Annex L Wastewater Services - 18 Feb 22.pdf

PDF 118 KB Posted

Attached to
RFI for Base Operations Support, Ft. Wainwright, AK Federal contract opportunity
Solicitation number
W912CN-21-R-0023
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This special notice includes a request for information regarding a draft performance work statement for base operations support services at Fort Wainwright, Alaska. The Department of the Army is seeking feedback on the draft performance work statement and exhibits to provide clear guidance, unambiguous statements, better defined outcomes, and greater consistency. Interested parties are invited to submit questions on a provided template related to paragraphs in the performance work statement or technical exhibit numbers by the specified due date. The response should include company information and any additional details to assist the Army in identifying weaknesses or concerns with the requirements documents. This special notice is issued for information and planning purposes only and does not constitute a request for proposal.

View the file

Other files for this federal contract opportunity

Other files attached to RFI for Base Operations Support, Ft. Wainwright, AK, newest first.
File Type Posted
Annex B- Facilities Maintenance Instruction - 18 Feb 22.pdf PDF
Annex K Heating and Cooling Services - 18 Feb 22.pdf PDF
TE 7 - Roof Gutters_Drains_and_Downspouts (1)DRAFT.pdf PDF
TE 10 - Integrated Cultural Resources Management PlanDRAFT.pdf PDF
TE 11 - Fort Wainwright BridgesDRAFT.pdf PDF
TE 12 - Sweeping ServicesDRAFT.pdf PDF
TE 22 - PlaygroundsDRAFT.pdf PDF
TE 30 - GatesDRAFT.pdf PDF
TE 40 - Historic Properties on Fort WainwrightDRAFT.pdf PDF
TE 47 - Army Airfield Pavement Maintenance ERDC ReportDRAFT.pdf PDF
TE 57 - Mechanical RoomsDRAFT.pdf PDF
TE 68 - Snow_Ice_And Gavel Removal PlanDRAFT.pdf PDF
TE 70 - Between Occupancy Maintenance CLSDRAFT.pdf PDF
TE 74 - Cranes and HoistsDRAFT.pdf PDF
TE 78 - Generator PM LogDRAFT.pdf PDF
TE 79 - Generator PM ScheduleDRAFT.pdf PDF
Annex G Snow Ice and Sand Removal - 18 Feb 22.pdf PDF
RFI - Question Submission Form.xlsx XLSX spreadsheet
Annex J Maintenance - Surfaced and Unsurfaced Areas - 18 Feb 22.pdf PDF
TE 1 - Lists of Facilities and RoadsDRAFT.pdf PDF
TE 13 - CH Refuse Collection (2)DRAFT.pdf PDF
TE 15 - TM 5-624 Maintenance and Repair of Surface Areas.pdf PDF
TE 16 - Eyewash StationsDRAFT.pdf PDF
TE 18 - Pest Control Facilities ListDRAFT.pdf PDF
TE 19 - Cooling Systems (1)DRAFT.pdf PDF
TE 20 - Boilers and FurnancesDRAFT.pdf PDF
TE 25 - Emergency Exit LightsDRAFT.pdf PDF
TE 26 - WinterizationDRAFT.pdf PDF
TE 32 - Contractor SpaceDRAFT.pdf PDF
TE 33 - Backflow PreventersDRAFT.pdf PDF
TE 35 - Fuel Powered PumpsDRAFT.pdf PDF
TE 44 - Automatic DoorsDRAFT.pdf PDF
TE 45 - Water HeatersDRAFT.pdf PDF
TE 49 - CrosswalksDRAFT.pdf PDF
TE 50 - Ammunition BunkersDRAFT.pdf PDF
TE 51 - Guidelines for Rehabilitating Historic Buildings.pdf PDF
TE 59 - FWA Road InventoryDRAFT.pdf PDF
TE 64 - Mission Essential AreasDRAFT.pdf PDF
TE 67 - Sidewalk Snow Removal List.pdf PDF
TE 72 - Storm Water Pollution Prevention Plan.pdf PDF
TE 73 - DFAC EquipmentDRAFT.pdf PDF
TE 75 - Load ScalesDRAFT.pdf PDF
Annex F Maintenance-Grounds - 18 Feb 22.pdf PDF
TE 6 - Staffing Matrix (1).xlsx XLSX spreadsheet
TE 8 - Interior and Exterior Lighting Systems and ControlsDRAFT.pdf PDF
TE 17 - Fire Roll Up DoorsDRAFT.pdf PDF
TE 29 - Air CompressorsDRAFT.pdf PDF
TE 37 - Traffic LightsDRAFT.pdf PDF
TE 46 - Fire Alarm SytemsDRAFT.pdf PDF
TE 54 - Fort Wainwright Preventive Maintenance Plan (1)DRAFT.pdf PDF
Show all 50

