AOCSSB21Q0025 SF18.pdf
PDF 201 KB Posted
- Attached to
- Blanket Purchase Agreement for Agency Uniforms
- Solicitation number
- AOCSSB21Q0025
- Issued by
-
Architect of the Capitol
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDEX
1. REQUEST NO.
AOCSSB21Q0025
2. DATE ISSUED
03/03/2021
3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
Architect of the Capitol Acquisition and Material Management Division Ford House Building Room H2-263 2nd and D Streets SW Washington, DC 20515
5a. ISSUED BY 6. DELIVER BY (date) See Lines
7. DELIVERY
OTHER
(See Schedule)X FOB DESTINATION
9. DESTINATION
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
a. NAME OF CONSIGNEENAME Roman Davydov
TELEPHONE NUMBER
AREA CODE
NUMBER
226-5175 Ext.:
8. TO:
b. STREET ADDRESS
c. CITY
a. NAME b. COMPANY
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
03/19/2021 12:00:00
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
See Lines
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations [ ] are [ X ] are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
15. DATE OF
QUOTATION
a. NAME OF QUOTER
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
Document Number: AOCSSB21Q0025 Page 1 of 33
See Statement of Work
Table of Contents
Section Description Page Number
B Supplies or Services and Prices/Costs C Descriptions/Specifications/Statement of Work
AOC.C.1 Statement of Work E Inspection and Acceptance
52.246-2 Inspection of Supplies-Fixed-Price (Aug 1996) 52.246-16 Responsibility for Supplies (Apr 1984) 52.246-6 Inspection-Time-and-Material and Labor-Hour (May 2001)
F Deliveries or Performance 52.211-17 Delivery of Excess Quantities (Sept 1989) 52.247-34 F.o.b. Destination (Nov 1991)
G Contract Administration Data AOC52.201-1 Contracting Officers Authority (Jun 2004) AOC52.201-2 Contracting Officers Representative (COTR) (January 2021) AOC52.204-6 Capitol Complex Conditions Affecting Contractor Operations (May 2008) AOC52.211-1 Key Personnel (January 2021) AOC52.211-2 Approval of Substitute Contractor Personnel (Jun 2004) AOC52.223-5 Special Security Requirements (Feb 2010) AOC52.223-8 Delivery Vehicle Inspection Requirements (November 2018) AOC52.242-2 Contractor Performance Evaluations (Dec 2006)
I Contract Clauses 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.202-1 Definitions (Jun 2020) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.211-5 Material Requirements (Aug 2000) 52.215-8 Order of Precedence - Uniform Contract Format (Oct 1997) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment (Jun 2020) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sept 2016) 52.222-35 Equal Opportunity for Veterans (Jun 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) 52.222-37 Employment Reports on Veterans (Jun 2020) 52.222-50 Combating Trafficking in Persons (Jan 2019) 52.223-6 Drug-Free Workplace (May 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (May 2020) 52.225-1 Buy American-Supplies (May 2014) 52.225-13 Restrictions on Certain Foreign Purchases (June 2008) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-3 Patent Indemnity (Apr 1984) 52.229-3 Federal, State and Local Taxes (Feb 2013) 52.232-11 Extras (Apr 1984) 52.232-23 Assignment of Claims (May 2014) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.242-13 Bankruptcy (July 1995) 52.243-1 Changes-Fixed-Price (Aug 1987) 52.246-23 Limitation of Liability (Feb 1997) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) 52.249-8 Default (Fixed-Price Supply and Service) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Jun 2020) 52.217-8 Option to Extend Services (Nov 1999) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) 52.233-3 Protest after Award (Aug 1996) AOC52.202-1 Definitions (Jun 2004) AOC52.203-1 Advertising/Promotional Materials (Dec 2005) AOC52.203-2 Disclosure of Information to the General Public (January 2021)
