Annex K Heating and Cooling Services - 18 Feb 22.pdf

PDF 107 KB Posted

Attached to
RFI for Base Operations Support, Ft. Wainwright, AK Federal contract opportunity
Solicitation number
W912CN-21-R-0023
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This document includes a draft performance work statement and request for information for base operations support services at Fort Wainwright, Alaska. The Department of the Army is seeking feedback on the draft performance work statement and exhibits to provide clear guidance, unambiguous statements, and better defined outcomes for heating and cooling services, operation of mechanical rooms and air handling units, and repair of air conditioning systems at Fort Wainwright. Interested parties are invited to submit questions on the attached template by the specified deadline to assist the government in identifying weaknesses or concerns with the requirements documents. Responses will be considered by the Army in finalizing the performance work standards for a potential firm fixed price contract award with one base year and four option years.

View the file

Other files for this federal contract opportunity

Other files attached to RFI for Base Operations Support, Ft. Wainwright, AK, newest first.
File Type Posted
Annex F Maintenance-Grounds - 18 Feb 22.pdf PDF
Annex L Wastewater Services - 18 Feb 22.pdf PDF
TE 6 - Staffing Matrix (1).xlsx XLSX spreadsheet
TE 8 - Interior and Exterior Lighting Systems and ControlsDRAFT.pdf PDF
TE 17 - Fire Roll Up DoorsDRAFT.pdf PDF
TE 29 - Air CompressorsDRAFT.pdf PDF
TE 37 - Traffic LightsDRAFT.pdf PDF
TE 46 - Fire Alarm SytemsDRAFT.pdf PDF
TE 54 - Fort Wainwright Preventive Maintenance Plan (1)DRAFT.pdf PDF
TE 55 - Tip SheetsDRAFT.pdf PDF
TE 60 - Drainage MapsDRAFT.pdf PDF
TE 61 - Refuse Collection (2)DRAFT.pdf PDF
TE 71 - Point of Demarcation.pdf PDF
Annex B- Facilities Maintenance Instruction - 18 Feb 22.pdf PDF
TE 7 - Roof Gutters_Drains_and_Downspouts (1)DRAFT.pdf PDF
TE 10 - Integrated Cultural Resources Management PlanDRAFT.pdf PDF
TE 11 - Fort Wainwright BridgesDRAFT.pdf PDF
TE 12 - Sweeping ServicesDRAFT.pdf PDF
TE 22 - PlaygroundsDRAFT.pdf PDF
TE 30 - GatesDRAFT.pdf PDF
TE 40 - Historic Properties on Fort WainwrightDRAFT.pdf PDF
TE 47 - Army Airfield Pavement Maintenance ERDC ReportDRAFT.pdf PDF
TE 57 - Mechanical RoomsDRAFT.pdf PDF
TE 68 - Snow_Ice_And Gavel Removal PlanDRAFT.pdf PDF
TE 70 - Between Occupancy Maintenance CLSDRAFT.pdf PDF
TE 74 - Cranes and HoistsDRAFT.pdf PDF
TE 78 - Generator PM LogDRAFT.pdf PDF
TE 79 - Generator PM ScheduleDRAFT.pdf PDF
Annex G Snow Ice and Sand Removal - 18 Feb 22.pdf PDF
RFI - Question Submission Form.xlsx XLSX spreadsheet
Annex J Maintenance - Surfaced and Unsurfaced Areas - 18 Feb 22.pdf PDF
TE 1 - Lists of Facilities and RoadsDRAFT.pdf PDF
TE 13 - CH Refuse Collection (2)DRAFT.pdf PDF
TE 15 - TM 5-624 Maintenance and Repair of Surface Areas.pdf PDF
TE 16 - Eyewash StationsDRAFT.pdf PDF
TE 18 - Pest Control Facilities ListDRAFT.pdf PDF
TE 19 - Cooling Systems (1)DRAFT.pdf PDF
TE 20 - Boilers and FurnancesDRAFT.pdf PDF
TE 25 - Emergency Exit LightsDRAFT.pdf PDF
TE 26 - WinterizationDRAFT.pdf PDF
TE 32 - Contractor SpaceDRAFT.pdf PDF
TE 33 - Backflow PreventersDRAFT.pdf PDF
TE 35 - Fuel Powered PumpsDRAFT.pdf PDF
TE 44 - Automatic DoorsDRAFT.pdf PDF
TE 45 - Water HeatersDRAFT.pdf PDF
TE 49 - CrosswalksDRAFT.pdf PDF
TE 50 - Ammunition BunkersDRAFT.pdf PDF
TE 51 - Guidelines for Rehabilitating Historic Buildings.pdf PDF
TE 59 - FWA Road InventoryDRAFT.pdf PDF
TE 64 - Mission Essential AreasDRAFT.pdf PDF
Show all 50

