This is a construction drawing set for the B.141 Generator Replacement project at Naval Station New London in Groton, Connecticut. The project involves replacing an existing 30kW generator with a new 300kW standby generator and associated electrical infrastructure, with work documented under EPROJECT NO. 1904124 and TASK ORDER NO. N40085-26-F-0821. The drawings are issued for construction dated August 13, 2026, and are prepared in accordance with Naval Facilities Engineering Systems Command (NAVFAC) standards by Colby Company Engineering.

The scope includes site preparation with contractor laydown areas, civil work encompassing a new concrete equipment pad (approximately 23'-8" × 6'-10" with a 2,050-gallon sub-base tank), electrical ductbank routing from the generator to Building 141, and comprehensive erosion and sedimentation controls. Interior work is limited to new electrical conduit installations on the first, second, and third floors connecting to existing panels E21A, MDP3, and new Emergency Distribution Panel EDP. The electrical design incorporates a new 45kVA 480V:208/120V transformer, a 400A automatic transfer switch, and temporary generator docking station provisions during construction. The project includes four construction phases requiring cutover to temporary power while the existing generator is demolished and the new 300kW unit is installed. Historic resource protection is mandated for both Buildings 141 and 156, with requirements for careful handling to preserve facade construction and other historic fabric. The contract requires utility coordination including DigSafe notification, temporary stabilization measures within 7 days of soil disturbance, and comprehensive inspection and maintenance protocols for erosion controls throughout the contract period.

View the file

Other files

File Type Posted
(M) NEPA_EV_Checklist_1904124_B141 Generator.pdf PDF
(C) CT Wage Determination.pdf PDF
(H) Map to B135.pdf PDF
(I) General Requirements.pdf PDF
(A) Groton B. 141 - Specifications - Final.pdf PDF
(J) RFI Form.pdf PDF
(F) Guide to Taxes.pdf PDF
(L) 52.204-24.pdf PDF
(G) Sales Tax Exempt.pdf PDF
(D) ECMS.pdf PDF
(E) CERT-141.pdf PDF
(K) Price Proposal Form.pdf PDF
RFP ASM00803446.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.141 GENERATOR REPLACEMENT

EPROJECT NO. 1904124

TASK ORDER NO. N40085-26-F-0821

NAVAL STATION NEW LONDON

GROTON, CT

DETAIL IS REFERENCED

SECTION IS REFERENCED

ELEVATION IS REFERENCED

SHEET NUMBER WHERE

DETAIL LETTER OR NUMBER

REFERENCES

ADDITIONAL SHEET

C-102

SHEET NUMBER WHERE

REFERENCES

ADDITIONAL SHEET

INDICATES DIRECTION

OF CUTTING PLANE

ELEVATION LETTER OR NUMBER

REFERENCES

ADDITIONAL SHEET

SHEET NUMBER WHERE

SECTION LETTER OR NUMBER

OF CUTTING PLANE

INDICATES DIRECTION

C-102

C-102

A A-000

A A-000

A A-000

BLOCK

ISLAND

LONG ISLAND

LONG ISLAND SOUND

PROVIDENCE

HARTFORD

MA

NY

N.J.

CT

HU

DS

ON

R

IV

ER

CO

NN

EC

TI

CU

T

RI

VE

R

RI

NYC

BOSTON

CONCORD

BRATTLEBORO

NH

VT

NJ

ME

PORTLAND

VICINITY MAP

NTS

NAVAL STATION

NEW LONDON

ELEVATION, SECTION OR DETAIL SYMBOLS

ELEVATION

SECTION

DETAIL

CAMPUS MAP

NTS

PROJECT

LOCATION

Signature Date

QUALITY CONTROL REVIEW

8/1 7/2

6 8

:15 :59

A M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

X G-

1.D

W G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

G-001

CO

VE

R

SH

EE

T

12952097

ACY KBLACY

AS NOTED

NSEDECIL

BENJAMIN C.

TOWNSEND

No.13287

OFETATS

MAINE

N LAOISSEFOR

P

ENGINEE

R

08/13/26

SED

8/1 4/2

6 1

0:1 8:3

9 A M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

X G-

1.D

W G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

G-002

IN

DE

X

OF

S

HE

ET

S

12952098

ACY KBLACY

XXX

AS NOTED

LIST OF DRAWINGS

DWG. NO. SHEET NO. NAVFAC NO. DRAWING TITLE

1 G-001 12952097 COVER SHEET

2 G-002 12952098 INDEX OF SHEETS

3 G-101 12952099 SITE ACCESS AND CONTRACTOR LAYDOWN AREA

4 C-001 12952100 CIVIL GENERAL NOTES, LEGEND, AND ABBREVIATIONS

5 CJ101 12952101 EXISTING CONDITIONS PLAN

6 CD101 12952102 SITE DEMOLITION PLAN

7 C-101 12952103 SITE LAYOUT AND UTILITY PLAN

8 C-501 12952104 EROSION AND SEDIMENTATION CONTROL NOTES AND DETAILS

9 C-502 12952105 CIVIL CONSTRUCTION AND UTILITY DETAILS

10 A-001 12952106 GENERAL NOTES, ABBREVIATIONS, AND LEGEND

11 A-101 12952107 FIRST FLOOR PLAN

12 A-102 12952108 SECOND FLOOR PLAN

13 E-001 12952109 ELECTRICAL LEGEND, ABBREVIATIONS & GENERAL NOTES

14 ED101 12952110 ELECTRICAL DEMOLITION CRAWL SPACE PLAN

15 ED102 12952111 ELECTRICAL DEMOLITION FIRST FLOOR PLAN

16 E-101 12952112 ELECTRICAL NEW WORK CRAWL SPACE PLAN

17 E-102 12952113 ELECTRICAL NEW WORK FIRST FLOOR PLAN

18 E-103 12952114 ELECTRICAL NEW WORK THIRD FLOOR PLAN

19 E-601 12952115 208V DEMOLITION ONE-LINE DIAGRAM

20 E-602 12952116 208V NEW WORK ONE-LINE DIAGRAM

21 E-603 12952117 480V DEMOLITION ONE-LINE DIAGRAM

22 E-604 12952118 480V NEW WORK ONE-LINE DIAGRAM

23 E-605 12952119 SCHEDULES - PANEL E21A AND EDP

NSEDECIL

BENJAMIN C.

TOWNSEND

No.13287

OFETATS

MAINE

N LAOISSEFOR

P

ENGIN

EE

R

08/13/26

SED

P ie r

P ie r

P ie r

P ie r

P ie r

P ie r

P ie r

C

P

W P

P

U

TL

B

P

IE

R

P

IE

R

P

IE

R

0B

8A

9 57

8A

8A

7B

D

P A

V E

A -1

7A

R T6

W R

PG

R

5A

K

V S

U B

K

V S

U B

K

V S

U B

K

V S

U B

K

V S

U B

K

V S

U B

K

V S

U B

K

V S

U B

K

V S

U B

7A

P S

-A x

7A

4-

O W

S

C

P

P S

P S

4A

F U

E L

C E

LL

P

LA

N

T M

M H

F U

E L

C E

LL

P

LA

N

T M

M H

Tang Ave

Ta ng

Av e

2A

9-

O W

S

O .T

-1 3O

.T -1

G at e

Cr ys ta l L ak e

Rd

PROVIDENCE & WORCHESTER R.R.

LAKE

ROCK

GOSS

COVE

T H A M E S R I V E R

L E D Y A R D G R O T O N

A M B E R J A C K R D A L B A C O R E R D

A L B A C O R E R D

A M B E R J A C K R D

A M B E R J A C K R D

A R G O N A U T R D

BULLHEAD CAPELIN CISCO RD

CISCO RD

CISCO RD

BONEFISH

BARBEL

CORVINA RD

DORADO RD

DEP

LO

YE

D PA

RKIN

G

SCAMP AVE

SW

ORDFISH AVE

SNOOK AVE

SEAWOLF AVE

SEALION AVE

ESCOLAR AVE

RU

NN

ER

AVE

S H A R K B L V D

W A H O O A V E

T A U T

O G A V E

T A U T O G A V E

CONGER AVE

CORSAIR AVE

THRESHER AVE THRESHER AVE

RASHER AVE

C O N N R O U T E 1 2

C O N N R O U T E 1 2

C R

Y S

T A L

L A

K E

R D

MILITARY HIGHWAY

T A U T O G A V E

RASHER

AVE

TANG AVE

TA

NG

A

VE

SCULPIN AVE

TANG AVE

GRAYBACK AVE

GUDGEON AVE

GR

OW

LE

R

AV

E

TR

IG

GE

R

AV

E

GRENADIER AVE

KETE AVE

GRAYLING AVE

HERRING

GRUNNION AVE

PICKEREL AVE

TROUT AVE

PERCH AVE

SCORPIONAVE

LA

GA

RT

O

AV

E

ROBALO AVE

MAIN GATE AND CONTRACTOR SITE ACCESS

BUILDING 141

CONTRACTOR

LAYDOWN AREA

CONTRACTOR

LAYDOWN AREA

CONTRACTOR

LAYDOWN AREA

GRAYLING AVE

SCORPION AVE S H A R K B L V D

FL

AS

HE

R

AV

E

HARDER AVE

WORK AREA

8/1 7/2

6 3

:07 :21

P M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

G-

1.D W

G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

G-101

SI

TE

A

CC

ES

S

AN

D

CO

NT

RA

CT

OR

LA

YD

OW

N

AR

EA

12952099

HLS LDAMAF

AS NOTED

20'0' 1"=10'

10'SCALE:A1 SITE ACCESS AND CONTRACTOR LAYDOWN AREA

1" = 10'

NOTES:

1. THE LOCATION OF THE CONTRACTOR LAYDOWN

AREA WILL BE FINALIZED AFTER CONTRACT AWARD

SED

7/2

6 3

:09 :24

P M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

C-

1.D W

G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

C-001

CI

VI

L G

EN

ER

AL

N

OT

ES

, L

EG

EN

D, A

ND

A

BB

RE

VI

AT

IO

NS

12952100

HLS LDAMAF

AS NOTED

TRAFFIC CONTROL NOTES:

1. MAINTAIN EXISTING TRAFFIC CONTROL SIGNAGE AND INFORMATIONAL SIGNS DURING THE WORK.

2. PROVIDE POST MOUNTED TRAFFIC CONTROL AND INFORMATIONAL SIGNS IN ACCORDANCE WITH THE MANUAL OF

UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS, AS PUBLISHED BY USDOT-FHWA, LATEST EDITION.