Document Number: AOCSSB21Q0025 Page 2 of 33
AOC52.203-4 Dissemination of Contract Information (July 2010) AOC52.204-1 Printed or Copied Double-sided on Recycled Paper (Jun 2004) AOC52.204-4 Personal Identity Verification of Contractor Personnel (E-Verify) (January 2021) AOC52.204-5 System for Award Management (SAM) (February 2016) AOC52.204-7 Executive Orders not Applicable to the AOC (February 2018) AOC52.209-2 Restrictions and Disclosures of Organizational and Personal Conflicts of Interest (Oct 2008) AOC52.215-10 Examination of Records (July 2014) AOC52.222-3 Convict Labor (Jun 2004) AOC52.223-1 Hazardous Material Identification and Material Safety Data - Supplement (Jun 2005) .17 AOC52.223-3 Security Markings (March 2017) AOC52.223-9 Accident Prevention and Safety and Health Programs (Sep 2004) AOC52.223-10 Use of Radiography or other Nuclear Regulatory Commission Licensed Devices and Notice of Radioactive Materials (August 2011) AOC52.223-11 AOC52.223-11, Contract Performance and Reporting Requirements during a Pandemic (January 2021) AOC52.232-1 Payment Requests (January 2021) AOC52.232-6 Payment by Electronic Funds Transfer (March 2012) AOC52.232-7 Discounts (Aug 2004) AOC52.232-12 Assignment - Supplement (January 2021) AOC52.233-1 Disputes (January 2021) AOC52.233-2 Waiver and Release of Claims (February 2015) AOC52.239-1 Protection of AOC Information Technology Systems (March 2018) AOC52.242-4 Stop-Work Order (May 2014) AOC52.245-2 Government-Furnished Property (July 2013) AOC52.246-3 Warranty of Commercial Items (Jun 2004) 52.243-3 Changes-Time-and-Material or Labor-Hours (Sept 2000)
J List of Attachments AOC.J.1 List of Attachments
K Representations, Certifications and Other Statements of Offerors or Respondents 52.203-2 Certificate Of Independent Price Determination (Apr 1985) 52.204-3 Taxpayer Identification (Oct 1998) 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) 52.222-22 Previous Contracts and Compliance Reports (Feb 1999) 52.225-2 Buy American Certificate (May 2014) 52.225-18 Place of Manufacture (Aug 2018) AOC52.204-2 Data Universal Numbering System (Duns) Number (February 2016) AOC52.204-3 Representations and Certifications (Nov 2004) AOC52.209-1 Organizational and Personal Conflicts of Interest (Apr 2010) AOC52.209-3 Company Principals (Oct 2008) AOC52.215-8 Authorized Negotiators (January 2021) AOC52.219-2 AOC52.219-2 Small Business Representations and Certifications (Sep 2008)
L Instructions, Conditions and Notices to Offerors or Respondents 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) AOC52.232-14 Submission of Electronic Funds Transfer Information (March 2012) AOC52.233-5 AOC52.233-5 Service of Protest (January 2021) 52.216-1 Type of Contract (Apr 1984) AOC.L.1 Instructions to Quoters AOC52.206-1 Procurement Authority for the Architect of the Capitol (Sep 2007) AOC52.215-6 Preparation of Offers/Quotations (January 2021) AOC52.215-12 Joint Venture Offeror Requirements (May 2010)
M Evaluation Factors for Award 52.217-5 Evaluation of Options (July 1990) AOC.M.1 Evaluation Factors for Award
Document Number: AOCSSB21Q0025 Page 3 of 33
Section B - Supplies or Services and Prices/Costs
Number Supplies or Services Quantity Unit Unit Price Total ( Inc. disc., tax, and fees)
1 Base 1.000000 YEAR
Period of Performance: 04/29/2021 - 04/28/2022
2 Option 1 1.000000 YEAR
Period of Performance: 04/29/2022 - 04/28/2023
3 Option 2 1.000000 YEAR
Period of Performance: 04/29/2023 - 04/28/2024
4 Option 3 1.000000 YEAR
Period of Performance: 04/29/2024 - 04/28/2025
5 Option 4 1.000000 YEAR
Period of Performance: 04/29/2025 - 04/28/2026
Section C - Descriptions/Specifications/Statement of Work
AOC.C.1 Statement of Work
See Section J Attachment 1.