RFI for Base Operations Support, Ft. Wainwright, AK has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex L (CLS 503 Wastewater Services) FRAGO 1 to OPORD 18-011: IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)

Annex L

Wastewater Services

13 December 2021

Table of Contents

1.0 GENERAL INFORMATION

1.1 Overview

1.2 Components

1.3 Work Management and Control

1.3.1 Reporting Requirements

1.3.2 Certification

2.0 DESCRIPTION OF SERVICES

2.1 STP Operation

2.2 Laboratory Testing

3.0 INDUSTRIAL WASTEWATER TREATMENT PLANT (IWTP)

3.1 Scope

3.1.1 Industrial Wastewater Treatment Plant (IWPT)

3.1.2 Lift Stations

3.1.3 Equalization Basins

3.1.4 Biological Ponds

3.1.5 Free Oil Separator (FOS) Facility

3.2 Components

3.3 Work Management and Control

3.3.1 Reporting Requirements

3.4 Services

3.4.1 IWTP Operation

3.4.2 Samples

3.4.3 Systems and Components Operation

3.4.4 On-Site Operator

3.4.5 Operational Tours

1.0 General Information.

1.1 Overview. The Fort Wainwright sanitary wastewater treatment and collection system collects and delivers sanitary wastewater to the Sewage Treatment Plant (STP) by means of collection lines, sewer mains, and lift stations. See TE 36.

1.2 Components. Sanitary wastewater treatment and collection system components include, but are not limited to, electrical, electronic, and digital systems and controls; level controls, control panels, phone dialers, switches, metering devices, sewage basins, alarms, lift stations, wet wells, dry wells, pumps, motors, air compressors, filters, piping, indicator lights, mounting hardware, meters, valves, and fittings, and laboratory equipment and components.

1.3 Work Management and Control.

1.3.1 Reporting Requirements. N/A

1.3.2 Certification. N/A

2.0 Description of Services. N/A

2.1 STP Operation. N/A

2.2 Laboratory Testing. N/A

3.0 Industrial Wastewater Treatment Plant (IWTP). N/A

3.1 Scope.

3.1.1 Industrial Wastewater Treatment Plant (IWPT). The Industrial Waste Collection System (IWCS) is privately operated by Doyon Utilities. The demarcation point for wasterwater is inside a building’s foundation.

3.1.2 Lift Stations. The Contractor shall repair lift stations, grease traps, great trap interceptors and all related componenets. Maintneance may require puming of lift stations or grease traps/interceptors. A list of Lift Stations can be found in TE 36.

3.1.3 Equalization Basins. N/A

3.1.4 Biological Ponds. N/A

3.1.5 Free Oil Separator (FOS) Facility. N/A

3.2 Components. N/A

3.3 Work Management and Control. N/A

3.3.1 Reporting Requirements. N/A

3.4 Services.

3.4.1 IWTP Operation. N/A

3.4.2 Samples. N/A

3.4.3 Systems and Components Operation. N/A

3.4.3 On-Site Operator. N/A

3.4.4 Operational Tours. N/A

File details come from the government source that posted it. Updated .