J.8 Cost Breakdown Template.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- Congressional Cable TV System Assessment
- Solicitation number
- AOCSSB26R0050
- Issued by
-
Architect of the Capitol
About this file
This is a Cost Breakdown Template in Microsoft Excel format required for submission with proposals to the Architect of the Capitol (AOC) for solicitation AOCSSB26R0050, the Congressional Cable TV System Assessment contract.
The template is structured to capture detailed cost breakdowns across three separate tasks, with each task section requiring offerors to itemize Direct Labor (using burdened rates by labor category), Other Direct Costs (ODCs), Equipment Purchases, Required Travel, Material/Supplies, and Software Purchases. Specific labor categories identified in the template include Lead IPTV Network Engineer, Senior Broadcast Technician, and Project Manager or Technical Writer. The template requires entries for hours and rates for labor; number of trips and price per trip for travel; and quantity and unit price for equipment, materials, and software line items. An IGCE Summary Breakdown section at the top consolidates the total costs for all three tasks. This standardized template was incorporated via Amendment 002 to supersede the previous requirement allowing offerors to submit cost breakdowns in any Microsoft Excel format, establishing consistency in proposal evaluation for this Firm Fixed Price contract with a 180-calendar-day period of performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AOCSSB26R0050-A002 - SF-33.pdf | ||
| J.1 CCTV System Assessment SOW_v1.pdf | ||
| J.2 Pricing Sheet -Sec B_v1.xlsx | XLSX spreadsheet | |
| J.7 CCTS_System_Assessment_equipment_list.xlsx | XLSX spreadsheet | |
| AOCSSB26R0050-A001 - SF-33.pdf | ||
| Site Visit Agenda-AOCSSB26R0050_v1.pdf | ||
| J.3 Instructions to Offerors and Basis for Award_v1.pdf | ||
| J.4 Offeror Questions Template_v1.pdf | ||
| J.1 CCTV System Assessment SOW.pdf | ||
| J.3 Instructions to Offerors and Basis for Award.pdf | ||
| J.5 CP-491 Criminal History.pdf | ||
| J.6 EEO (Poster).pdf | ||
| J.2 Pricing Sheet -Sec B.xlsx | XLSX spreadsheet | |
| AOCSSB26R0050.pdf | ||
| J.4 Offeror Questions Template.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE Summary
| Breakdown Summary | |
| Task 1 | $ - 0 |
| Task 2 | $ - 0 |
| Task 3 | $ - 0 |
TOTAL $ - 0
Task 1 Breakdown (Task 1)
DIRECT LABOR (BURDENED RATES) OTHER DIRECT COST EQUIPMENT PURCHASES
| Labor Category | Hours | Rate | Amount | REQUIRED TRAVEL: (Not-to-Exceed Amount Worse Case) | ||||||||||
| Travel (To/From) | No. of Trips | Price Per Trip | Total | Item Description | Quantity | Unit Price | Total | |||||||
| 1 | LEAD IPTV NETWORK ENGINEER | $ - 0 | $ - 0 | |||||||||||
| 2 | SENIOR BROADCAST TECHNICAN | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||||
| 3 | PROJECT MANAGER OR TECHNICAL WRITER | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | |||||
| 4 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | ||||||
| 5 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | ||||||
| 6 | $ - 0 | $ - 0 | Total ODCs | $ - 0 | Total Equipment | $ - 0 | ||||||||
| 7 | $ - 0 | $ - 0 | ||||||||||||
| 8 | $ - 0 | $ - 0 | MATERIAL/SUPPLIES: (List Below) | SOFTWARE PURCHASES | ||||||||||
| 9 | $ - 0 | $ - 0 | ||||||||||||
| 10 | $ - 0 | $ - 0 | Item Description | Quantity | Unit Price | Total | Item Description | Quantity | Unit Price | Total | ||||
| 11 | $ - 0 | $ - 0 | ||||||||||||
| 12 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | ||||||
| 13 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | ||||||
| 14 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | ||||||