GENERAL NOTES:

1. IF AN EXISTING TBM IS BEING DISTURBED AS A PART OF THIS PROJECT, THEN THE CONTRACTOR MUST RELOCATE THE

EXISTING TBM UNDER THE SUPERVISION OF A LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. DIMENSIONS ARE TO FACE OF CURB, AND TO FACE OF FOUNDATION, EDGE OF PAVEMENT, AND CENTERLINE OF MARKINGS, UNLESS

OTHERWISE INDICATED.

2. PAVEMENT EDGES MUST BE TRUE TO LINE. SAWCUT EXISTING PAVEMENT IN SMOOTH STRAIGHT LINE; WHERE NEW

PAVEMENT JOINS EXISTING, PROVIDE TACK COAT LAYER AS SPECIFIED.

3. VERIFY EXISTING CONDITIONS AND DIMENSIONS AND REPORT DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO STARTING WORK. VERIFY SITE CONDITIONS INCLUDING TEST PITS FOR LOCATIONS AND INVERTS OF UTILITIES AND REPORT DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO PROCEEDING WITH THAT PORTION OF THE WORK.

4. COORDINATE WITH CONTRACTING OFFICER TO SCHEDULE A MEETING WITH THE NAVFAC GROUP AND THE FIRE CHIEF WITHIN 14 DAYS OF CONTRACT AWARD TO REVIEW ACCESS FOR FIRE AND RESCUE VEHICLES; AND AT REGULAR INTERVALS AS DETERMINED BY CONTRACTING OFFICER AND FIRE CHIEF THROUGHOUT THE DURATION OF THE PROJECT.

SUBMIT MEETING MINUTES.

5. SCHEDULE REMOVAL OF STORM DRAIN INFRASTRUCTURE WHEN PRECIPITATION IS NOT ANTICIPATED. SOIL DISTURBANCE MUST BE IN CONFORMANCE WITH THE EARTHWORK SPECIFICATION (31 00 00) AND NAVAL SUBMARINE

BASE NEW LONDON SOIL MANAGEMENT STANDARD OPERATING PROCEDURES.

6. PROVIDE TEMPORARY PERSONNEL BARRIERS (6 FT HIGH FENCING) AS REQUIRED TO KEEP PERSONNEL AT A SAFE

DISTANCE FROM THE CONSTRUCTION AREA.

UTILITY NOTES:

EXISTING UTILITIES SHOWN ARE APPROXIMATE ONLY AND BASED ON FIELD SURVEYS, AVAILABLE RECORDS, AND/OR PHYSICAL FEATURES. PRIOR TO COMMENCING ANY EXCAVATION OR GROUND PENETRATING WORK, LOCATE UNDERGROUND UTILITIES.

1. STATION LOCATING SERVICE SUCH AS "DIGSAFE" MUST BE DONE IN ORDER TO COMPLETE WORK. COORDINATE WITH CONTRACTING OFFICER. VERIFY ON-SITE UTILITIES AND HAVE THEM MARKED OUT BY A THIRD PARTY UTILITY LOCATOR SERVICE PRIOR TO THE START OF CONSTRUCTION. DETERMINE THE ELEVATIONS OF EXISTING UTILITIES AND UNDERGROUND OBSTRUCTIONS INDICATED AS EXISTING TO REMAIN IN LOCATION TO BE TRAVERSED BY NEW UTILITIES AND OTHER WORK PROVIDED HEREIN BEFORE NEW WORK IS LAID CLOSER THAN THE NEAREST MANHOLE OR OTHER STRUCTURE WHICH AN ADJUSTMENT IN GRADE COULD BE MADE. WHERE DIG PERMITS ARE REQUIRED, OBTAIN PERMITS

AND NOTIFY THE CONTRACTING OFFICER 30 CALENDAR DAYS PRIOR TO ANY EXCAVATION.

2. MAINTAIN MARKINGS MADE DURING THE UTILITY INVESTIGATION THROUGHOUT THE LENGTH OF THE CONTRACT.

3. NOTIFY "DIG SAFE" (811) WITHIN 14 CALENDAR DAYS, BUT NO MORE THAN 30 DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR GROUND PENETRATING ACTIVITY. FULLY COMPLY WITH THE STATE OF CONNECTICUT "DIG SAFE" LAW.

PREPARE A "DIG SAFE" UTILITY REQUEST FORM" AT LEAST 14 CALENDAR DAYS PRIOR TO EXCAVATION AND SUBMIT FORM

TO THE CONTRACTING OFFICER.

4. WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CONCRETE, BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY, INDEPENDENT, PRIVATE LOCATING COMPANY, MUST LOCATE UTILITY DEPTH BY USE OF GROUND PENETRATING RADAR (GPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. USE OUTAGES TO ISOLATE UTILITY SYSTEMS IN CIRCUMSTANCES WHERE UTILITIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF HISTORICAL DRAWINGS

DOES NOT ALLEVIATE THE CONTRACTOR FROM MEETING THIS REQUIREMENT.

5. VERIFY EXISTING UTILITY INFORMATION AND TIE-IN LOCATIONS NEEDED TO CONSTRUCT NEW UTILITY SYSTEMS AND SITE IMPROVEMENTS. VERIFICATION METHODS MUST INCLUDE, BUT NOT BE LIMITED TO, TEST PITS AND CCTV TO VERIFY LOCATION, ELEVATION, SIZE, MATERIAL, AND ANY OTHER INFORMATION REQUIRED TO COMPLETE WORK.

6. TAKE THE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES. DAMAGE TO THE UTILITIES MUST BE

IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE.

7. COMPLIANCE WITH THE PROVISIONS OF THE GOVERNMENT, STATE AND UTILITY FOR UNDERGROUND UTILITY DAMAGE PREVENTION IS REQUIRED. THE GOVERNMENT MUST BE HELD HARMLESS AGAINST ANY LOSS, DAMAGES AND CLAIMS OF

ANY NATURE WHATSOEVER ARISING OUT OF FAILURE TO COMPLY WITH SAID PROVISIONS.

8. COORDINATE UTILITY OUTAGES WITH THE CONTRACTING OFFICER. FOR ANTICIPATED UTILITY OUTAGES, PREPARE AN APPLICATION FOR THE OUTAGE RISK ASSESSMENT PROCESS AND PROVIDE IT TO THE CONTRACTING OFFICER 30 DAYS

PRIOR TO THE PLANNED OUTAGE.

9. ADJUST SEWER, DRAIN AND ELECTRIC POWER MANHOLES, FRAMES AND GRATES OR COVERS TO MATCH FINISH GRADE.

PROVIDE FRAMES AND GRATES OR COVERS IF EXISTING ITEMS ARE DAMAGED DURING THE COURSE OF THE WORK.

REPLACEMENT ITEMS WILL BE AT THE CONTRACTOR'S EXPENSE, UNLESS OTHERWISE NOTED.

GRADING NOTES:

1. MAINTAIN TEMPORARY EROSION CONTROL MEASURES FOR THE FULL DURATION OF CONSTRUCTION. INSPECT WEEKLY

AND BEFORE AND AFTER EACH STORM AND REPAIR AS NEEDED. REMOVE SEDIMENTS FROM THE SITE. PLACE IN AREA OF

LOW EROSION POTENTIAL, AND STABILIZE WITH SEED AND MULCH.

2. PLACE TEMPORARY SOIL STABILIZATION WITHIN 14 DAYS OF INITIAL DISTURBANCE OR PRIOR TO STORM EVENT. PLACE

PERMANENT SOIL STABILIZATION WITHIN 7 DAYS OF FINAL GRADING.

3. CLEAN SEDIMENTS FROM EXISTING STORM DRAIN PIPES AND CATCH BASINS MONTHLY & AFTER MAJOR STORM EVENTS.

4. PLACE EXCAVATED MATERIAL FROM TRENCHES UPGRADIENT FROM EXCAVATIONS TO LIMIT LENGTHS OF SILT FENCE OR

FILTER SOCKS.

CONSTRUCTION EXCAVATION NOTES:

1. EXCAVATION MUST CONFORM TO APPLICABLE OSHA, EM 385-1-1, NAVAL SUBMARINE

BASE NEW LONDON SOIL MANAGEMENT STANDARD OPERATING PROCEDURES, AND

REQUIREMENTS OF 31 00 00 EXCAVATION AND FILL SPECIFICATION. EXCAVATIONS MUST

BE CLOSED AS SOON AS WORK WITHIN THE EXCAVATION IS COMPLETE. EXCAVATED

MATERIALS MUST NOT BE ALLOWED TO SPREAD IN AN UNCONTROLLED MANNER OR

BECOME CONTAMINATED WITH OTHER DEBRIS.

