AOCACB23R0012
Architect/Engineering Services for
Sprinkler Improvements, U.S. Capitol
General Information Document Type: Public Announcement Announcement Number: AOCACB23R0012 Posted Date: 18 November 2022 Questions Due Date: 5 December 2022 4:00 PM (EST) SF330 Due Date: 19 December 2022 4:00 PM (EST) Classification Code: C219 – Architecture & Engineering Services NAICS Code: 541330 – Engineering Services
Contracting Office Address Architect of the Capitol Design and Construction Acquisition Division John Lingamfelter, Contracting Officer Ford House Building Room H2-537 2nd and D Streets SW Washington, DC 20515
Project Overview The Architect of the Capitol (AOC) is seeking to procure A/E Services in accordance with the AOC Contracting Manual Section 8.5 A/E Services and consistent with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) 36.6 for services to provide a sprinkler design developed with sensitivity to the historic art and architecture of the US Capitol.
The new sprinkler design shall minimize visual impact and limit damage to historic fabric. The installation shall be reversible and facilitate maintenance. The A/E shall consider phasing, sequence of work, operational impacts and address the feasibility of construction in a building that is occupied.
Project Description A five-year, single award Sprinkler Improvement Design Indefinite Delivery, Indefinite Quantity (IDIQ) contract will provide the AOC with a qualified firm to develop a Program of Requirements, Construction Documents, and Construction Administration Services for the design and installation of a fire suppression system serving sensitive, historic areas of the US Capitol, including floor levels 1, 2, 3 and the basement West Front Offices. It is anticipated that Task 1 Program of Requirements (POR), to be awarded as Task Order 001, will be completed no later than 14 months from contract award. Additional task orders are anticipated for related follow-on work.
The A/E shall provide professional services to develop a sprinkler design. The development of a POR and the preparation of construction documents shall be executed through subsequent task orders under this IDIQ.
In addition to architectural study and design, shall include but is not limited to code review and analysis, value engineering (VE), life cycle cost analysis, constructability review, concept through design construction documents and specifications, innovative strategies, project communications, post occupancy evaluations, architectural renderings, construction administration and related services, LEED analyses and quality control. The Government intends to award a Construction Administration Services Task Order under this IDIQ. However, if the construction administration services cannot be awarded within the IDIQ’s five (5) year ordering period (i.e. schedule slip, delay in LICP funding) the Government reserves the right to sole source award a Contract Administration Services contract to the awardee of this IDIQ.
Other required professional services include the following:
1. Interior Design
2. Structural Engineering
3. Historic Preservation
4. Mechanical Engineering
5. Plumbing Engineering
6. Electrical Engineering
7. Electronic Engineering
8. Acoustical, Audio-Visual Engineering
9. Vertical Transportation
10. Roofing and Waterproofing
11. Sustainable Design
12. Commissioning
13. Fire Protection
14. Industrial Hygienist (IH) and Certified Industrial Hygienist (CIH)
15. Security Assessment and Design Services
16. Cost Estimating
17. Additional Services
-Building Information Modeling (BIM) -Computer Aided Design (CAD) -Specific required services will be described in the Statement of Work for each individual Task Order. All work shall comply with the applicable codes and regulations as directed by the AOC.
-Risk Management Consultant
To ensure Sprinkler Improvements Design is performed by the most talented team, the IDIQ will use a procurement approach similar to the Brooks Act. This will allow the AOC to expediently select a firm based on their technical competency, qualifications and prior experience.
Contract Procedures:
THIS IS NOT A REQUEST FOR PROPOSAL. THE FUTURE REQUEST
FOR PROPOSAL WILL NOT BE PUBLICLY ISSUED BUT WILL BE ISSUED
CONSISTENT WITH FAR 36.
THIS IS A REQUEST FOR STANDARD FORM (SF) 330'S ARCHITECT-ENGINEER
QUALIFICATION PACKAGES ONLY. THE GOVERNMENT WILL NOT PAY, NOR
REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE
GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT
OF THIS ANNOUNCEMENT. ALL INFORMATION NEEDED TO SUBMIT SF 330
DOCUMENTS IS CONTAINED HEREIN. NO OTHER REQUEST FOR SF 330'S WILL BE
MADE. NO OTHER SYNOPSIS TO SAM.gov IS ANTICIPATED.
Interested A/E firms shall submit a Qualifications Package which comprises of relevant overall experience, a management plan and certain Key Personnel documentation that their team provides all required skills as indicated here within, and evidence of satisfactory past performance demonstrating their capability to successfully execute the requirements of the proposed contract. The AOC will evaluate the qualifications in accordance with the selection criteria listed herein and will short-list the three (3) most qualified A/E firms.
This synopsis constitutes public announcement consistent with the requirements in FAR 36.601-
1. Interested prime firms having the capabilities to perform these services must submit a comprehensive Standard Form 330 (SF 330), including all subcontractor/consultant information, in accordance with the Submission Format section, below. Firms will be selected based on demonstrated competence and qualifications for the required work as per their SF 330. The SF 330 can be found on the following GSA web-site: https://www.gsa.gov/forms-library/architect-engineer-qualifications
The Selection Process consistent with FAR 36.602 will be utilized and the selection criteria for this acquisition are listed below. Each selection criteria are to be specifically addressed not only through the submission of the SF 330s but also in narrative format, to clearly show how each selection criteria is formally addressed. Failure to include narrative explanatory information may result in a lower evaluation.