Section E - Inspection and Acceptance
Clause Title Fill-ins
52.246-2 Inspection of Supplies-Fixed-Price (Aug 1996)
52.246-16 Responsibility for Supplies (Apr 1984)
52.246-6 Inspection-Time-and-Material and Labor-Hour (May 2001)
(a) Definitions. As used in this clause-
"Contractor's managerial personnel" means any of the Contractor's directors, officers, managers, superintendents, or equivalent repres-entatives who have supervision or direction of-
(1) All or substantially all of the Contractor's business;
(2) All or substantially all of the Contractor's operation at any one plant or separate location where the contract is being performed; or
(3) A separate and complete major industrial operation connected with the performance of this contract.
"Materials" includes data when the contract does not include the Warranty of Data clause.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the material, fabricating methods, work, and services under this contract. Complete records of all inspection work performed by the Contractor shall be main-tained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may
Document Number: AOCSSB21Q0025 Page 4 of 33 also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) Unless otherwise specified in the contract, the Government shall accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they shall be presumed accepted 60 days after the date of delivery, unless accepted earlier.
(f) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or cor-rect services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (h) of this clause, the cost of replacement or correction shall be determined under the Payments Under Time-and-Materials and Labor- Hour Contracts clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken.
(g)(1) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replace-ment or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may-
(i) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such in-creased cost from any amounts paid or due under this contract; or
(ii) Terminate this contract for default.
(2) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute.
(h) Notwithstanding paragraphs (f) and (g) of this clause, the Government may at any time require the Contractor to remedy by correc-tion or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to-
(1) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or
(2) The conduct of one or more of the Contractor's employees selected or retained by the Contractor after any of the Contractor's ma-nagerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.
(i) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.
(j) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.
(k) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.
(End of clause)
52.211-17 Delivery of Excess Quantities (Sept 1989)
The Contractor is responsible for the delivery of each item quantity within allowable variations, if any. If the Contractor delivers and the Government receives quantities of any item in excess of the quantity called for (after considering any allowable variation in quant-ity), such excess quantities will be treated as being delivered for the convenience of the Contractor. The Government may retain such excess quantities up to $250 in value without compensating the Contractor therefor, and the Contractor waives all right, title, or in-terests therein. Quantities in excess of $250 will, at the option of the Government, either be returned at the Contractor's expense or re-tained and paid for by the Government at the contract unit price.
(End of clause)
52.247-34 F.o.b. Destination (Nov 1991)
(a) The term "f.o.b. destination," as used in this clause, means--
Document Number: AOCSSB21Q0025 Page 5 of 33
(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capa-city. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is re-quired to complete delivery to consignee.
(b) The Contractor shall--
(1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
(End of clause)
Section G - Contract Administration Data
AOC52.201-1 Contracting Officers Authority (Jun 2004)
The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, not-withstanding any provision contained elsewhere in this contract. In the event that the Contractor makes any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
(End of clause)
AOC52.201-2 Contracting Officers Representative (COTR) (January 2021)
The Government shall provide the name, address and telephone number of the COR at the time of contract award and the duties thereby delegated to that person. Any subsequent change to the individual or the individual s responsibilities will be confirmed in writing by the Contracting Officer. In no instance will the COR be delegated authority to order any change in the contractor s per-formance which would affect (a) cost or schedule for contracts for services or supplies, or (b) scope, the completion date for interme-diate phases or milestones, or overall completion date for contracts for construction.
(End of clause)
AOC52.204-6 Capitol Complex Conditions Affecting Contractor Operations (May 2008)
Capitol Complex operations are, at irregular and unanticipated times, interrupted due to events that can occur on the Capitol Complex, e.g., funerals that utilize the Rotunda, closure of Congressional buildings due to unusual activities, etc. These events can impact AOC contractor operations. Any AOC contractor that becomes aware of an event that may affect its operations on the Capitol Complex may go to www.aoc.gov/business/contractors to receive current information of the operational status of the Capitol Complex. Before ceasing or limiting its operations, the Contractor must obtain written approval from the Contracting Officer.