2. PURSUANT TO NAVAL SUBMARINE BASE NEW LONDON SOIL MANAGEMENT STANDARD

OPERATING PROCEDURES, IF ANY SIGNS OF CONTAMINATION, INCLUDING VISIBLE STAINING

OR CHEMICAL/PETROLEUM ODORS, ARE NOTED DURING EXCAVATION, EXCAVATION

OPERATIONS MUST IMMEDIATELY CEASE, AND THE PWD ENVIRONMENTAL DIVISION (EV)

INSTALLATION RESTORATION (IR) PROGRAM MANAGER MUST BE NOTIFIED.

3. HARD MATERIAL AND ROCK EXCAVATION: REMOVE HARD MATERIAL AND ROCK TO

ELEVATIONS INDICATED IN A MANNER THAT LEAVES FOUNDATION MATERIAL IN AN

UNSHATTERED AND SOLID CONDITION. BLASTING IS NOT ALLOWED. ROUGHEN LEVEL

SURFACES AND CUT SLOPED SURFACES INTO BENCHES FOR BOND WITH CONCRETE.

PROTECT SHALE FROM CONDITIONS CAUSING DECOMPOSITION ALONG JOINTS OR

CLEAVAGE PLANES, AND OTHER TYPES OF EROSION.

4. PROVIDE TRAFFIC CONTROL AND INFORMATIONAL SIGNS IN ACCORDANCE WITH THE

MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS, AS PUBLISHED BY

USDOT-FHWA, LATEST EDITION.

5. BARRICADES AND WARNING DEVICES MUST BE PROVIDED IN A GOOD STATE OF REPAIR.

6. UNNATURAL FILL MATERIALS/INDUSTRIAL DEBRIS IS SOIL CONTAINING BURIED DEBRIS FROM INDUSTRIAL OPERATIONS; MATERIALS INCLUDE, BUT ARE NOT LIMITED TO, METAL, PLASTIC, BRICK, CONCRETE, WOOD, CONTAINERS, GLASS, AND MATERIALS WITH UNUSUAL COLOR OR

ODOR. UPON DISCOVERY OF SUCH MATERIALS, NOTIFY THE CONTRACTING OFFICER, WHO

WILL ARRANGE FOR THE NAVFAC ENVIRONMENTAL DIVISION TO INSPECT THE MATERIALS.

SS

SD

GAS

W

UGE

UGC

OIL

CHAIN LINK FENCE

GUARDRAIL

SEWER LINE

DRAIN LINE

PROPANE LINE

WATER LINE

UNDERGROUND ELECTRIC LINE

UNDERGROUND COMMUNICATION LINE

UNDERGROUND FUEL LINE

REFERENCE DRAWING DRAIN LINE

REFERENCE DRAWING SEWER LINE

REFERENCE DRAWING WATER LINE

REFERENCE DRAWING ELECTRIC LINE

REFERENCE DRAWING COMMUNICATION LINE

REFERENCE DRAWING FUEL LINE

REFERENCE DRAWINGS INDUSTRIAL WASTE LINE

MAJOR CONTOUR LINE

MINOR CONTOUR LINE

LIGHT POLE W/ CONC BASE

SEWER MANHOLE

CLEANOUT

YARD DRAIN

DRAIN MANHOLE

FIRE HYDRANT

WATER GATE VALVE

POST INDICATOR VALVE

WATER METER

COMMUNICATIONS MANHOLE

PAD MOUNTED TRANSFORMER

ELECTRIC MANHOLE

ELECTRIC HANDHOLE

COMMUNICATIONS HANDHOLE

BOLLARD

DECIDUOUS TREE

MONITORING WELL (MW)

GAS VALVE

HOSE REEL

BUILDING

OVERHANG

CONCRETE

CONCRETE CURB

EDGE OF PAVEMENT

RETAINING WALL

EXISTING LEGEND

DEMOLITION LEGEND

UTILITIES, FENCES,

STONE WALLS, ETC

AREAS (PAVED, GRAVEL,

VEGETATION, ETC)

W

ABBREVIATIONS:

RD

CF

CFS

CI

CMP

CONN

CIPP

CIP

CB

BLDG

BTWN

BOT

B/FTG, BOF

GALV

CORRUGATED METAL PIPE

CUBIC FEET PER SECOND

BOTTOM OF FOOTING

CAST IRON

CONNECTION

CUBIC FEET

CEMENT LINED

CAST-IN-PLACE OR CAST IRON PIPE

CATCH BASIN

BOTTOM

BUILDNG

BETWEEN

FTG

G

FLG

FT

FLR

FF

FDN

ES

EW

EXT

EXP

EL, ELEV

EQUIP

EQ

(E), EX, EXIST

EA

& AND

DIA OR Ø

DIM

DWG

DIP

NO OR #

GALVANIZED

EACH

FLANGE

FOOTING

FLOOR

FOOT

GAUGE

FINISH FLOOR

FOUNDATION

EACH WAY

EXTERIOR

EXPANSION

EXISTING

EQUIPMENT

EQUAL

ELEVATION

MISC

OC

OPNG

NP

MAX

MFR

MIN

LE

MH

OPENING

MISCELLANEOUS

NO PARKING

NUMBER

ON CENTER

LAW ENFORCEMENT

MANHOLE

MAXIMUM

MANUFACTURE

MINIMUM

DIAMETER

DIMENSION

DRAWING

DUCTILE IRON PIPE

LB

HOR, HORIZ HORIZONTAL

POUND

ROOF DRAIN

SMH

STR

ST

SCH

SF

SHT

S

SANITARY MANHOLE

STRAIGHT

STEAM

SCHEDULE

SHEET

SLOPE

SQUARE FEET

F FOOTING DESIGNATION

FV FIELD VERIFY

IN

INFO

INCH

INFORMATION

JT JOINT

MECH MECHANICAL

DMH DRAINAGE MANHOLE

OPP OPPOSITE

SECT SECTION

SLD STIFF LEG DERRICK

SPAC SPACING

SPECS SPECIFICATIONS

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

T TOP

TF TOP OF FRAME

TOP TOP OF PIPE

UNO UNLESS NOTED OTHERWISE

UD UNDERDRAIN

VER, VERT VERTICAL

VIF VERIFY IN FIELD

W/O W/

WITHOUT

WITH

WP WORK POINT

WT WEIGHT

CIA CONTROLLED INDUSTRIAL AREA

DEMO DEMOLISH

FW FRESH WATER

LF LINEAR FEET

FEAD FACILITY ENGINEERING ACQUISITION DIVISION

HWSF HAZARDOUS WASTE STORAGE FACILITY

TBM TEMPORARY BENCH MARK

BM BENCHMARK

CO CLEANOUT

CONC CONCRETE

FHWA FEDERAL HIGHWAY ADMINISTRATION

MW MONITORING WELL

IR INSTALLATION RESTORATION

SWL SINGLE WHITE LINE

SYL SINGLE YELLOW LINE

DC DIRECT CURRENT

AC ALTERNATING CURRENT

W WATTS

SS SANITARY SEWER

DYL DOUBLE YELLOW LINE

SD STORM DRAIN

VP VERTICAL PIPE

AB ABANDONED

SSF SANITARY SEWER FORCE MAIN

SSG SANITARY SEWER GRAVITY

REQ, REQDREQUIRED

AS AUTO SPRINKLER

VIT VITRIFIED CLAY PIPEID INSIDE DIAMETER

STM STEAM

DDT DRAINABLE-DRYABLE-TESTABLE

COND CONDUIT

CA COMPRESSED AIR/AIR

OD OUTSIDE DIAMETER

ELECTRICAL SWITCH

CCTV CLOSED CIRCUIT TELEVISION

VCP VITREOUS CLAY PIPE

MSL MEAN SEA LEVEL

STA STATION

N NORTHING

E EASTING

MP METAL PLATE

EP EDGE OF PAVEMENT

EM ELECTRICAL METER

EB ELECTRICAL BOX

EOI END OF INVESTIGATION

GRAN GRANITE

HTFP HEAT TRACE FREEZE PANEL

HP HIGH PRESSURE

HPCA HIGH PRESSURE COMPRESSED AIR

HW HOT WATER

I OR INV INVERT ELEVATION

(R) RECORD

R, RIM RIM ELEVATION

RCP REINFORCED CONCRETE PIPE

SBB SLOPED BITUMINOUS BERM

U UNKNOWN

UNK UNKNOWN UTILITY

VCC VERTICAL CONCRETE CURB

VGC VERTICAL GRANITE CURB

P.C. POINT OF CURVATURE

P.I. POINT OF INTERSECTION

P.R.C. POINT OF REVERSE CURVATURE

PIV POST INDICATOR VALVE

POC POINT OF CONNECTION

PREFAB PREFABRICATION

PS PHYSICAL SECURITY

PSF POUNDS PER SQUARE FEET

PSI POUNDS PER SQUARE INCH

P.T. POINT OF TANGENCY

PVC POLYVINYL CHLORIDE

PW PURE WATER

PWD PUBLIC WORKS DEPARTMENT

BMP SEE (C-502)

SIM SIMILAR

CR CONDENSATE RETURN

DDYL DOUBLE DASHED YELLOW LINE

HDPE HIGH DENSITY POLYETHYLENE PIPE

NTS NOT TO SCALE

TYP TYPICAL

AFG ABOVE FINISHED GRADE

C CHILLER

S

CO

D

DY

H

WV

P I V

WM

C

T

E E

C

MW

GV

ASPHALT PAVEMENT

PAVEMENT SAWCUT

CONCRETE

BUILDING ADDITION

OVERHANG/ CANOPY

RIPRAP

LOAM AND SEED

CATCH BASIN

DRAIN LINE

WATER GATE VALVE

WATER LINE

UNDERGROUND ELECTRICAL

ELECTRIC HANDHOLE

LIGHT W/ CONC BASE

POST INDICATOR VALVE (PIV)