RFI for Base Operations Support, Ft. Wainwright, AK has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex K (CLS 501 Heating/Cooling Services) FRAGO 1 to OPORD 18-011: IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)

Annex K

Heating/Services

13 December 2021

Table of Contents

1.0 GENERAL INFORMATION

1.1 Overview

1.2 Air Pollution Regulations

2.0 DESCRIPTION OF SERVICES

2.1 Scope

2.2 Heating and Boiler Plant Staffing

2.3 Operation of Mechanical rooms

2.3.1 Unattended Mechanical rooms

2.4 Central Boiler Plants

2.5 Summer Overhaul

2.6 Idle Standby Boilers

2.7 Monthly Inspections

2.8 Boiler/Heat Plant Shutdowns

2.9 Boiler Water Treatment Chemicals

2.10 Boiler Water Test Samples

2.11 Prepare Boilers and Coordinate Boiler Inspections

2.12 Boiler Plant Calibration

2.13 Emergencies

2.14 Operational Considerations

3.0 PURCHASE OF FUELS

3.1 Fuel Oil

3.2 Natural Gas Distribution System

3.3 Other Fuels

4.0 Air Handling Units and Ventilation Systems

4.1 Scope

4.2 Repair of Air Conditioning Systems

1.0 General Information.

1.1 Overview. Heating and Cooling Services provide steam, hot water, chilled water for heating, cooling, domestic hot water, and facility processes using Government-owned central heating and cooling plants, and distribution systems. The Fort Wainwright Heating Plant is operated through a privatized company and the contractor will have no responsibility for the heating plant.

1.2 Air Pollution Regulations. The Contractor shall operate all mechanical rooms in compliance with all Federal, State, and local air pollution regulations. The Contractor shall address all non-compliance issues immediately to the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR).

2.0 Description of Services.

2.1 Scope. The Contractor shall operate all mechanical rooms and systems (steam meters, automatic tank monitoring system, boilers, and furnaces) used in the production of domestic heat (including the provision of unscheduled services) as directed by the

COR/ACOR.

2.2 Heating and Boiler Plant Staffing. N/A

2.3 Operation of Mechanical rooms. The Contractor shall operate the steam/hot water mechanical rooms listed in TE 57. Operation of these plants includes start-up and shutdown of heating equipment; operator maintenance and inspection (maintenance required to operate mechanical rooms on a daily basis; e.g., during operational visits ensure the plant is operating properly). Operation also includes keeping required logs, correction of improper operating conditions, and making minor adjustments to the plant and equipment and keeping mechanical rooms clean.

2.3.1 Unattended Mechanical rooms. The Contractor shall operate all unattended mechanical rooms listed in TE 57. Operation of these plants shall include seasonal start-up and shut down of heating equipment.

2.4 Central Boiler Plants. N / A

2.5 Summer Overhaul. N / A

2.6 Idle Standby Boilers. N/A

2.7 Monthly Inspections. N / A

2.8 Boiler/Heat Plant Shutdowns. N / A

2.9 Boiler Water Treatment Chemicals. N / A

2.10 Boiler Water Test Samples. N / A

2.11 Prepare Boilers and Coordinate Boiler Inspections. N/A

2.12 Boiler Plant Calibration. N/A

2.13 Emergencies. N/A

2.14 Operational Considerations. N/A

3.0 Purchase of Fuels.

3.1 Fuel Oil. N/A

3.2 Natural Gas Distribution System. N/A

3.3 Other Fuels. N/A

4.0 Air Handling Units and Ventilation Systems.

4.1 Scope.

4.2 Repair of Air Conditioning Systems. The Contractor shall provide Air Conditioning repair services. Perform repair and/or replacement of A/C systems to include: window units and portable units installed by DPW, package units, split systems to include A/C systems that are installed in ventilation systems, A/C systems controls and humidifiers In the event of a power outage various systems may require manual restart. Recover and reclaim all oils and refrigerants encountered during repair and or disposal, installation, and replacement of equipment. Disposal of refrigerants must meet disposal guidelines set by FWA DPW Environmental Office. Contractor will service equipment and maintain refrigerant recovery and replacement records in accordance with 40 CFR Part 82 Subparts F and G and the Installation's air quality operating permit (Alaska Department of Environmental Conservation Permit #AQ0236TVP02). Refrigerant recovery and replacement records will be reported to the Installation's DPW Environmental Division at the end of each calendar quarter. List of HVAC systems can be located in TE 28.