(End of clause)
Document Number: AOCSSB21Q0025 Page 6 of 33
AOC52.211-1 Key Personnel (January 2021)
(a) The Contractor shall assign to this contract the following key personnel as proposed in the Contractor's bid, quote or technical pro-posal:
To be filled in after award.
(b) At any time during performance of the contract, the AOC reserves the right to require the contractor to remove a Key Person-nel individual and demand a substitution in accordance with the pertinent provisions of Paragraph (d) below.
(c) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitu-tion is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 cal-endar days after the occurrence of any of these events and provide the information required by Paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by Paragraph (c) to the Contracting Officer at least 15 calendar days prior to making any permanent substitutions.
(d) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete re-sumes for the proposed substitutions, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the person being replaced. The Contracting Officer will notify the Contractor with-in 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
(e) The approval of substitute personnel will not be considered to be grounds for an increase in the contract price.
(f) The special security requirements in AOC52.223-5, Special Security Requirements, or AOC52.223-6, Special Security Require-ments - U.S. Supreme Court, shall apply to all approved Contractor personnel substitutions.
(End of clause)
AOC52.211-2 Approval of Substitute Contractor Personnel (Jun 2004)
(a) During the first 90 days , the Contractor shall make no substitutions of personnel unless the substitution is necessitated by ill-ness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the oc-currence of any of these events and provide the information required by paragraph (b) below. After the initial 90 day period, the Contractor shall submit the information required by paragraph (b) to the Contracting Officer at least 15 calendar days prior to making any permanent substitutions.
(b) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete re-sumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the person being replaced.
(c) This paragraph applies only to a labor hour or time-and-materials contract. The Unit Price (hourly labor rate) for the approved substituted personnel shall remain the same as the rates of the relevant labor category, in the applicable Base Year or any of the sub-sequent Option Years (see the SCHEDULE OF ITEMS in Section B).
(d) The special security requirements in AOC52.223-5, Special Security Requirements, or AOC52.223-6, Special Security Require-ments - U.S. Supreme Court, shall apply to all approved Contractor personnel substitutions.
(End of clause)
AOC52.223-5 Special Security Requirements (Feb 2010)
(a) All vehicles, and contents, used by the Contractor or his subcontractors, which enter or leave United States Government property during performance of the work, will be subject to clearance, inspection and identification procedures conducted by the United States Capitol Police.
(b) All persons entering the Legislative Branch Buildings shall gain access to the building by passing through x-ray screening devices. In addition, all handbags and all hand-carried items shall be screened by x-ray devices prior to their entry into the building.
(c) All personnel provided by the Contractor and employed on the site of the work will be subject to a security background investiga-tion. Each employee will be required to fill out an I.D. Request Form and U.S. Capitol Police Request for check of Criminal History Records and each employee will be photographed and fingerprinted. The Contractor shall provide any assistance required by any of its employees in completing the forms.
(1) The average length of time for completion of the security background investigation is about 2 weeks, however, several variables can significantly affect this timeframe - for example, if a contractor's employee does not cooperate in the security background invest-igation, or if a contractor's employee does not report timely for processing, or if a contractor's employee has been arrested/convicted and is contacted for an opportunity to address these records. In these types of situations, additional time might be needed to complete the security background investigation process.
(2) The Contractor shall obtain all security background investigations required for its workforce and shall incorporate the process time in its offer.
(3) Delays incurred by the Contractor in security background investigations required under this contract shall be at no cost to the gov-ernment.
(d) Prior to commencement of work, the contractor and all designated on-site employees will be required, on a one-time basis, to be fingerprinted in Washington D.C. The location for the Electronic Fingerprinting Service is the U.S. Capitol Hill Police, Fairchild
Document Number: AOCSSB21Q0025 Page 7 of 33
Building, 499 South Capitol Street SW, Washington, DC 20003.