TREES

SEDIMENT BARRIER

INLET PROTETION

PROPOSED LEGEND

D

W

UGE

E

SD

UGC

OIL

S

W

UGE

IW

TEMP TEMPERATURE

IW INDUSTRIAL WASTE

C.J. CONTROL JOINT

SED

DS

DS

DS

EM

(2)ES

W V

DSTH=78.7'

6" PVC INV.=76.4'

6" PVC INV.=76.4'

6" PVC INV.=76.6'

10" PVC INV.=76.5'

RD

TH=78.0'

FF=78.0'

W V

TBM 9702C

MAG NAIL SET IN

CONC. LIGHT POLE BASE

ELEV.=68.26'

RD

FF=68.2'

RD RD

ANCHOR IN

CONC

UGE

UGE

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UTILITY HATCH

CONTAINS 120V ELECTRICAL

OUTLET & POSSIBLE SEWER

CLEANOUT

W

W

W

W W

W

W

COMM

COMM

COMM

COMM

COMM

COMM

DMH 1201

R=67.6'

(A) 12" RCP I=64.2'

GENERATOR

ON CONC. PAD

6" PVC

FUEL TANK

ON CONC. PAD

METAL GRATE

CONC STEP

CONC

RETAINING

WALL

CONC

RETAINING

WALL

BUILDING 141

OHE OHEOHE OHE

CONDUIT

8" PVC

10" PVC

6" PVC

TRENCH

DRAIN

SYL

SY

L

VCC

VCC

VCC

VCC

EP

78.6'

61.6'

64.7'

70.8'

70.6'

WOOD

RAMP

CONDUIT ALONG

BUILDING FACE

CONC

OVERHANG

CONC

UG

E

U G

E

U G

E

GRAVEL

BUILDING 156

SD

TMB 9702D

MAG NAIL SET IN CONC.

ELEV.=79.35'

BUILDING 141

SHED

SD

SCALE:A1 EXISTING CONDITIONS PLAN

1" = 10'

8/1 7/2

6 3

:12 :11

P M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

CJ

1.D W

G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

20'0' 1"=10'

10'

1. EXISTING CONDITIONS DATA IS COMPILED FROM SITE SURVEY DATA

COMPLETED BY SAM, LLC ON 05/2720/26, SITE INVESTIGATIONS, AERIAL

PHOTO DATA, AND OWNER PROVIDED INFORMATION.

2. THE SITE SURVEY HAS BEEN PREPARED AS A T-1 TOPOGRAPHIC

SURVEY IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION

20-300B-14 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES

(R.C.S.A.), LAST REVISED 2018-10-26.

3. FIELD SURVEY PERFORMED BY SAM LLC DURING MAY 2026 USING A

TOTAL STATION AND A SURVEY GRADE GPS WITH A DATA COLLECTOR

AND AN AUTO LEVEL. TRAVERSE ADJUSTMENT BASED ON LEAST

SQUARE ANALYSIS.

4. HORIZONTAL DATUM BASED ON CONNECTICUT STATE PLANE

NAD83(2011).

5. VERTICAL DATUM IS BASED ON APPROXIMATE NAVD88(GEOID18) (±.2')

DERIVED FROM REDUNDANT GPS OBSERVATIONS UTILIZING THE

KEYNET GPS VRS NETWORK.

6. PROPER FIELD PROCEDURES WERE FOLLOWED IN ORDER TO

GENERATE CONTOURS AT 2' INTERVALS. ANY MODIFICATION OF THIS

INTERVAL WILL DIMINISH THE INTEGRITY OF THE DATA, AND SAM LLC

WILL NOT BE RESPONSIBLE FOR ANY SUCH ALTERATION PERFORMED

BY THE USER.

7. UNDERGROUND UTILITIES AND INVERTS SHOWN HEREON ARE BASED

ON INFORMATION PROVIDED BY FELDMAN GEOSPATIAL AND THEIR

MARKINGS OBSERVED ON-SITE.

GENERAL NOTES

LEGEND

MAJOR CONTOUR LINE

MINOR CONTOUR LINE

STORM DRAIN LINE

WATER LINE

UNDERGROUND ELECTRIC LINE

WALL MOUNTED ELECTRIC LINE

COMMUNICATIONS LINE

UNKNOWN UNDERGROUND UTILITY

BOLLARD

LIGHT POST

FIRE HYDRANT

WATER GATE VALVE

WENT PIPE

PAD MOUNTED TRANSFORMER

ELECTRIC BOX

AIR CONDITIONING UNIT

CATCH BASIN

DRAIN MANHOLE

TREE STUMP

RETAINING WALL

CONCRETE

LEDGE OUTCROP

GRAPHIC SCALE(S)

CJ101

EX

IS

TI

NG

C

ON

DI

TI

ON

S

PL

AN

12952101

HLS LDAMAF

XXX

AS NOTED

SD

W

UGE

OHE

COMM

SED

DS

DS

EM

(2)ES

W V

DSTH=78.7'

6" PVC INV.=76.4'

6" PVC INV.=76.4'

6" PVC INV.=76.6'

10" PVC INV.=76.5'

RD

TH=78.0'

FF=78.0'

W V

TBM 9702C

MAG NAIL SET IN

CONC. LIGHT POLE BASE

ELEV.=68.26'

RD

FF=68.2'

RD RD

ANCHOR IN

CONC

UGE

UGE

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UTILITY HATCH

CONTAINS 120V ELECTRICAL

OUTLET & POSSIBLE SEWER

CLEANOUT

W

W

W

W W

W

W

COMM

COMM

COMM

COMM

COMM

COMM

DMH 1201

R=67.6'

(A) 12" RCP I=64.2'

GENERATOR

ON CONC. PAD

6" PVC

FUEL TANK

ON CONC. PAD

METAL GRATE

CONC STEP

CONC

RETAINING

WALL

CONC

RETAINING

WALL

BUILDING 141

OHE OHEOHE OHE

CONDUIT

8" PVC

10" PVC

6" PVC

TRENCH

DRAIN

SYL

SY

L

VCC

VCC

VCC

VCC

EP

78.6'

61.6'

64.7'

70.8'

70.6'

WOOD

RAMP

CONDUIT ALONG

BUILDING FACE

CONC

OVERHANG

CONC

UG

E

U G

E

U G

E

GRAVEL

BUILDING 156

SD

TMB 9702D

MAG NAIL SET IN CONC.

ELEV.=79.35'

BUILDING 141

SHED

SD

REMOVE GENERATOR AND CONCRETE PAD

REMOVE ABOVE GROUND FUEL TANK

AND CONCRETE PAD, CONTRACTOR

MUST REMOVE FUEL IN TANK

REMOVE

ELECTRICAL

DUCTBANK

TEMPORARY 30KW PORTABLE GENERATOR WITH A 95

GALLON MINIMUM FUEL TANK ON A TRAILER.

CONTRACTOR RESPONSIBLE TO REFILL FUEL TANK DAILY.

TEMPORARY GENERATOR DOCKING STATION

SCALE:A1 SITE DEMOLITION PLAN

1" = 10'

8/1 7/2

6 3

:13 :39

P M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

CD

1.D W

G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

20'0' 1"=10'

10'

SEE ELECTRICAL SHEETS ED102 AND E-102 FOR ELECTRICAL DEMOLITION AND

NEW WORK SCOPE.

PHASE-1:

1. INSTALL TEMPORARY GENERATOR DOCKING STATION (GDS).

2. ROUGH-IN INTERCONNECTION BETWEEN TEMPORARY GENERATOR

DOCKING STATION AND EXISTING AUTOMATIC TRANSFER SWITCH (ATS)

IN ELEC ROOM 110.

3. INSTALL NEW EMERGENCY DISTRIBUTION PANEL EDP, AUTOMATIC

TRANSFER SWITCH (ATS) AND TRANSFORMER.

4. INSTALL NEW FEEDERS TO EXISTING EMERGENCY PANEL E21A,

EXISTING PANEL MDP-3, NEW EMERGENCY DISTRIBUTION PANEL EDP

AND NEW AUTOMATIC TRANSFER SWITCH.

PHASE-2:

*PHASE 2 CANNOT BEGIN UNTIL NEW GENSET IS ONSITE

1. CUTOVER TO TEMPORARY 30KW PORTABLE GENERATOR POWER.

2. DEMOLISH EXISTING 30KW GENERATOR.

3. DEMOLISH EXISTING FEEDERS TO EXISTING EMERGENCY PANEL E21A,

EXISTING PANEL MDP-3, AND EXISTING AUTOMATIC TRANSFER SWITCH.

4. DEMOLISH EXISTING AUTOMATIC TRANSFER SWITCH.

5. CONNECT NEW FEEDERS TO EXISTING EMERGENCY PANEL E21A,

EXISTING PANEL MDP-3, NEW EMERGENCY DISTRIBUTION PANEL EDP

AND NEW AUTOMATIC TRANSFER SWITCH.

PHASE-3:

1. INSTALL NEW 300KW GENERATOR.

2. REWORK EXISTING CONDUITS AND ROUTING FROM EXISTING

GENERATOR TO SERVE NEW GENERATOR.

3. INSTALL NEW FEEDER FROM NEW GENERATOR TO NEW AUTOMATIC

TRANSFER SWITCH (ATS).

PHASE-4:

1. CUTOVER TO PERMANENT STANDBY POWER VIA NEW 300KW

GENERATOR.

2. DEMOLISH TEMPORARY PORTABLE GENERATOR EQUIPMENT

(GENERATOR DOCKING STATION AND AUTOMATIC TRANSFER SWITCH

FEEDER).

