBO, the City may cancel, terminate or suspend the Contract, in whole or in part, and monies due or to become due under the Contract may be retained by the City. The City may also pursue any and all other remedies at law or in equity for any breach.
D. Failure to comply with the EBO may be used as evidence against the Contractor in actions taken pursuant to the provisions of Long Beach
Municipal Code 2.93 et seq., Contractor Responsibility.
E. If the City determines that the Contractor has set up or used its contracting entity for the purpose of evading the intent of the EBO, the City may terminate the Contract on behalf of the City. Violation of this provision may be used as evidence against the Contractor in actions taken pursuant to the provisions of
Long Beach Municipal Code section 2.93 et seq., Contractor Responsibility.
31. DEFAULT. Default shall include but not be limited to Contractor's failure to perform in accordance with the Plans and Specifications, failure to comply with any Contract Document, failure to pay any penalties, fines or charges assessed against
Contractor by any public agency, failure to pay any charges or fees for services performed by the City, and if Contractor has substituted any security in lieu of retention, then default shall also include City's receipt of a stop notice. If default occurs and Contractor has substituted any security in lieu of retention, then in addition to City's other legal remedies, City shall have the right to draw on the security in accordance with Public Contract Code
Section 22300 and without further notice to Contractor. If default occurs and Contractor has not substituted any security in lieu of retention, then City shall have all legal remedies available to it.
IN WITNESS WHEREOF, the parties have caused this document to be duly executed with all formalities required by law as of the date first stated above.
(company), a corporation
_________________________, 20__ By________________________________ Name_____________________________
(Revised 01-13-2022
F
IC
E O
F T
H E
C
IT
Y A
T T
O R
N
W N
M C
IN
T
O S
H C it y A tt o rn
W e s t O c e a n
B o u le v a rd th F lo o r
L o n g
B e a c h
C
A
-4
Title_______________________________
Name_____________________________ Title_______________________________
“Contractor”
CITY OF LONG BEACH, a municipal corporation
City Manager
“City”
This Contract is approved as to form on ______________________, 20__.
DAWN MCINTOSH, City Attorney
By _________________________________
Deputy