(e) Within 7 calendar days after the date of contract award, the Contractor shall submit to the Contracting Officer's Representative (COR) a list of all employees proposed to be employed on this contract. This list shall include the employee's full name, date of birth and social security number.
(f) While security background investigations are in process, the Contractor's employees must not be granted access to the Capitol Hill complex to perform work or provide services for the AOC unless they are escorted by an AOC staff member. "Escorted" is defined to mean that the AOC staff member will remain with the employee(s) at all times during the performance of the work. Any of the Con-tractor's employees who are perceived by the Contracting Officer as a security risk as a result of evidence discovered in the security background investigation, will not be issued an Identification Card, will be denied access to the site of the work, and the Contractor will be directed to remove such employee from performance of any of the contract work, whether it be on or off the work site. Any contractor employee denied access to the site of work on a contract or task/delivery order as a result of a security background investig-ation may not apply for access to any other AOC/US Supreme Court contract or task/delivery order work site.
(g) An identification card, with photograph, will be prepared for each employee of the Contractor requiring access to the site. The identification card shall be dated to indicate the period of time for which it is to remain valid - from the date the employee reports for duty until the applicable date which occurs first: the expiration of the contract, or the last date of the employee's tour of duty with the Contractor. All contractor personnel must wear the ID badge whenever on the Capitol complex premises or when attending off-site functions on behalf of the AOC. ID badges must be worn in such a manner that contractor personnel can be easily identified as such.
(h) The Contractor is fully responsible to return:
(1) The ID badge of any individual employee, including subcontractor personnel, who is removed for any reason including but not limited to illness, or dismissal;
(2) The ID badges of all contractor employees, including subcontractor personnel, whose performance under the contract is completed in advance of final contract job completion; and
(3) All outstanding ID badges issued for the contractor and its employees, including subcontractor personnel, within 24 hours of on site contract job completion.
(i) ID badges are to be hand delivered by the contractor within 24 hours of any of the events listed under (h) above to the COR.
(j) The contractor's failure to return any ID badge, access card, or key issued under this contract or order shall result in a deduction of $100.00 from the contract per ID badge, access card, and/or key not returned.
(End of clause)
AOC52.223-8 Delivery Vehicle Inspection Requirements (November 2018)
(a) All vehicles and contents used by the Contractor, or its subcontractors, which enter or leave United States Government prop-erty during performance of work under this contract will be subject to clearance, inspection, and identification procedures conducted by the United States Capitol Police.
(b) All delivery vehicles will be required to report to the Off-Site Inspection Center for the U.S. Capitol Police located at 4700 Shepherd Parkway SW, for inspection, before proceeding to:
(1) The Capitol Building/CVC loading dock at New Jersey Ave. & C Street NW;
(2) The Senate Office Buildings loading dock at the Hart Tunnel in the 100 block of D Street, NE;
(3) The for the Ford House Office Building loading dock in the 200 block of Virginia Avenue, SW;
(4) The access point for the Rayburn, Longworth, Cannon House Office Buildings at Delaware Ave. & Washing-ton Avenue, SW;
(5) The loading dock for the Library of Congress in the 100 block of 2nd Street SE; and, if applicable
(6) The loading dock for the U.S. Supreme Court in the 100 block of 2nd Street NE.
Any questions shall be directed to the United States Capitol Police Off-Site Inspection Center during business hours (4:30 AM-7:00 PM) at 202 224-0202.
(c) Prior notification for all exceptions and after hours deliveries will be processed through the House / Senate Sergeant at Arms, the Architect of the Capitol, USCP Special Events (202-224-8891), or USCP Construction Security Division (202) 593-7053). The USCP Command Center (202 224-0908) will be notified during the hours that the Special Events Section is closed. Exception ex-ample: Time sensitive deliveries and deliveries containing material such as concrete, asphalt, and other materials /goods that may de-teriorate over a short period of time. All deliveries for special events/functions in any Capitol Complex, building, must have approval through the House or Senate Sergeant At Arms office prior to inspection at the Off-Site Inspection Center – please call USCP Special Events at the number above.