PHASING AND SEQUENCE NOTES

GRAPHIC SCALE(S)

CD101

SI

TE

D

EM

OL

IT

IO

N

PL

AN

12952102

HLS LDAMAF

AS NOTED

SED

DS

DS

EM

(2)ES

W V

DSTH=78.7'

6" PVC INV.=76.4'

6" PVC INV.=76.4'

6" PVC INV.=76.6'

10" PVC INV.=76.5'

RD

TH=78.0'

FF=78.0'

W V

TBM 9702C

MAG NAIL SET IN

CONC. LIGHT POLE BASE

ELEV.=68.26'

RD

FF=68.2'

RD RD

ANCHOR IN

CONC

UGE

UGE

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UTILITY HATCH

CONTAINS 120V ELECTRICAL

OUTLET & POSSIBLE SEWER

CLEANOUT

W

W

W

W W

W

W

COMM

COMM

COMM

COMM

COMM

COMM

DMH 1201

R=67.6'

(A) 12" RCP I=64.2'

6" PVC

METAL GRATE

CONC STEP

CONC

RETAINING

WALL

CONC

RETAINING

WALL

BUILDING 141

OHE OHEOHE OHE

CONDUIT

8" PVC

10" PVC

6" PVC

TRENCH

DRAIN

SYL

SY

L

VCC

VCC

VCC

VCC

EP

78.6'

61.6'

64.7'

70.8'

70.6'

WOOD

RAMP

CONDUIT ALONG

BUILDING FACE

CONC

OVERHANG

CONC

UG

E

U G

E

GRAVEL

BUILDING 156

SD

TMB 9702D

MAG NAIL SET IN CONC.

ELEV.=79.35'

BUILDING 141

SHED

SD

UGE

UGE

C.

J.C.

J.

24.67'

7.83'

5'

2'

4'

7'

EQ EQ EQ

SCALE:A1 SITE LAYOUT AND UTILITY PLAN

1" = 10'

8/1 7/2

6 3

:16 :27

P M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

C-

1.D W

G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

20'0' 1"=10'

10'

MINIMUM DISTANCES:

1. 5' FROM BUILDING

2. 5' FROM HYDRANT

3. 3' FROM SIDEWALK

4. 1.5' BEHIND FACE OF CURB

GENERATOR SETBACK REQUIREMENTS

GRAPHIC SCALE(S)

C-101

SI

TE

LA

YO

UT

A

ND

U

TI

LIT

Y

PL

AN

12952103

HLS LDAMAF

AS NOTED

KEYNOTES

1. PROVIDE 300KW GENERATOR SET ENCLOSURE AND SUB-BASE TANK.

BASIS OF DESIGN FOOTPRINT: 23'-8" X 6'-10" 2,050 GAL SUB-BASE TANK,

SEE SHEET E-101

2. PROVIDE CONCRETE EQUIPMENT PAD WITH TWO TRANSVERSE

CONTROL JOINTS EQUALLY SPACED. CONCRETE PAD MUST BE SIZED

TO PROVIDE A MINIMUM OF 6" FROM THE EDGE OF THE GENERATOR TO

THE EDGE OF THE CONCRETE PAD. SEE DETAIL A1/C-502.

3. PROVIDE ELECTRICAL DUCTBANK FROM GENERATOR TO BUILDING 141,

SEE DETAIL A3/C-502

4. PROTECT TRENCH DRAIN WITH FILTER SOCK, SEE DETAIL A2/C-501

5. AIR INLET FOR GENERATOR

1. DIMENSIONS OF CONCRETE PAD DEPICTED ARE BASED ON BASIS OF

DESIGN GENSET WITH FOOTPRINT DIMENSIONS DESCRIBED IN KEY

NOTE 1 ON THIS SHEET.

GENERAL NOTES

SED

3/2

6 1

0:4 6:5

8 A M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

C-

1.D W

G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

X

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

C-501

ER

OS

IO

N

AN

D

SE

DI

ME

NT

AT

IO

N

CO

NT

RO

L N

OT

ES

A

ND

D

ET

AI

LS

HLS LDAMAF

AS NOTED

SOIL EROSION AND SEDIMENTATION CONTROL NOTES

EROSION AND SEDIMENTATION CONTROL FOR THIS PROJECT IS BASED UPON SOUND CONSERVATION PRACTICES, AND ADHERES TO THE STANDARDS DETAILED IN THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL" MANUAL DATED MARCH 2024. THE CONTRACTOR MUST BE FAMILIAR WITH THE AFOREMENTIONED PUBLICATION AND COMPLY WITH THE PRACTICES PRESENTED THEREIN.

A PERSON WHO CONDUCTS, OR CAUSES TO BE CONDUCTED, AN ACTIVITY THAT INVOLVES FILLING, DISPLACING OR EXPOSING SOIL OR OTHER EARTHEN MATERIALS MUST TAKE MEASURES TO PREVENT UNREASONABLE EROSION OF SOIL OR SEDIMENT BEYOND THE PROJECT SITE OR INTO A PROTECTED NATURAL RESOURCE MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS. MEASURES MUST REMAIN IN PLACE AND FUNCTIONAL UNTIL THE SITE IS PERMANENTLY STABILIZED. ADEQUATE AND TIMELY TEMPORARY AND PERMANENT STABILIZATION MEASURES

MUST BE TAKEN.

1 EROSION AND SEDIMENTATION CONTROL

1.1 POLLUTION PREVENTION: MINIMIZE DISTURBED AREAS AND PROTECT NATURAL DOWNGRADIENT BUFFER AREAS TO THE EXTENT PRACTICABLE. CONTROL STORMWATER VOLUME AND VELOCITY WITHIN THE SITE TO MINIMIZE SOIL EROSION. MINIMIZE THE DISTURBANCE OF STEEP SLOPES. CONTROL STORMWATER DISCHARGES, INCLUDING BOTH PEAK FLOW RATES AND VOLUME, TO MINIMIZE EROSION AT OUTLETS. THE DISCHARGE MAY NOT RESULT IN EROSION OF ANY OPEN DRAINAGE CHANNELS, SWALES, STREAM CHANNELS OR STREAM BANKS, UPLAND, OR COASTAL OR FRESHWATER WETLANDS OFF THE PROJECT SITE. WHENEVER PRACTICABLE, NO DISTURBANCE ACTIVITIES MUST TAKE PLACE WITHIN 50 FEET OF ANY PROTECTED NATURAL RESOURCE. IF DISTURBANCE ACTIVITIES TAKE PLACE BETWEEN 30 FEET AND 50 FEET OF ANY PROTECTED NATURAL RESOURCE, AND STORMWATER DISCHARGES THROUGH THE DISTURBED AREAS TOWARD THE PROTECTED NATURAL RESOURCE, PERIMETER EROSION CONTROLS MUST BE DOUBLED. IF DISTURBANCE ACTIVITIES TAKE PLACE LESS THAN 30 FEET FROM ANY PROTECTED NATURAL RESOURCE, AND STORMWATER DISCHARGES THROUGH THE DISTURBED AREAS TOWARD THE PROTECTED NATURAL RESOURCE, PERIMETER EROSION CONTROLS MUST BE DOUBLED AND DISTURBED AREAS MUST BE TEMPORARILY OR

PERMANENTLY STABILIZED WITHIN 7 DAYS.

1.2 SEDIMENT BARRIERS: PRIOR TO CONSTRUCTION, PROPERLY INSTALL SEDIMENT BARRIERS AT THE DOWNGRADIENT EDGE OF ANY AREA TO BE DISTURBED AND ADJACENT TO ANY DRAINAGE CHANNELS WITHIN THE DISTURBED AREA. SEDIMENT BARRIERS MUST BE INSTALLED DOWNGRADIENT OF SOIL OR SEDIMENT STOCKPILES AND STORMWATER PREVENTED FROM RUNNING ONTO THE STOCKPILE. MAINTAIN THE SEDIMENT BARRIERS BY REMOVING ACCUMULATED SEDIMENT, OR REMOVING AND REPLACING THE BARRIER, UNTIL THE DISTURBED AREA IS PERMANENTLY STABILIZED. WHERE A DISCHARGE TO A STORM DRAIN INLET OCCURS, IF THE STORM DRAIN CARRIES WATER DIRECTLY TO A SURFACE WATER AND YOU HAVE AUTHORITY TO ACCESS THE STORM DRAIN INLET, YOU MUST INSTALL AND MAINTAIN PROTECTION MEASURES THAT REMOVE SEDIMENT FROM THE DISCHARGE.

1.3 TEMPORARY STABILIZATION: WITHIN 7 DAYS OF THE CESSATION OF CONSTRUCTION ACTIVITIES IN AN AREA THAT WILL NOT BE WORKED FOR MORE THAN 7 DAYS, STABILIZE ANY EXPOSED SOIL WITH MULCH, OR OTHER NON-ERODIBLE COVER. STABILIZE AREAS WITHIN 75 FEET OF A WETLAND OR WATERBODY WITHIN 48 HOURS OF THE INITIAL DISTURBANCE OF THE SOIL OR PRIOR TO

ANY STORM EVENT, WHICHEVER COMES FIRST.

1.4 REMOVAL OF TEMPORARY MEASURES: REMOVE ANY TEMPORARY CONTROL MEASURES, SUCH AS SILT FENCE, WITHIN 30 DAYS AFTER PERMANENT STABILIZATION IS ATTAINED. REMOVE ANY ACCUMULATED SEDIMENTS AND STABILIZE.

