TE 66 - FWA DPW Environmental RequirementsDRAFT.pdf

PDF 674 KB Posted

Attached to
RFI for Base Operations Support, Ft. Wainwright, AK Federal contract opportunity
Solicitation number
W912CN-21-R-0023
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This document contains a draft performance work statement and request for information for base operations support services at Fort Wainwright, Alaska. The U.S. Department of the Army is seeking a firm fixed price contract for base operations support services, including environmental compliance and spill prevention. The contract would have a one-year base period and four one-year option periods. Interested parties are requested to provide feedback on the draft performance work statement and exhibits by the specified due date. Comments should identify weaknesses or concerns with the requirements documents and include the relevant paragraph or exhibit number. This request for information does not constitute a request for proposal or commitment to issue an future solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to RFI for Base Operations Support, Ft. Wainwright, AK, newest first.
File Type Posted
Annex F Maintenance-Grounds - 18 Feb 22.pdf PDF
Annex L Wastewater Services - 18 Feb 22.pdf PDF
TE 6 - Staffing Matrix (1).xlsx XLSX spreadsheet
TE 8 - Interior and Exterior Lighting Systems and ControlsDRAFT.pdf PDF
TE 17 - Fire Roll Up DoorsDRAFT.pdf PDF
TE 29 - Air CompressorsDRAFT.pdf PDF
TE 37 - Traffic LightsDRAFT.pdf PDF
TE 46 - Fire Alarm SytemsDRAFT.pdf PDF
TE 54 - Fort Wainwright Preventive Maintenance Plan (1)DRAFT.pdf PDF
TE 55 - Tip SheetsDRAFT.pdf PDF
TE 60 - Drainage MapsDRAFT.pdf PDF
TE 61 - Refuse Collection (2)DRAFT.pdf PDF
TE 71 - Point of Demarcation.pdf PDF
Annex B- Facilities Maintenance Instruction - 18 Feb 22.pdf PDF
Annex K Heating and Cooling Services - 18 Feb 22.pdf PDF
TE 7 - Roof Gutters_Drains_and_Downspouts (1)DRAFT.pdf PDF
TE 10 - Integrated Cultural Resources Management PlanDRAFT.pdf PDF
TE 11 - Fort Wainwright BridgesDRAFT.pdf PDF
TE 12 - Sweeping ServicesDRAFT.pdf PDF
TE 22 - PlaygroundsDRAFT.pdf PDF
TE 30 - GatesDRAFT.pdf PDF
TE 40 - Historic Properties on Fort WainwrightDRAFT.pdf PDF
TE 47 - Army Airfield Pavement Maintenance ERDC ReportDRAFT.pdf PDF
TE 57 - Mechanical RoomsDRAFT.pdf PDF
TE 68 - Snow_Ice_And Gavel Removal PlanDRAFT.pdf PDF
TE 70 - Between Occupancy Maintenance CLSDRAFT.pdf PDF
TE 74 - Cranes and HoistsDRAFT.pdf PDF
TE 78 - Generator PM LogDRAFT.pdf PDF
TE 79 - Generator PM ScheduleDRAFT.pdf PDF
Annex G Snow Ice and Sand Removal - 18 Feb 22.pdf PDF
RFI - Question Submission Form.xlsx XLSX spreadsheet
Annex J Maintenance - Surfaced and Unsurfaced Areas - 18 Feb 22.pdf PDF
TE 1 - Lists of Facilities and RoadsDRAFT.pdf PDF
TE 13 - CH Refuse Collection (2)DRAFT.pdf PDF
TE 15 - TM 5-624 Maintenance and Repair of Surface Areas.pdf PDF
TE 16 - Eyewash StationsDRAFT.pdf PDF
TE 18 - Pest Control Facilities ListDRAFT.pdf PDF
TE 19 - Cooling Systems (1)DRAFT.pdf PDF
TE 20 - Boilers and FurnancesDRAFT.pdf PDF
TE 25 - Emergency Exit LightsDRAFT.pdf PDF
TE 26 - WinterizationDRAFT.pdf PDF
TE 32 - Contractor SpaceDRAFT.pdf PDF
TE 33 - Backflow PreventersDRAFT.pdf PDF
TE 35 - Fuel Powered PumpsDRAFT.pdf PDF
TE 44 - Automatic DoorsDRAFT.pdf PDF
TE 45 - Water HeatersDRAFT.pdf PDF
TE 49 - CrosswalksDRAFT.pdf PDF
TE 50 - Ammunition BunkersDRAFT.pdf PDF
TE 51 - Guidelines for Rehabilitating Historic Buildings.pdf PDF
TE 59 - FWA Road InventoryDRAFT.pdf PDF
Show all 50

RFI for Base Operations Support, Ft. Wainwright, AK has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FWA DPW Environmental Requirements

Green Procurement. Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) requires the use of recycled and recovered products identified in the EPA’s Comprehensive Procurement Guidelines.

The Contractor shall use these recycled or recovered products unless they cannot be procured within a reasonable period of time not to exceed seven (7) calendar days; at prices not to exceed five (5) percent of prevailing rates; or the product(s) does not meet technical or performance standards. EPA Guidelines are the minimum requirement. The Contractor shall use materials and products commonly used in industry. The Contractor shall maintain records and submit an annual report to the COR/ACOR, along with the annual certification required by FAR 52.223-9 (Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items), upon completion of the base year and each option year.

Environmental Compliance. The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR/ACOR. The Contractor shall provide upon request from the COR/ACOR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the COR/ACOR.

Spill Plan. The Contractor shall notify the COR/ACOR within one (1) hour, if the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification. The Contractor shall submit a Spill Plan to the KO for approval within thirty (30) days of contract award IAW Spill Prevention Control and Countermeasure Plan.

DRAFT

File details come from the government source that posted it. Updated .