(d) Within seven calendar days prior to the first delivery under this contract, the contractor shall provide to the U.S. Capitol Po-lice a letter on company letterhead accompanied by signature of the owner, president or manager the following information:
(1) List of drivers (in alphabetical order);
(2) Date of birth for each driver;
(3) Social Security Number of each driver;
(4) Vehicle description to include – color, make, model and any signage on vehicle;
(5) License tag number and state of issuance;
(6) Building(s) to be accessed; and
(7) Company contact person and phone number/
The above information is to be provided to the United States Capitol Police Off-Site Inspection Center, 4700 Shepherd Parkway SW, Washington, D.C. 20032, via fax: 202 563-5140. For verification of receipt, the contractor may call (202) 224-0202.
(e) Updates to the information required by this clause shall be renewed April 30, August 31, and December 31 of each year.
Document Number: AOCSSB21Q0025 Page 8 of 33
(End of clause)
(a) All vehicles and contents used by the Contractor, or its subcontractors, which enter or leave United States Government prop-erty during performance of work under this contract will be subject to clearance, inspection, and identification procedures conducted by the United States Capitol Police.
(b) All delivery vehicles will be required to report to the Off-Site Inspection Center for the U.S. Capitol Police located at 4700 Shepherd Parkway SW, for inspection, before proceeding to:
(1) The Capitol Building/CVC loading dock at New Jersey Ave. & C Street NW;
(2) The Senate Office Buildings loading dock at the Hart Tunnel in the 100 block of D Street, NE;
(3) The for the Ford House Office Building loading dock in the 200 block of Virginia Avenue, SW;
(4) The access point for the Rayburn, Longworth, Cannon House Office Buildings at Delaware Ave. & Washington Avenue, SW;
(5) The loading dock for the Library of Congress in the 100 block of 2nd Street SE; and, if applicable
(6) The loading dock for the U.S. Supreme Court in the 100 block of 2nd Street NE.
Any questions shall be directed to the United States Capitol Police Off-Site Inspection Center during business hours (4:30 AM-7:00 PM) at 202 224-0202.
(c) Prior notification for all exceptions and after hours deliveries will be processed through the House / Senate Sergeant at Arms, the Architect of the Capitol, USCP Special Events (202-224-8891), or USCP Construction Security Division (202) 593-7053). The USCP Command Center (202 224-0908) will be notified during the hours that the Special Events Section is closed. Exception ex-ample: Time sensitive deliveries and deliveries containing material such as concrete, asphalt, and other materials /goods that may de-teriorate over a short period of time. All deliveries for special events/functions in any Capitol Complex, building, must have approval through the House or Senate Sergeant At Arms office prior to inspection at the Off-Site Inspection Center – please call USCP Special Events at the number above.
(d) Within seven calendar days prior to the first delivery under this contract, the contractor shall provide to the U.S. Capitol Po-lice a letter on company letterhead accompanied by signature of the owner, president or manager the following information:
(1) List of drivers (in alphabetical order);
(2) Date of birth for each driver;
(3) Social Security Number of each driver;
(4) Vehicle description to include – color, make, model and any signage on vehicle;
(5) License tag number and state of issuance;
(6) Building(s) to be accessed; and
(7) Company contact person and phone number/
The above information is to be provided to the United States Capitol Police Off-Site Inspection Center, 4700 Shepherd Parkway SW, Washington, D.C. 20032, via fax: 202 563-5140. For verification of receipt, the contractor may call (202) 224-0202.
(e) Updates to the information required by this clause shall be renewed April 30, August 31, and December 31 of each year.
