J.4 Scrap Metal Pricing Spreadsheet_A02.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Campuswide Scrap Metal Recycling Services
- Solicitation number
- AOCSSB26R0007
- Issued by
-
Architect of the Capitol
About this file
This is a Scrap Metal Pricing Spreadsheet template used as the basis for competitive pricing submissions in the Campuswide Scrap Metal Recycling Services solicitation (AOCSSB26R0007) issued by the Architect of the Capitol (AOC). The spreadsheet establishes the pricing framework for both contractor pick-up and AOC delivery services across multiple scrap metal categories, including #2 Copper, #2 Copper Wire, Brass, Aluminum, Stainless Steel, #2 Ferrous Bundles, Light Iron, and Heavy Steel. Each material type is listed with estimated monthly weights based on historical usage data showing an average of 4 container pickups per month (8,300 lbs average per container) and 12 deliveries per month (3,000 lbs average total weight).
Contractors are required to submit competitive percentage bids against AMM/Chicago benchmark prices for each material category and service type (pick-up versus delivery). The spreadsheet calculates payment prices by multiplying the benchmark price by the contractor's competitive percentage, then projects monthly and annual payments to AOC based on estimated volumes. The grand total of all line items determines the winning bid. The pricing template was revised in Amendment 02 along with the Statement of Work, and responds to questions and clarifications raised during the solicitation period. Proposals were due April 14, 2026 at 3:00 PM ET following the extension granted in Amendment 01.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| ---- |
| Lbs |
| Tons |
Pricing Spreadsheet
| SCRAP METAL PRICING SPREADSHEET (EPA PRICING TEMPLATE) | |||
| Item No. | Material | Action being taken | Monthly Estimated Net Weight based on historical usage |
(Over a recent 6 month period there was an average of 4 container pickups per month with an average container weight of 8,300 lbs. In the same time period the average number of deliveries was 12 with an average total weight of 3,000 lbs.) Pounds (lbs) AMM/Chicago Price (Service Date) Contractor's Competitive Percentages (%)
| (FILL IN BID % HERE in GRAY ) | Calculated Payment Price (Column F x G) | Estimated Monthly Payment to AOC | Estimated Annual Payment to AOC | ||||||
| Example | |||||||||
| 001 | # 2 Copper | Contractor Pick Up | 200 | Lbs | 80% | $0.000 | $0.00 | $0.00 | |
| 002 | # 2 Copper | AOC Delivery | 200 | Lbs | 127% | $0.000 | $0.00 | $0.00 | |
| $0.000 | $0.00 | $0.00 | |||||||
| 001 | # 2 Copper | Contractor Pick Up (Dealer Buying Price) | 200 | Lbs | $0.000 | ||||
| 002 | # 2 Copper | AOC Delivery (Dealer Buying Price ) | 200 | Lbs | $0.000 | ||||
| Lbs | $0.000 | ||||||||
| 003 | # 2 Copper Wire | Contractor Pick Up (Dealer Buying Price) | 500 | Lbs | $0.000 | ||||
| 004 | # 2 Copper Wire | AOC Delivery (Dealer Buying Price) | 500 | Lbs | $0.000 | ||||
| Lbs | $0.000 | ||||||||
| 005 | Brass | Contractor Pick Up (Dealer Buying Price) | 250 | Lbs | $0.000 | ||||
| 006 | Brass | AOC Delivery (Dealer Buying Price) | 250 | Lbs | $0.000 | ||||
| Lbs | $0.000 | ||||||||
| 007 | Aluminum | Contractor Pick Up (Dealer Buying Price) | 1000 | Lbs | $0.000 | ||||
| 008 | Aluminum | AOC Delivery (Dealer Buying Price) | 1000 | Lbs | $0.000 | ||||
| Lbs | $0.000 | ||||||||
| 009 | Stainless Steel | Contractor Pick Up (Consumer Buying Price for shredded Auto scrap) | 2000 | Lbs | $0.000 | ||||
| 010 | Stainless Steel | AOC Delivery (Consumer Buying Price for shredded Auto scrap) | 2000 | Lbs | $0.000 | ||||
| Lbs | $0.000 | ||||||||
| 011 | #2 Ferrous Bundles | Contractor Pick Up (Consumer Buying Price) | 4000 | Lbs | $0.000 | ||||
| 012 | #2 Ferrous Bundles | AOC Delivery (Consumer Buying Price) | 4000 | Lbs | $0.000 | ||||
| Lbs | $0.000 | ||||||||
| 013 | Light Iron | Contractor Pick Up (Dealer Buying Price) | 2000 | Lbs | $0.000 | ||||
| 014 | Light Iron | AOC Delivery (Dealer Buying Price) | 2000 | Lbs | $0.000 | ||||
| Lbs | $0.000 | ||||||||
| 015 | Heavy Steel | Contractor Pick Up (Dealer Buying Price) | 4000 | Lbs | $0.000 | ||||
| 016 | Heavy Steel | AOC Delivery (Dealer Buying Price) | 4000 | Lbs | $0.000 |
| Grand Total | ||
| (This will determine the winning bid) | $0.00 |
Pricing Assumptions
File details come from the government source that posted it. Updated .