The AOC will short-list the Firms to a total of three (3) of the most highly qualified A/E firms consistent with FAR 36.602-3(c). As part of this process, each of the selected most highly qualified A/E firms will be invited to participate in an Interview Presentation to the Evaluation Board to highlight their qualifications and present their approach to the Phase One requirement, Task Order 1. Presentations will be followed by a question-and-answer period. The presentation and interview will occur as a tele-conference call, at a date and location to be determined. Firms will be given sufficient advance notice to allow their representatives to participate in the interviews or presentations. It is recommended that the A/E firm's key personnel for assignment on the project be present and actively participate during the presentation.
After the interview process is completed, the Government will make the final selection consistent with FAR 36.602-4. Negotiations for IDIQ labor rates and the scope of the Task Order 1, on a
Firm Fixed contract type, will then begin with the highest rated A/E firm consistent with FAR 36.606. If a mutually satisfactory contract cannot be negotiated, the contracting officer shall obtain a written final proposal revision from the firm, and notify the firm that negotiations have been terminated. The contracting officer shall then initiate negotiations with the next firm on the final selection list. The proposed A/E services will be obtained by individual Task Orders on a Firm Fixed Price contract type.
This announcement is open to all businesses regardless of their size. Award of the contract is estimated to occur on or about April 2023. If a large business is selected for this contract, it must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan. A subcontracting plan is not required with this submittal but will be requested prior to award with the selected firm if applicable.
Submission Format:
Submissions must conform to Attachment 1 CB19016 Section L (Instructions to Firm).
Selection Criteria:
Submissions will be evaluated in accordance with Attachment 2 CB19016 Section M (Evaluation Factors for Award).
Phase I: Firms responding to this notice will be evaluated and ranked using the selection criteria listed below and as further detailed in Section L. The factors are listed in descending order of importance. The selection criteria evaluation will consider how each factor is addressed and how it is formatted in order to coincide with the selection criteria in accordance with the evaluation criteria in Section M. The selection criteria listed below shall be addressed in Part H of the SF- 330.
1. Professional qualifications necessary for satisfactory performance of required services.
2. Specialized experience and technical competence in the design of sprinkler and fire suppression systems and/or MEP systems for historic buildings fire suppression. Significant project experience with fire protection, code compliance and alternative compliances methods as they pertain to historic buildings is sought.
3. Past performance on contracts with Government agencies and private industry in terms of cost control, high quality design aesthetics and graphic design, overall quality of work, and compliance with performance schedules.
4. Capacity to accomplish the work in the required time.
5. Location in the general geographical area of the project and knowledge of the locality of the project.
6. Management Plan
Phase II: The short-listed firms will be invited to present their qualifications in person to the Evaluation Board in the form of Interview Presentations. The Interview Presentation instructions and will be provided to these firms at the time they short listed. Each short-listed firm will be evaluated based on their responses to the evaluation criteria during their Interview Presentation.
Point of Contact John Lingamfelter, Contracting Officer, Email: john.lingamfelter@aoc.gov Laurie Harvey, Contract Specialist, Email: laurie.harvey@aoc.gov
Architect of the Capitol, Design and Construction Acquisition Division, Ford House Building Room H2-537, 2nd and D Streets SW, Washington, DC 20515, UNITED STATES.
Place of Performance The A/E’s established design production offices and Project Site.
The work involved in this contract can be performed at Contractor’s facilities, however, contractors will be required to come onsite for project meetings, field survey work, and other site visits deemed necessary for completion of work under each Task Order.
Project Site United States Capitol Sprinkler Improvements, Washington, D.C.
Attachments:
Attachment No. Description Date Page 1 Attachment 1 CB19016 Section L - R2022.11.18 11/18/2022 10 2 Attachment 2 CB19016 Section M - R2022.11.10 11/10/2022 5 3 Attachment 3 CB19016 IDIQ SOW 2022.11.14 11/14/2022 14
Attachment 4 Architect Engineer Qualifications
SF330 7/1/2021 14
5 Attachment 5 Past Performance Questionnaire 10/24/2022 5 6 Attachment 6 Design Manual M-28-10 Dec13 12/1/2013 112 7 Attachment 7 Design Standards (December 2018) 12/1/2018 160
Attachment 8 Manual 28-13 Building Information Modeling Guide (Dec 14) 12/1/2014 46
9 Attachment 9 CUI Policy Guide 05.06.2016 5/6/2016 17 10 Attachment 10 PandemicFlu 12/3/2009 1
Attachment 11 COVID-19 Health Screening Inventory V5.4 3/15/2022 1
Attachment 12 COVID-19 OAP Decision Tool (attach to AOC Clause AOC52.223-11) 3/15/2022 1
Attachment 13 USCP Vehicle Delivery Procedure Reference Guide (5-08) 5/1/2008 1
Attachment 14 Sample Certificate of Insurance
(COI) 1/13/2011 1
Attachment 15 USCP Request for Check of Criminal History 1/29/2022 1
‐ End of Public Announcement AOCACB23R0012 -
File details come from the government source that posted it. Updated .