| 15 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | ||||||
| 16 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | ||||||
| 17 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | ||||||
| Total Direct Labor | $ - 0 | Total Materials | $ - 0 | Total Software | $ - 0 |
Total Breakdown 1 $ - 0
Task 2 Breakdown (Task 2)
DIRECT LABOR (BURDENED RATES) OTHER DIRECT COST EQUIPMENT PURCHASES
| Labor Category | Hours | Rate | Amount | REQUIRED TRAVEL: (Not-to-Exceed Amount Worse Case) | ||||||||||
| Travel (To/From) | No. of Trips | Price Per Trip | Total | Item Description | Quantity | Unit Price | Total | |||||||
| 1 | LEAD IPTV NETWORK ENGINEER | $ - 0 | $ - 0 | |||||||||||
| 2 | SENIOR BROADCAST TECHNICAN | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||||
| 3 | PROJECT MANAGER OR TECHNICAL WRITER | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | |||||
| 4 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | ||||||
| 5 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | ||||||
| 6 | $ - 0 | $ - 0 | Total ODCs | $ - 0 | Total Equipment | $ - 0 | ||||||||
| 7 | $ - 0 | $ - 0 | ||||||||||||
| 8 | $ - 0 | $ - 0 | MATERIAL/SUPPLIES: (List Below) | SOFTWARE PURCHASES | ||||||||||
| 9 | $ - 0 | $ - 0 | ||||||||||||
| 10 | $ - 0 | $ - 0 | Item Description | Quantity | Unit Price | Total | Item Description | Quantity | Unit Price | Total | ||||
| 11 | $ - 0 | $ - 0 | ||||||||||||
| 12 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | ||||||
| 13 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | ||||||
| 14 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | ||||||
| 15 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | ||||||
| 16 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | ||||||
| 17 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | ||||||
| Total Direct Labor | $ - 0 | Total Materials | $ - 0 | Total Software | $ - 0 |
Total Breakdown 2 $ - 0
Task 3 Breakdown (Task 3)
DIRECT LABOR (BURDENED RATES) OTHER DIRECT COST EQUIPMENT PURCHASES
| Labor Category | Hours | Rate | Amount | REQUIRED TRAVEL: (Not-to-Exceed Amount Worse Case) | ||||||||||
| Travel (To/From) | No. of Trips | Price Per Trip | Total | Item Description | Quantity | Unit Price | Total | |||||||
| 1 | LEAD IPTV NETWORK ENGINEER | $ - 0 | $ - 0 | |||||||||||
| 2 | SENIOR BROADCAST TECHNICAN | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||||
| 3 | PROJECT MANAGER OR TECHNICAL WRITER | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | |||||
| 4 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | ||||||
| 5 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | ||||||
| 6 | $ - 0 | $ - 0 | Total ODCs | $ - 0 | Total Equipment | $ - 0 | ||||||||
| 7 | $ - 0 | $ - 0 | ||||||||||||
| 8 | $ - 0 | $ - 0 | MATERIAL/SUPPLIES: (List Below) | SOFTWARE PURCHASES | ||||||||||
| 9 | $ - 0 | $ - 0 | ||||||||||||
| 10 | $ - 0 | $ - 0 | Item Description | Quantity | Unit Price | Total | Item Description | Quantity | Unit Price | Total | ||||
| 11 | $ - 0 | $ - 0 | ||||||||||||
| 12 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | ||||||
| 13 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | 2 | $ - 0 | $ - 0 | ||||||
| 14 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | 3 | $ - 0 | $ - 0 | ||||||
| 15 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | 4 | $ - 0 | $ - 0 | ||||||
| 16 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | 5 | $ - 0 | $ - 0 | ||||||
| 17 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | 6 | $ - 0 | $ - 0 | ||||||
| Total Direct Labor | $ - 0 | Total Materials | $ - 0 | Total Software | $ - 0 |
Total Breakdown 3 $ - 0
File details come from the government source that posted it. Updated .