(End of clause)
AOC52.242-2 Contractor Performance Evaluations (Dec 2006)
At the conclusion of contract performance and/or at any point during the performance of this contract, the AOC may elect to evaluate the Contractor and submit a final or interim performance evaluation into the appropriate on-line database designated as the repository of Contractor evaluations for the Federal Government. Any evaluation submitted shall include input from the Contracting Officer's Technical Representative and other agency personnel, as appropriate, and the Contracting Officer. The Contractor shall have the op-portunity to review any evaluations and submit supporting information for any differing of positions between the Contractor and the AOC in accordance with the protocol established by the specific on-line database.
(End of clause)
Section I - Contract Clauses
52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon re-quest, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/ these address(es):
https://www.acquisition.gov/browse/index/far [Insert one or more Internet addresses]
(End of clause) Clause Title Fill-ins
Document Number: AOCSSB21Q0025 Page 9 of 33
Clause Title Fill-ins
52.202-1 Definitions (Jun 2020)
52.203-3 Gratuities (Apr 1984)
52.203-5 Covenant Against Contingent Fees (May 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020)
52.203-7 Anti-Kickback Procedures (Jun 2020)
52.211-5 Material Requirements (Aug 2000)
52.215-8 Order of Precedence - Uniform Contract Format (Oct 1997)
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment (Jun 2020)
52.222-21 Prohibition of Segregated Facilities (Apr 2015)
52.222-26 Equal Opportunity (Sept 2016)
52.222-35 Equal Opportunity for Veterans (Jun 2020)
52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020)
52.222-37 Employment Reports on Veterans (Jun 2020)
52.222-50 Combating Trafficking in Persons (Jan 2019)
52.223-6 Drug-Free Workplace (May 2001)
52.223-15 Energy Efficiency in Energy-Consuming Products (May 2020)
52.225-1 Buy American-Supplies (May 2014)
52.225-13 Restrictions on Certain Foreign Purchases (June 2008)
52.227-1 Authorization and Consent (Jun 2020)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun
2020)
52.227-3 Patent Indemnity (Apr 1984)
52.229-3 Federal, State and Local Taxes (Feb 2013)
52.232-11 Extras (Apr 1984)
52.232-23 Assignment of Claims (May 2014)
52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)
52.242-13 Bankruptcy (July 1995)
52.243-1 Changes-Fixed-Price (Aug 1987)
52.246-23 Limitation of Liability (Feb 1997)
52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012)
52.249-8 Default (Fixed-Price Supply and Service) (Apr 1984)
52.253-1 Computer Generated Forms (Jan 1991)
Document Number: AOCSSB21Q0025 Page 10 of 33
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Jun 2020)
(a) Definition. "Commercially available off-the-shelf (COTS)" item, as used in this clause--
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition in Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
(b) The Government suspends or debars Contractors to protect the Government's interests. Other than a subcontract for a commer-cially available off-the-shelf item, the Contractor shall not enter into any subcontract, in excess of the threshold specified in FAR 9.405-2(b) on the date of subcontract award, with a Contractor that is debarred, suspended, or proposed for debarment by any execut-ive agency unless there is a compelling reason to do so.
(c) The Contractor shall require each proposed subcontractor whose subcontract will exceed the threshold specified in FAR 9.405-2(b) on the date of subcontract award, other than a subcontractor providing a commercially available off-the-shelf item, to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor, or its principals, is or is not debarred, sus-pended, or proposed for debarment by the Federal Government.
(d) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcon-tract with a party (other than a subcontractor providing a commercially available off-the-shelf item) that is debarred, suspended, or proposed for debarment (see FAR 9.404 for information on the System for Award Management (SAM) Exclusions). The notice must include the following:
(1) The name of the subcontractor.
(2) The Contractor's knowledge of the reasons for the subcontractor being listed with an exclusion in SAM.
(3) The compelling reason(s) for doing business with the subcontractor notwithstanding its being listed with an exclusion in SAM.
(4) The systems and procedures the Contractor has established to ensure that it is fully protecting the Government's interests when dealing with such subcontractor in view of the specific basis for the party's debarment, suspension, or proposed debarment.