1.5 PERMANENT STABILIZATION: IF THE AREA WILL NOT BE WORKED FOR MORE THAN ONE YEAR OR HAS BEEN BROUGHT TO FINAL GRADE, THEN PERMANENTLY STABILIZE THE AREA WITHIN 7 DAYS BY PLANTING VEGETATION, SEEDING, SOD, OR THROUGH THE USE OF PERMANENT MULCH, OR RIPRAP, OR ROAD SUB-BASE. IF USING VEGETATION FOR STABILIZATION, SELECT THE PROPER VEGETATION FOR THE LIGHT, MOISTURE, AND SOIL CONDITIONS; AMEND AREAS OF DISTURBED SUBSOILS WITH TOPSOIL, COMPOST, OR FERTILIZERS; PROTECT SEEDED AREAS WITH MULCH OR, IF NECESSARY, EROSION CONTROL BLANKETS; AND SCHEDULE SODDING, PLANTING, AND SEEDING SO TO AVOID DIE-OFF FROM SUMMER DROUGHT AND FALL FROSTS. NEWLY SEEDED OR SODDED AREAS MUST BE PROTECTED FROM VEHICLE TRAFFIC, EXCESSIVE PEDESTRIAN TRAFFIC, AND CONCENTRATED RUNOFF UNTIL THE VEGETATION IS WELL-ESTABLISHED WITH 90% COVER BY HEALTHY VEGETATION. IF NECESSARY, AREAS MUST BE REWORKED AND RESTABILIZED IF GERMINATION IS SPARSE, PLANT COVERAGE IS SPOTTY, OR TOPSOIL EROSION IS EVIDENT. ONE OR MORE OF THE FOLLOWING MAY APPLY TO A PARTICULAR SITE.

1.5.1 PAVER AREAS: FOR PAVED AREAS, PERMANENT STABILIZATION MEANS THE PLACEMENT OF THE COMPACTED GRAVEL SUBBASE IS COMPLETED, PROVIDED IT IS FREE OF FINE MATERIALS THAT MAY RUNOFF WITH A RAIN EVENT

1.6 WINTER CONSTRUCTION: "WINTER CONSTRUCTION" IS CONSTRUCTION ACTIVITY PERFORMED DURING THE PERIOD FROM NOVEMBER 1 THROUGH APRIL 15. IF DISTURBED AREAS ARE NOT STABILIZED WITH PERMANENT MEASURES BY NOVEMBER 1 OR NEW SOIL DISTURBANCE OCCURS AFTER NOVEMBER 1, BUT BEFORE APRIL 15, THEN THESE AREAS MUST BE PROTECTED AND

RUNOFF FROM THEM MUST BE CONTROLLED BY ADDITIONAL MEASURES AND RESTRICTIONS

1.6.1 SITE STABILIZATION: FOR WINTER STABILIZATION, HAY MULCH IS APPLIED AT TWICE THE STANDARD TEMPORARY STABILIZATION RATE. AT THE END OF EACH CONSTRUCTION DAY, AREAS THAT HAVE BEEN BROUGHT TO FINAL GRADE

MUST BE STABILIZED. MULCH MAY NOT BE SPREAD ON TOP OF SNOW.

1.6.2 SEDIMENT BARRIERS: ALL AREAS WITHIN 75 FEET OF A PROTECTED NATURAL RESOURCE MUST BE PROTECTED WITH A

DOUBLE ROW OF SEDIMENT BARRIERS.

2 INSPECTION AND MAINTENANCE

2.1 DURING CONSTRUCTION: THE FOLLOWING STANDARDS MUST BE MET DURING CONSTRUCTION

2.1.1 INSPECTION AND CORRECTIVE ACTION: INSPECT DISTURBED AND IMPERVIOUS AREAS, EROSION CONTROL MEASURES, MATERIALS STORAGE AREAS THAT ARE EXPOSED TO PRECIPITATION, AND LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE. INSPECT THESE AREAS AT LEAST ONCE A WEEK AS WELL AS BEFORE AND WITHIN 24 HOURS AFTER A STORM EVENT (RAINFALL), AND PRIOR TO COMPLETING PERMANENT STABILIZATION MEASURES. A PERSON WITH KNOWLEDGE OF EROSION AND STORMWATER CONTROL, INCLUDING THE STANDARDS AND CONDITIONS IN THE PERMIT, MUST CONDUCT

THE INSPECTIONS.

2.1.2 MAINTENANCE: IF BEST MANAGEMENT PRACTICES (BMPS) NEED TO BE REPAIRED, THE REPAIR WORK MUST BE INITIATED UPON DISCOVERY OF THE PROBLEM BUT NO LATER THAN THE END OF THE NEXT WORKDAY. IF ADDITIONAL BMPS OR SIGNIFICANT REPAIR OF BMPS ARE NECESSARY, IMPLEMENTATION MUST BE COMPLETED WITHIN 7 CALENDAR DAYS AND PRIOR TO ANY STORM EVENT (RAINFALL). ALL MEASURES MUST BE MAINTAINED IN EFFECTIVE OPERATING CONDITION

UNTIL AREAS ARE PERMANENTLY STABILIZED.

2.1.3 DOCUMENTATION: KEEP A LOG (REPORT) SUMMARIZING THE INSPECTIONS AND ANY CORRECTIVE ACTION TAKEN.

THE LOG MUST INCLUDE THE NAME(S) AND QUALIFICATIONS OF THE PERSON MAKING THE INSPECTIONS, THE DATE(S) OF THE INSPECTIONS, AND MAJOR OBSERVATIONS ABOUT THE OPERATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS, MATERIALS STORAGE AREAS, AND VEHICLES ACCESS POINTS TO THE PARCEL. MAJOR OBSERVATIONS MUST INCLUDE BMPS THAT NEED MAINTENANCE, BMPS THAT FAILED TO OPERATE AS DESIGNED OR PROVED INADEQUATE FOR A PARTICULAR LOCATION, AND LOCATION(S) WHERE ADDITIONAL BMPS ARE NEEDED. FOR EACH BMP REQUIRING MAINTENANCE, BMP NEEDING REPLACEMENT, AND LOCATION NEEDING ADDITIONAL BMPS, NOTE IN THE LOG THE CORRECTIVE ACTION TAKEN AND WHEN IT WAS TAKEN. THE LOG MUST BE MADE ACCESSIBLE TO DEPARTMENT STAFF AND A COPY MUST BE PROVIDED UPON REQUEST. THE PERMITTEE MUST RETAIN A COPY OF THE LOG FOR A PERIOD OF AT LEAST THREE YEARS FROM THE COMPLETION

OF PERMANENT STABILIZATION.

3 HOUSEKEEPING

3.1 SPILL PREVENTION: CONTROLS MUST BE USED TO PREVENT POLLUTANTS FROM CONSTRUCTION AND WASTE MATERIALS STORED ON SITE TO ENTER STORMWATER, WHICH INCLUDES STORAGE PRACTICES TO MINIMIZE EXPOSURE OF THE MATERIALS TO STORMWATER. THE SITE CONTRACTOR OR OPERATOR MUST DEVELOP, AND IMPLEMENT AS NECESSARY, APPROPRIATE SPILL

PREVENTION, CONTAINMENT, AND RESPONSE PLANNING MEASURES.

3.2 FUGITIVE SEDIMENT AND DUST: ACTIONS MUST BE TAKEN TO ENSURE THAT ACTIVITIES DO NOT RESULT IN NOTICEABLE EROSION OF SOILS OR FUGITIVE DUST EMISSIONS DURING OR AFTER CONSTRUCTION. OIL MAY NOT BE USED FOR DUST CONTROL, BUT OTHER WATER ADDITIVES MAY BE CONSIDERED AS NEEDED. A STABILIZED CONSTRUCTION ENTRANCE (SCE) MUST BE INCLUDED TO MINIMIZE TRACKING OF MUD AND SEDIMENT. IF OFF-SITE TRACKING OCCURS, PUBLIC ROADS MUST BE SWEPT IMMEDIATELY AND NO LESS THAN ONCE A WEEK AND PRIOR TO SIGNIFICANT STORM EVENTS. OPERATIONS DURING DRY MONTHS, THAT EXPERIENCE FUGITIVE DUST PROBLEMS, MUST WET DOWN UNPAVED ACCESS ROADS ONCE A WEEK OR MORE FREQUENTLY AS

NEEDED WITH A WATER ADDITIVE TO SUPPRESS FUGITIVE SEDIMENT AND DUST.

3.3 DEBRIS AND OTHER MATERIALS: MINIMIZE THE EXPOSURE OF CONSTRUCTION DEBRIS, BUILDING AND LANDSCAPING MATERIALS, TRASH, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE AND OTHER MATERIALS TO PRECIPITATION AND STORMWATER RUNOFF. THESE MATERIALS MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE.

3.4 EXCAVATION DE-WATERING: EXCAVATION DE-WATERING IS THE REMOVAL OF WATER FROM TRENCHES, FOUNDATIONS, COFFER DAMS, PONDS, AND OTHER AREAS WITHIN THE CONSTRUCTION AREA THAT RETAIN WATER AFTER EXCAVATION. IN MOST CASES THE COLLECTED WATER IS HEAVILY SILTED AND HINDERS CORRECT AND SAFE CONSTRUCTION PRACTICES. SEE CONSTRUCTION

DEWATERING NOTES 1 THROUGH 7 ON C-001 FOR SITE SPECIFIC DEWATERING REQUIREMENTS.

3.5 AUTHORIZED NON-STORMWATER DISCHARGES: IDENTIFY AND PREVENT CONTAMINATION BY NON-STORMWATER DISCHARGES.

WHERE ALLOWED NON-STORMWATER DISCHARGES EXIST, THEY MUST BE IDENTIFIED AND STEPS MUST BE TAKEN TO ENSURE THE IMPLEMENTATION OF APPROPRIATE POLLUTION PREVENTION MEASURES FOR THE NON-STORMWATER COMPONENT(S) OF THE

DISCHARGE. AUTHORIZED NON-STORMWATER DISCHARGES ARE:

3.5.1 DISCHARGES FROM FIREFIGHTING ACTIVITY;

3.5.2 FIRE HYDRANT FLUSHINGS;

3.5.3 DUST CONTROL RUNOFF IN ACCORDANCE WITH PERMIT CONDITIONS AND APPENDIX (C)(3);

3.5.4 ROUTINE EXTERNAL BUILDING WASHDOWN, NOT INCLUDING SURFACE PAINT REMOVAL, THAT DOES NOT INVOLVE

DETERGENTS;

3.5.5 PAVEMENT WASHWATER (WHERE SPILLS/LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE NOT OCCURRED, UNLESS

ALL SPILLED MATERIAL HAD BEEN REMOVED) IF DETERGENTS ARE NOT USED;

3.5.6 UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE;

3.5.7 UNCONTAMINATED GROUNDWATER OR SPRING WATER;

3.5.8 FOUNDATION OR FOOTER DRAIN-WATER WHERE FLOWS ARE NOT CONTAMINATED;

3.5.9 UNCONTAMINATED EXCAVATION DEWATERING (SEE REQUIREMENTS IN APPENDIX C(5));

3.5.10 POTABLE WATER SOURCES INCLUDING WATERLINE FLUSHINGS; AND

3.5.11 LANDSCAPE IRRIGATION.

3.6 UNAUTHORIZED NON-STORMWATER DISCHARGES:

3.6.1 WASTEWATER FROM THE WASHOUT OR CLEANOUT OF CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING

COMPOUNDS OR OTHER CONSTRUCTION MATERIALS;

3.6.2 FUELS, OILS OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE;

3.6.3 TOXIC OR HAZARDOUS SUBSTANCES FROM A SPILL OR OTHER RELEASE.

PLAN

SECTION

SANDBAG OR CONCRETE BLOCK (25 LB MIN) (10' OC)

AREA TO BE PROTECTED

12" FILLED SILT SOCK

NOTES:

1. PROVIDE PHOTO DEGRADABLE SYNTHETIC

NETTING TUBE WITH 1/8" MESH OPENINGS.

WATER FLO

W

12" FILTER SOCK

ZIP TIE OR WIRETIE TO SOCK MESH (OPTIONAL)

SANDBAG OR CONCRETE BLOCK (25 LB MIN)

WORK AREA AREA TO BE PROTECTED

WORK AREA

EX GRADE

EXISTING BASINSILTSACK

SILTSACK

CATCH BASIN

FRAME OR

BASIN OPENING

1" DIA REBAR FOR

LIFTING AND REMOVAL

(TYP)

CATCH BASIN

PLACE SILTSACK IN

EX FRAME

EX GRATE MAY BE

REPLACED DURING

CONSTRUCTION

NOTES:

1. REMOVE SEDIMENT FROM SILT SACK AFTER RAIN EVENT OR WHEN TRAPPED SEDIMENT IS

EVIDENT IN THE BOTTOM OF THE SILTSACK.

FLOW

1' M

IN

2' MIN

EXISTING GROUND

FILL SLOPE

NOTES:

1. EROSION CONTROL MIX CAN BE MANUFACTURED ON OR OFF THE SITE. IT MUST CONSIST PRIMARILY OF ORGANIC MATERIAL SEPARATED AT THE POINT OF GENERATION, AND MAY INCLUDE: SHREDDED BARK, STUMP GRINDINGS, COMPOSTED BARK, OR FLUME GRIT AND FRAGMENTED

WOOD GENERATED FROM WATER-FLUME LOG HANDLING SYSTEMS.

WOOD CHIPS, GROUND CONSTRUCTION DEBRIS, REPROCESSED WOOD PRODUCTS OR BARK CHIPS ARE NOT ACCEPTABLE AS THE ORGANIC

COMPONENT OF THE MIX.

PROVIDE EROSION CONTROL MIX WITH A WELL-GRADED MIXTURE OF PARTICLE SIZES AND CONTAINING ROCKS LESS THAN 4" IN DIAMETER.

PROVIDE EROSION CONTROL MIX FREE OF REFUSE, PHYSICAL CONTAMINANTS, AND MATERIAL TOXIC TO PLANT GROWTH AND WHICH MEETS

THE FOLLOWING STANDARDS:

A. ORGANIC MATERIAL: BETWEEN 50% - 100% (DRY WEIGHT BASIS)

B. PARTICLE SIZE: BY WEIGHT, 100% PASSING 6" SCREEN, 70-85% PASSING 0.75" SCREEN

C. THE ORGANIC PORTION NEEDS TO BE FIBROUS AND ELONGATED

D. LARGE PORTIONS OF SILTS, CLAYS OR FINE SANDS ARE NOT ACCEPTABLE IN THE MIX

E. SOLUBLE SALTS CONTENT BE LESS THAN 4.0 MMHOS/CM

F. PH: 5.0 - 8.0

2. THE BARRIER MUST CONFORM TO THE ABOVE DIMENSIONS ON SLOPES LESS THAN 5% OR AT THE BOTTOM OF SLOPES LESS THAN 20 FEET LONG WITH SLOPES AT 2:1 OR FLATTER ON LONGER OR STEEPER SLOPES, PROVIDE A WIDER BARRIER TO ACCOMMODATE THE ADDITIONAL

FLOW.

3. PLACE THE BARRIER ALONG A RELATIVELY LEVEL ELEVATION. CUT TALL GRASSES OR WOODY VEGETATION TO AVOID CREATING VOIDS AND BRIDGES THAT WOULD ENABLE FINES TO WASH UNDER THE BARRIER THROUGH THE GRASS BLADES OR PLANT STEMS.

4. PROVIDE OTHER BMP'S AT LOCATIONS BELOW:

A. AT LOW POINTS OF CONCENTRATED FLOW

B. BELOW CULVERT OUTLET APRONS

C. WHERE A PREVIOUS STAND-ALONE EROSION CONTROL MIX APPLICATION HAS FAILED

D. AT THE BOTTOM OF STEEP PERIMETER SLOPES THAT ARE MORE THAN 50 FEET FROM TOP TO BOTTOM (LARGE UPGRADIENT WATERSHED)

E. AROUND CATCH BASINS AND CLOSED STORM DRAIN SYSTEMS.

5. INSPECT EROSION CONTROL MIX BARRIERS REGULARLY AND AFTER EACH LARGE RAINFALL. REPAIR DAMAGED SECTIONS OF BARRIER IMMEDIATELY BY REPLACING OR ADDING ADDITIONAL MATERIAL TO THE DESIRED HEIGHT AND WIDTH.

6. REMOVE SEDIMENT DEPOSITS WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.

STAKE ON 10'

LINER

SPACING*

WATER FLOW

WORK AREA

AREA TO BE

PROTECTED

PLAN VIEW SECTION

2"x2" WOODEN STAKE*

8" DIAMETER SILT

SOCK

WORK AREA

AREA TO BE

PROTECTED

1'- 0"

SILT SOCK SIZE PER

MANUFACTURER

RECOMMENDATIONS

* OMIT WOODEN STAKES WHEN PLACING SEDIMENT BARRIER ON ASPHALT OR CONCRETE PAVEMENT

3" -4

SCALE:A1 SILT SACK INLET CONTROL DETAIL

NOT TO SCALE SCALE:A2 SEDIMENT BARRIER - FILTER SOCK ON PAVED SURFACES

NOT TO SCALE SCALE:A4 SEDIMENT BARRIER - FILTER SOCK

NOT TO SCALE

SCALE:C4 SEDIMENT BARRIER - BERM MIX

NOT TO SCALE

Lee D.

Allen

L

I C E N S E

D

P R

O F

E S S I O NA L E NG

I N E

E R

ST

AT E OF MA I NE

08-13-2026

SED

7/2

6 3

:26 :21

P M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

C-

2.D W

G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

C-502

CI

VI

L C

ON

ST

RU

CT

IO

N

AN

D

UT

ILI

TY

D

ET

AI

LS

12952105

HLS LDAMAF

AS NOTED

12" CONCRETE 5,000 PSI MACRO-FIBER REINFORCED

CONCRETE, DOSED AT 5 LB/CY SLAB ON GRADE.

6" MIN

4"

SCALE:A1 CONCRETE EQUIPMENT PAD DETAIL

NOT TO SCALE

CONSTRUCT IN ACCORDANCE WITH CT DOT SECTION 9.21

3/4" CHAMFER ALL

EXPOSED EDGES, TYP.

EXISTING COMPACTED SUBGRADE

(COMPACTED TO 95% OF STANDARD

PROCTOR, ASTM D698)

RESTORE EXISTING

GRAVEL SURFACE

SCALE:A3 4-WAY SERVICE TRENCH DETAIL

NOT TO SCALE

MIN TYP ALL SIDES

3" MIN. SEPARATION

BETWEEN CONDUITS (TYP)

DETECTABLE

WARNING TAPE

3" HDPE SPACERS

2'-

0" C

OV

ER

(M

IN

SAND BEDDING THAT

CONFORMS TO AASHTO M6

6" CLEAR

CONSTRUCT IN ACCORDANCE WITH NAVFAC UTILITY STANDARDS AND CT DOT SECTION 10.08

(1) 2-1/2" SCH 80

PVC CONDUIT

(3) 3/4" SCH 80

PVC CONDUIT

GENSET EQUIPMENT

34" LAYER OF CRUSHED STONE (CT DOT M.01.02-2 #67)

WRAPPED IN GEOTEXTILE FABRIC (BOTTOM OF

CRUSHED STONE MUST BE 3.5' BELOW FINISHED GRADE

RESTORE EXISTING

GRAVEL SURFACE

BACKFILL WITH

SATISFACTORY MATERIAL

SED

A-001

GE

NE

RA

L N

OT

ES

, A

BB

RE

VI

AT

IO

NS

, A

ND

LE

GE

ND

12952106

TJC EACECL

XXX

AS NOTED

8/1 4/2

6 1

0:1 9:1

0 A M

C:

\C

CE

D

RO

PB

OX

\C

OL

BY

C

OM

PA

NY

E

NG

IN

EE

RI

NG

\E

NG

IN

EE

RI

NG

\29 7 P

OR

TS

MO

UT

H

NA

VA

L S

HI

PY

AR

D\

7.3

.00

1 - G

RO

TO

N B.

1 N

SM

RL

G

EN

ER

AT

OR

R

EP

LA

CE

ME

NT

\D

RA

W

IN

GS

\S

HE

ET

S\

A-

1.D W

G

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

PM/DM

CHIEF ENG/ARCH

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

GR

OT

ON

, C T

PW

D

FE

AD

N

EW

LO

ND

ON

SU

BA

SE

N

EW

LO

ND

ON

G

RO

TO

N, C

T

DRAWFORM REVISION: 14 SEP 2023

1904124

B

G

E N

E R

A

TO

R R

E P

LA

C

E M

E N

T

08/12/2026

M

AR

K D

ES

C

R

IP

TI

O

N

BRANCH MANAGER

FIRE PROTECTION

CONTRACT NO.

KWA

SCALE:

D

SED

IS

SU

ED

F O

R C

O N

ST

R

U C

TI

O

N D

AT

E

/1

3/

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

APPROVED BY LOUIS DEFLICE

VIA EMAIL

TYPICAL ABBREVIATIONS: GRAPHIC LEGEND: GENERAL NOTES:MATERIAL LEGEND:

CONCRETE BLOCK (SECTION)

GYPSUM BOARD

PLYWOOD

BATT INSULATION

@ AT

# NUMBER

± PLUS OR MINUS

W/ WITH

ABA/ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD

ABI ALTERNATE BID ITEM

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISHED FLOOR

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CT CERAMIC TILE

DEMO DEMOLITION

DIA DIAMETER

DN DOWN

DWG DRAWING

(E) EXISTING

EA EACH

EF EXHAUST FAN

EL ELEVATION

ELEC ELECTRICAL

EQ EQUAL

ETC ETCETERA

ETR EXISTING TO REMAIN

EXP EXPOSED TO STRUCTURE

EXST EXISTING

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FLR FLOOR

FR FIRE RATED

FT FEET

GA GAUGE

GC GENERAL CONTRACTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GYP BD GYPSUM BOARD

HGT HEIGHT

HM HOLLOW METAL

IAW IN ACCORDANCE WITH

INSUL INSULATION/INSULATED

IT INFORMATION TECHNOLOGY

L LOUVER

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

M.A. MASONRY OPENING

MR MOISTURE RESISTANT

MTL METAL

N.I.C. NOT IN CONTRACT

NTS NOT TO SCALE

OCC OCCUPANCY

OPP OPPOSITE

PLAM PLASTIC LAMINATE

PT PRESSURE TREATED

PTD PAINTED

RB RUBBER BASE

R.O. ROUGH OPENING

SF SQUARE FEET

SIM SIMILAR

SPEC SPECIFICATION

SQ.FT SQUARE FEET

STC SOUND TRANSMISSION CLASS

T.0. TOP OF

TYP TYPICAL

UL UNDERWRITERS LABORATORIES

U.N.O UNLESS NOTED OTHERWISE

VB VINYL BASE

V.I.F. VERIFY IN FIELD

VCT VINYL COMPOSITION TILE

WC WATER CLOSET

WD WOOD

WALL TYPE

DOOR TAG

KEYED NOTES

WINDOW TAG

SIGNAGE TAG

X

XXX

X'-X"

MS

PLAN

NORTH

MOTION SENSOR, SEE

ELECTRICAL

DIMENSION LINE

ROOM DESIGNATION

ROOM NUMBER

NORTH ARROW

EXISTING ITEMS TO REMAIN

ITEMS TO BE REMOVED

ITEMS TO BE PROVIDED

ARCHITECTURAL LINE TYPE

LEGEND:

1. FIELD VERIFY DIMENSIONS AND CONDITIONS. PROMPTLY NOTIFY THE CONTRACTING OFFICER OF ANY INCONSISTENCIES OR OTHER PROBLEMS IN WRITING IMMEDIATELY UPON DISCOVERY, AND BEFORE PROCEEDING

WITH THE WORK.

2. ALL INDICATIONS AND NOTATIONS ON THE DRAWINGS APPLYING TO ONE AREA, COMPONENT OR CONDITION, MUST APPLY TO ALL OTHER SIMILAR AREAS, COMPONENTS AND CONDITIONS, UNLESS CLEARLY INDICATED.

3. PRESERVE AND MAINTAIN EXISTING CONDITIONS OF ANY SURFACES WHICH WILL REMAIN EXPOSED IN THE FINISHED WORK. SURFACES DAMAGED BY DEMOLITION WORK MUST BE REPAIRED AS REQUIRED TO MATCH THE EXISTING

SURFACE.

4. DO NOT DAMAGE THE EXISTING BUILDING ENCLOSURE AND ITS PARAMETERS, INCLUDING DURING STRUCTURE DEMOLITION. PROVIDE REPAIR WORK TO MATCH EXISTING FOR ANY DAMAGE THAT OCCURS DURING DEMOLITION, AT NO ADDITIONAL COST OR SCHEDULE TO GOVERNMENT.

5. WHERE EXISTING SURFACES ARE TO BE FRAMED OR FURRED TO RECEIVE NEW FINISHES, ENSURE THAT THE EXISTING SURFACES HAVE BEEN COMPLETELY CLEANED OF EXISTING CONTAMINANTS AND/OR SURFACE DIRT AND THAT EXISTING FINISHES HAVE BEEN REMOVED DOWN TO BARE SUBSTRATE PRIOR TO ENCLOSING OR RECEIVING

NEW FINISHES.

6. BUILDING MUST BE FULLY SECURED DURING AND AT THE END OF EACH WORK PERIOD.

7. DIMENSIONS ARE TAKEN FROM FACE OF FINISHED CONSTRUCTION UNLESS NOTED OTHERWISE. CLEAR DIMENSIONS ARE TO FINISHED FACE OF CONSTRUCTION AND MUST TAKE PRECEDENCE OVER ANY OTHER

DIMENSION.

8. NEW, EXISTING, THRU-WALL AND ABANDONED PENETRATIONS MUST BE SEALED. PENETRATIONS THROUGH FIRE RATED AND SMOKE RATED ASSEMBLIES MUST BE FIRE AND SMOKE SEALED AS REQUIRED TO MAINTAIN RATINGS.

FIRE STOPPING AND SEALING OF PENETRATIONS MUST BE COMPLETED WITH APPROPRIATE UL LISTED ASSEMBLY AND MUST BE INSTALLED IN ACCORDANCE WITH LISTED SYSTEM. PENETRATIONS THROUGH RATED ASSEMBLIES ARE GENERALLY IDENTIFIED ON THE ARCHITECTURAL PLANS. FIRESTOPPING SUBCONTRACTORS MUST ALSO COORDINATE WITH ARCHITECTURAL AND ELECTRICAL DRAWINGS TO CONFIRM NECESSARY FIRESTOPPING PRIOR

TO CONSTRUCTION.

9. PROVIDE SEALANTS TO AREAS PER STANDARD PRACTICE TO MEET OR EXCEED ANY WEATHER, SOUND, AND FIRE

REQUIREMENTS PER EACH MANUFACTURER'S DETAILED INSTRUCTIONS.

10. OWNER/TENANTS WILL MOVE PERSONAL ITEMS PRIOR TO WORK TAKING PLACE IN SPECIFIC AREAS. MOVE AND REPLACE TO ORIGINAL LOCATIONS OR PROTECT: DESKS, CHAIRS, BOOKCASES, FILE CABINETS OR ANY OTHER

FURNITURE AS NEEDED TO ACCESS WORK LOCATIONS.

11. COORDINATE AND CONTRACT WITH STATE, LOCAL, AND UTILITY ENTITIES AS NECESSARY TO EXECUTE THE CONTRACT DOCUMENTS. UTILITIES AND SERVICES AFFECTED BY THE WORK INCLUDE, BUT ARE NOT LIMITED TO ELECTRICAL. THIRD PARTY TESTING AGENCIES MUST BE FIRST-TIER SUBCONTRACTORS TO THE CONTRACTOR, AND PROVIDE COPIES OF TEST REPORTS TO THE SPECIFIED AGENCIES AND THE OWNER. OBTAIN PERMITS AND

COORDINATE INSPECTION AND ACCEPTANCE TESTS WITH AUTHORITY HAVING JURISDICTION.

12. INFILL, PATCH AND PAINT SURFACES WHERE ELECTRICAL DEVICES HAVE BEEN REMOVED IN LOCATIONS THAT WILL

BE VISIBLE. THE REPAIR MUST MATCH EXISTING ADJACENT MATERIAL.

X

A

THIS PROJECT INCLUDES BUILDINGS 141 & 156 OF SIGNIFICANT HISTORICAL

IMPORTANCE AND IS ELIGIBLE FOR LISTING ON THE NATIONAL REGISTER OF HISTORIC

PLACES. THE CONTRACTOR AS WELL AS ALL INDIVIDUALS WORKING ON THIS PROJECT

MUST PROVIDE AN ADDITIONAL LEVEL OF CARE AND ATTENTION TO AVOID ANY

DAMAGE TO THE EXISTING BUILDING'S HISTORIC FABRIC, SURFACES, FINISHES, AND

SYSTEMS THAT REMAIN IN PLACE. HISTORIC ORIGINAL BUILDING ELEMENT INCLUDE

BUT ARE NOT LIMITED TO, THE EXTERIOR FACADE CONSTRUCTION. ANY AND ALL

DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATION MUST BE REPAIRED OR

REPLACED ONLY AS…