(e) Subcontracts. Unless this is a contract for the acquisition of commercial items, the Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for the identification of the parties), in each subcontract that--
(1) Exceeds the threshold specified in FAR 9.405-2(b) on the date of subcontract award; and
(2) Is not a subcontract for commercially available off-the-shelf items.
(End of clause)
52.217-8 Option to Extend Services (Nov 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Of-ficer may exercise the option by written notice to the Contractor within before the BPA expires. [insert the period of time within which the Contracting Officer may exercise the option].
(End of clause)
52.217-9 Option to Extend the Term of the Contract (Mar 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within before the BPA expires [insert the period of time within which the Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days [60 days unless a different number of days is inserted] before the con-
Document Number: AOCSSB21Q0025 Page 11 of 33 tract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 (months)(years).
(End of clause)
52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997)
(a) "Hazardous material," as used in this clause, includes any material defined as hazardous under the latest version of Federal Stand-ard No. 313 (including revisions adopted during the term of the contract).
(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.
Material (If none, insert "None") Identification No.
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be de-livered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently suc-cessful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incom-plete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any respons-ibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazard-ous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with paragraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The Government is not precluded from using similar or identical data acquired from other sources.
(End of clause)
52.233-3 Protest after Award (Aug 1996)
(a) Upon receipt of a notice of protest (as defined in FAR 33.101) or a determination that a protest is likely (see FAR 33.102(d)), the Contracting Officer may, by written order to the Contractor, direct the Contractor to stop performance of the work called for by this contract. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Con-
Document Number: AOCSSB21Q0025 Page 12 of 33 tractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stop-page. Upon receipt of the final decision in the protest, the Contracting Officer shall either--
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled either before or after a final decision in the protest, the Contractor shall re-sume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--
(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the perform-ance of any part of this contract; and
(2) The Contractor asserts its right to an adjustment within 30 days after the end of the period of work stoppage; provided, that if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon a proposal at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall al-low, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(e) The Government's rights to terminate this contract at any time are not affected by action taken under this clause.
(f) If, as the result of the Contractor's intentional or negligent misstatement, misrepresentation, or miscertification, a protest related to this contract is sustained, and the Government pays costs, as provided in FAR 33.102(b)(2) or 33.104(h)(1), the Government may re-quire the Contractor to reimburse the Government the amount of such costs. In addition to any other remedy available, and pursuant to the requirements of subpart 32.6, the Government may collect this debt by offsetting the amount against any payment due the Con-tractor under any contract between the Contractor and the Government.
(End of clause)
AOC52.202-1 Definitions (Jun 2004)
(a) The term "head of the agency" as used herein means the Committee, Commission, or other authority of the Legislative Branch of the Government having final jurisdiction or supervision over the work involved. The term "other authority" as used in this paragraph includes the Contracting Officer in cases in which he has final jurisdiction or supervision over the work involved.
(b) The term "Architect" as used herein means the Architect of the Capitol.
(c) The term "Contracting Officer" as used herein means the Architect of the Capitol or his duly authorized representative.
(d) The term "his duly authorized representative" as used herein means any person or persons or board authorized to act for the head of the agency within the scope of their authority.
(e) Except as otherwise provided in this contract, the term "subcontracts" includes purchase orders placed for performance under this contract.
(End of clause)
AOC52.203-1 Advertising/Promotional Materials (Dec 2005)
(a) It is the policy of the Congress to discourage contractors providing services and supplies to the Legislative Branch entities, includ-ing the Architect of the Capitol, from advertising practices that feature the Capitol and Capitol Complex in a manner in which con-veys, or is reasonably calculated to convey, a false impression of sponsorship, approval or endorsement of any product or service by the Congress, the Government of the United States, or any Department, Agency or instrumentality thereof.
(b) Contractors performing construction services for Legislative Branch entities, including the Architect of the Capitol, are discour-aged from capitalizing on their contractual relationships with such entities and shall not engage in advertising practices which convey, or are reasonably calculated to convey, a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .