(B) Groton B. 141 Generator Drawings (1).pdf
PDF 12 MB Posted
- Attached to
- Building 141 Generator Replacement
- Solicitation number
- AMS00803446
About this file
This is a construction drawing set for the B.141 Generator Replacement project at Naval Station New London in Groton, Connecticut. The project involves replacing an existing 30kW generator with a new 300kW standby generator and associated electrical infrastructure, with work documented under EPROJECT NO. 1904124 and TASK ORDER NO. N40085-26-F-0821. The drawings are issued for construction dated August 13, 2026, and are prepared in accordance with Naval Facilities Engineering Systems Command (NAVFAC) standards by Colby Company Engineering.
The scope includes site preparation with contractor laydown areas, civil work encompassing a new concrete equipment pad (approximately 23'-8" × 6'-10" with a 2,050-gallon sub-base tank), electrical ductbank routing from the generator to Building 141, and comprehensive erosion and sedimentation controls. Interior work is limited to new electrical conduit installations on the first, second, and third floors connecting to existing panels E21A, MDP3, and new Emergency Distribution Panel EDP. The electrical design incorporates a new 45kVA 480V:208/120V transformer, a 400A automatic transfer switch, and temporary generator docking station provisions during construction. The project includes four construction phases requiring cutover to temporary power while the existing generator is demolished and the new 300kW unit is installed. Historic resource protection is mandated for both Buildings 141 and 156, with requirements for careful handling to preserve facade construction and other historic fabric. The contract requires utility coordination including DigSafe notification, temporary stabilization measures within 7 days of soil disturbance, and comprehensive inspection and maintenance protocols for erosion controls throughout the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (M) NEPA_EV_Checklist_1904124_B141 Generator.pdf | ||
| (C) CT Wage Determination.pdf | ||
| (H) Map to B135.pdf | ||
| (I) General Requirements.pdf | ||
| (A) Groton B. 141 - Specifications - Final.pdf | ||
| (J) RFI Form.pdf | ||
| (F) Guide to Taxes.pdf | ||
| (L) 52.204-24.pdf | ||
| (G) Sales Tax Exempt.pdf | ||
| (D) ECMS.pdf | ||
| (E) CERT-141.pdf | ||
| (K) Price Proposal Form.pdf | ||
| RFP ASM00803446.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B.141 GENERATOR REPLACEMENT
EPROJECT NO. 1904124
TASK ORDER NO. N40085-26-F-0821
NAVAL STATION NEW LONDON
GROTON, CT
DETAIL IS REFERENCED
SECTION IS REFERENCED
ELEVATION IS REFERENCED
SHEET NUMBER WHERE
DETAIL LETTER OR NUMBER
REFERENCES
ADDITIONAL SHEET
C-102
SHEET NUMBER WHERE
REFERENCES
ADDITIONAL SHEET
INDICATES DIRECTION
OF CUTTING PLANE
ELEVATION LETTER OR NUMBER
REFERENCES
ADDITIONAL SHEET
SHEET NUMBER WHERE
SECTION LETTER OR NUMBER
OF CUTTING PLANE
INDICATES DIRECTION
C-102
C-102
A A-000
A A-000
A A-000
BLOCK
ISLAND
LONG ISLAND
LONG ISLAND SOUND
PROVIDENCE
HARTFORD
MA
NY
N.J.
CT
HU
DS
ON
R
IV
ER
CO
NN
EC
TI
CU
T
RI
VE
R
RI
NYC
BOSTON
CONCORD
BRATTLEBORO
NH
VT
NJ
ME
PORTLAND
VICINITY MAP
NTS
NAVAL STATION
NEW LONDON
ELEVATION, SECTION OR DETAIL SYMBOLS
ELEVATION
SECTION
DETAIL
CAMPUS MAP
NTS
PROJECT
LOCATION
Signature Date
QUALITY CONTROL REVIEW
8/1 7/2
6 8
:15 :59
A M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
X G-
1.D
W G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
G-001
CO
VE
R
SH
EE
T
12952097
ACY KBLACY
AS NOTED
NSEDECIL
BENJAMIN C.
TOWNSEND
No.13287
OFETATS
MAINE
N LAOISSEFOR
P
ENGINEE
R
08/13/26
SED
8/1 4/2
6 1
0:1 8:3
9 A M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
X G-
1.D
W G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
G-002
IN
DE
X
OF
S
HE
ET
S
12952098
ACY KBLACY
XXX
AS NOTED
LIST OF DRAWINGS
DWG. NO. SHEET NO. NAVFAC NO. DRAWING TITLE
1 G-001 12952097 COVER SHEET
2 G-002 12952098 INDEX OF SHEETS
3 G-101 12952099 SITE ACCESS AND CONTRACTOR LAYDOWN AREA
4 C-001 12952100 CIVIL GENERAL NOTES, LEGEND, AND ABBREVIATIONS
5 CJ101 12952101 EXISTING CONDITIONS PLAN
6 CD101 12952102 SITE DEMOLITION PLAN
7 C-101 12952103 SITE LAYOUT AND UTILITY PLAN
8 C-501 12952104 EROSION AND SEDIMENTATION CONTROL NOTES AND DETAILS
9 C-502 12952105 CIVIL CONSTRUCTION AND UTILITY DETAILS
10 A-001 12952106 GENERAL NOTES, ABBREVIATIONS, AND LEGEND
11 A-101 12952107 FIRST FLOOR PLAN
12 A-102 12952108 SECOND FLOOR PLAN
13 E-001 12952109 ELECTRICAL LEGEND, ABBREVIATIONS & GENERAL NOTES
14 ED101 12952110 ELECTRICAL DEMOLITION CRAWL SPACE PLAN
15 ED102 12952111 ELECTRICAL DEMOLITION FIRST FLOOR PLAN
16 E-101 12952112 ELECTRICAL NEW WORK CRAWL SPACE PLAN
17 E-102 12952113 ELECTRICAL NEW WORK FIRST FLOOR PLAN
18 E-103 12952114 ELECTRICAL NEW WORK THIRD FLOOR PLAN
19 E-601 12952115 208V DEMOLITION ONE-LINE DIAGRAM
20 E-602 12952116 208V NEW WORK ONE-LINE DIAGRAM
21 E-603 12952117 480V DEMOLITION ONE-LINE DIAGRAM
22 E-604 12952118 480V NEW WORK ONE-LINE DIAGRAM
23 E-605 12952119 SCHEDULES - PANEL E21A AND EDP
NSEDECIL
BENJAMIN C.
TOWNSEND
No.13287
OFETATS
MAINE
N LAOISSEFOR
P
ENGIN
EE
R
08/13/26
SED
P ie r
P ie r
P ie r
P ie r
P ie r
P ie r
P ie r
C
P
W P
P
U
TL
B
P
IE
R
P
IE
R
P
IE
R
0B
8A
9 57
8A
8A
7B
D
P A
V E
A -1
7A
R T6
W R
PG
R
5A
K
V S
U B
K
V S
U B
K
V S
U B
K
V S
U B
K
V S
U B
K
V S
U B
K
V S
U B
K
V S
U B
K
V S
U B
7A
P S
-A x
7A
4-
O W
S
C
P
P S
P S
4A
F U
E L
C E
LL
P
LA
N
T M
M H
F U
E L
C E
LL
P
LA
N
T M
M H
Tang Ave
Ta ng
Av e
2A
9-
O W
S
O .T
-1 3O
.T -1
G at e
Cr ys ta l L ak e
Rd
PROVIDENCE & WORCHESTER R.R.
LAKE
ROCK
GOSS
COVE
T H A M E S R I V E R
L E D Y A R D G R O T O N
A M B E R J A C K R D A L B A C O R E R D
A L B A C O R E R D
A M B E R J A C K R D
A M B E R J A C K R D
A R G O N A U T R D
BULLHEAD CAPELIN CISCO RD
CISCO RD
CISCO RD
BONEFISH
BARBEL
CORVINA RD
DORADO RD
DEP
LO
YE
D PA
RKIN
G
SCAMP AVE
SW
ORDFISH AVE
SNOOK AVE
SEAWOLF AVE
SEALION AVE
ESCOLAR AVE
RU
NN
ER
AVE
S H A R K B L V D
W A H O O A V E
T A U T
O G A V E
T A U T O G A V E
CONGER AVE
CORSAIR AVE
THRESHER AVE THRESHER AVE
RASHER AVE
C O N N R O U T E 1 2
C O N N R O U T E 1 2
C R
Y S
T A L
L A
K E
R D
MILITARY HIGHWAY
T A U T O G A V E
RASHER
AVE
TANG AVE
TA
NG
A
VE
SCULPIN AVE
TANG AVE
GRAYBACK AVE
GUDGEON AVE
GR
OW
LE
R
AV
E
TR
IG
GE
R
AV
E
GRENADIER AVE
KETE AVE
GRAYLING AVE
HERRING
GRUNNION AVE
PICKEREL AVE
TROUT AVE
PERCH AVE
SCORPIONAVE
LA
GA
RT
O
AV
E
ROBALO AVE
MAIN GATE AND CONTRACTOR SITE ACCESS
BUILDING 141
CONTRACTOR
LAYDOWN AREA
CONTRACTOR
LAYDOWN AREA
CONTRACTOR
LAYDOWN AREA
GRAYLING AVE
SCORPION AVE S H A R K B L V D
FL
AS
HE
R
AV
E
HARDER AVE
WORK AREA
8/1 7/2
6 3
:07 :21
P M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
G-
1.D W
G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
G-101
SI
TE
A
CC
ES
S
AN
D
CO
NT
RA
CT
OR
LA
YD
OW
N
AR
EA
12952099
HLS LDAMAF
AS NOTED
20'0' 1"=10'
10'SCALE:A1 SITE ACCESS AND CONTRACTOR LAYDOWN AREA
1" = 10'
NOTES:
1. THE LOCATION OF THE CONTRACTOR LAYDOWN
AREA WILL BE FINALIZED AFTER CONTRACT AWARD
SED
7/2
6 3
:09 :24
P M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
C-
1.D W
G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
C-001
CI
VI
L G
EN
ER
AL
N
OT
ES
, L
EG
EN
D, A
ND
A
BB
RE
VI
AT
IO
NS
12952100
HLS LDAMAF
AS NOTED
TRAFFIC CONTROL NOTES:
1. MAINTAIN EXISTING TRAFFIC CONTROL SIGNAGE AND INFORMATIONAL SIGNS DURING THE WORK.
2. PROVIDE POST MOUNTED TRAFFIC CONTROL AND INFORMATIONAL SIGNS IN ACCORDANCE WITH THE MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS, AS PUBLISHED BY USDOT-FHWA, LATEST EDITION.
GENERAL NOTES:
1. IF AN EXISTING TBM IS BEING DISTURBED AS A PART OF THIS PROJECT, THEN THE CONTRACTOR MUST RELOCATE THE
EXISTING TBM UNDER THE SUPERVISION OF A LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. DIMENSIONS ARE TO FACE OF CURB, AND TO FACE OF FOUNDATION, EDGE OF PAVEMENT, AND CENTERLINE OF MARKINGS, UNLESS
OTHERWISE INDICATED.
2. PAVEMENT EDGES MUST BE TRUE TO LINE. SAWCUT EXISTING PAVEMENT IN SMOOTH STRAIGHT LINE; WHERE NEW
PAVEMENT JOINS EXISTING, PROVIDE TACK COAT LAYER AS SPECIFIED.
3. VERIFY EXISTING CONDITIONS AND DIMENSIONS AND REPORT DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO STARTING WORK. VERIFY SITE CONDITIONS INCLUDING TEST PITS FOR LOCATIONS AND INVERTS OF UTILITIES AND REPORT DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO PROCEEDING WITH THAT PORTION OF THE WORK.
4. COORDINATE WITH CONTRACTING OFFICER TO SCHEDULE A MEETING WITH THE NAVFAC GROUP AND THE FIRE CHIEF WITHIN 14 DAYS OF CONTRACT AWARD TO REVIEW ACCESS FOR FIRE AND RESCUE VEHICLES; AND AT REGULAR INTERVALS AS DETERMINED BY CONTRACTING OFFICER AND FIRE CHIEF THROUGHOUT THE DURATION OF THE PROJECT.
SUBMIT MEETING MINUTES.
5. SCHEDULE REMOVAL OF STORM DRAIN INFRASTRUCTURE WHEN PRECIPITATION IS NOT ANTICIPATED. SOIL DISTURBANCE MUST BE IN CONFORMANCE WITH THE EARTHWORK SPECIFICATION (31 00 00) AND NAVAL SUBMARINE
BASE NEW LONDON SOIL MANAGEMENT STANDARD OPERATING PROCEDURES.
6. PROVIDE TEMPORARY PERSONNEL BARRIERS (6 FT HIGH FENCING) AS REQUIRED TO KEEP PERSONNEL AT A SAFE
DISTANCE FROM THE CONSTRUCTION AREA.
UTILITY NOTES:
EXISTING UTILITIES SHOWN ARE APPROXIMATE ONLY AND BASED ON FIELD SURVEYS, AVAILABLE RECORDS, AND/OR PHYSICAL FEATURES. PRIOR TO COMMENCING ANY EXCAVATION OR GROUND PENETRATING WORK, LOCATE UNDERGROUND UTILITIES.
1. STATION LOCATING SERVICE SUCH AS "DIGSAFE" MUST BE DONE IN ORDER TO COMPLETE WORK. COORDINATE WITH CONTRACTING OFFICER. VERIFY ON-SITE UTILITIES AND HAVE THEM MARKED OUT BY A THIRD PARTY UTILITY LOCATOR SERVICE PRIOR TO THE START OF CONSTRUCTION. DETERMINE THE ELEVATIONS OF EXISTING UTILITIES AND UNDERGROUND OBSTRUCTIONS INDICATED AS EXISTING TO REMAIN IN LOCATION TO BE TRAVERSED BY NEW UTILITIES AND OTHER WORK PROVIDED HEREIN BEFORE NEW WORK IS LAID CLOSER THAN THE NEAREST MANHOLE OR OTHER STRUCTURE WHICH AN ADJUSTMENT IN GRADE COULD BE MADE. WHERE DIG PERMITS ARE REQUIRED, OBTAIN PERMITS
AND NOTIFY THE CONTRACTING OFFICER 30 CALENDAR DAYS PRIOR TO ANY EXCAVATION.
2. MAINTAIN MARKINGS MADE DURING THE UTILITY INVESTIGATION THROUGHOUT THE LENGTH OF THE CONTRACT.
3. NOTIFY "DIG SAFE" (811) WITHIN 14 CALENDAR DAYS, BUT NO MORE THAN 30 DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR GROUND PENETRATING ACTIVITY. FULLY COMPLY WITH THE STATE OF CONNECTICUT "DIG SAFE" LAW.
PREPARE A "DIG SAFE" UTILITY REQUEST FORM" AT LEAST 14 CALENDAR DAYS PRIOR TO EXCAVATION AND SUBMIT FORM
TO THE CONTRACTING OFFICER.
4. WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CONCRETE, BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY, INDEPENDENT, PRIVATE LOCATING COMPANY, MUST LOCATE UTILITY DEPTH BY USE OF GROUND PENETRATING RADAR (GPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. USE OUTAGES TO ISOLATE UTILITY SYSTEMS IN CIRCUMSTANCES WHERE UTILITIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF HISTORICAL DRAWINGS
DOES NOT ALLEVIATE THE CONTRACTOR FROM MEETING THIS REQUIREMENT.
5. VERIFY EXISTING UTILITY INFORMATION AND TIE-IN LOCATIONS NEEDED TO CONSTRUCT NEW UTILITY SYSTEMS AND SITE IMPROVEMENTS. VERIFICATION METHODS MUST INCLUDE, BUT NOT BE LIMITED TO, TEST PITS AND CCTV TO VERIFY LOCATION, ELEVATION, SIZE, MATERIAL, AND ANY OTHER INFORMATION REQUIRED TO COMPLETE WORK.
6. TAKE THE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES. DAMAGE TO THE UTILITIES MUST BE
IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE.
7. COMPLIANCE WITH THE PROVISIONS OF THE GOVERNMENT, STATE AND UTILITY FOR UNDERGROUND UTILITY DAMAGE PREVENTION IS REQUIRED. THE GOVERNMENT MUST BE HELD HARMLESS AGAINST ANY LOSS, DAMAGES AND CLAIMS OF
ANY NATURE WHATSOEVER ARISING OUT OF FAILURE TO COMPLY WITH SAID PROVISIONS.
8. COORDINATE UTILITY OUTAGES WITH THE CONTRACTING OFFICER. FOR ANTICIPATED UTILITY OUTAGES, PREPARE AN APPLICATION FOR THE OUTAGE RISK ASSESSMENT PROCESS AND PROVIDE IT TO THE CONTRACTING OFFICER 30 DAYS
PRIOR TO THE PLANNED OUTAGE.
9. ADJUST SEWER, DRAIN AND ELECTRIC POWER MANHOLES, FRAMES AND GRATES OR COVERS TO MATCH FINISH GRADE.
PROVIDE FRAMES AND GRATES OR COVERS IF EXISTING ITEMS ARE DAMAGED DURING THE COURSE OF THE WORK.
REPLACEMENT ITEMS WILL BE AT THE CONTRACTOR'S EXPENSE, UNLESS OTHERWISE NOTED.
GRADING NOTES:
1. MAINTAIN TEMPORARY EROSION CONTROL MEASURES FOR THE FULL DURATION OF CONSTRUCTION. INSPECT WEEKLY
AND BEFORE AND AFTER EACH STORM AND REPAIR AS NEEDED. REMOVE SEDIMENTS FROM THE SITE. PLACE IN AREA OF
LOW EROSION POTENTIAL, AND STABILIZE WITH SEED AND MULCH.
2. PLACE TEMPORARY SOIL STABILIZATION WITHIN 14 DAYS OF INITIAL DISTURBANCE OR PRIOR TO STORM EVENT. PLACE
PERMANENT SOIL STABILIZATION WITHIN 7 DAYS OF FINAL GRADING.
3. CLEAN SEDIMENTS FROM EXISTING STORM DRAIN PIPES AND CATCH BASINS MONTHLY & AFTER MAJOR STORM EVENTS.
4. PLACE EXCAVATED MATERIAL FROM TRENCHES UPGRADIENT FROM EXCAVATIONS TO LIMIT LENGTHS OF SILT FENCE OR
FILTER SOCKS.
CONSTRUCTION EXCAVATION NOTES:
1. EXCAVATION MUST CONFORM TO APPLICABLE OSHA, EM 385-1-1, NAVAL SUBMARINE
BASE NEW LONDON SOIL MANAGEMENT STANDARD OPERATING PROCEDURES, AND
REQUIREMENTS OF 31 00 00 EXCAVATION AND FILL SPECIFICATION. EXCAVATIONS MUST
BE CLOSED AS SOON AS WORK WITHIN THE EXCAVATION IS COMPLETE. EXCAVATED
MATERIALS MUST NOT BE ALLOWED TO SPREAD IN AN UNCONTROLLED MANNER OR
BECOME CONTAMINATED WITH OTHER DEBRIS.
2. PURSUANT TO NAVAL SUBMARINE BASE NEW LONDON SOIL MANAGEMENT STANDARD
OPERATING PROCEDURES, IF ANY SIGNS OF CONTAMINATION, INCLUDING VISIBLE STAINING
OR CHEMICAL/PETROLEUM ODORS, ARE NOTED DURING EXCAVATION, EXCAVATION
OPERATIONS MUST IMMEDIATELY CEASE, AND THE PWD ENVIRONMENTAL DIVISION (EV)
INSTALLATION RESTORATION (IR) PROGRAM MANAGER MUST BE NOTIFIED.
3. HARD MATERIAL AND ROCK EXCAVATION: REMOVE HARD MATERIAL AND ROCK TO
ELEVATIONS INDICATED IN A MANNER THAT LEAVES FOUNDATION MATERIAL IN AN
UNSHATTERED AND SOLID CONDITION. BLASTING IS NOT ALLOWED. ROUGHEN LEVEL
SURFACES AND CUT SLOPED SURFACES INTO BENCHES FOR BOND WITH CONCRETE.
PROTECT SHALE FROM CONDITIONS CAUSING DECOMPOSITION ALONG JOINTS OR
CLEAVAGE PLANES, AND OTHER TYPES OF EROSION.
4. PROVIDE TRAFFIC CONTROL AND INFORMATIONAL SIGNS IN ACCORDANCE WITH THE
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS, AS PUBLISHED BY
USDOT-FHWA, LATEST EDITION.
5. BARRICADES AND WARNING DEVICES MUST BE PROVIDED IN A GOOD STATE OF REPAIR.
6. UNNATURAL FILL MATERIALS/INDUSTRIAL DEBRIS IS SOIL CONTAINING BURIED DEBRIS FROM INDUSTRIAL OPERATIONS; MATERIALS INCLUDE, BUT ARE NOT LIMITED TO, METAL, PLASTIC, BRICK, CONCRETE, WOOD, CONTAINERS, GLASS, AND MATERIALS WITH UNUSUAL COLOR OR
ODOR. UPON DISCOVERY OF SUCH MATERIALS, NOTIFY THE CONTRACTING OFFICER, WHO
WILL ARRANGE FOR THE NAVFAC ENVIRONMENTAL DIVISION TO INSPECT THE MATERIALS.
SS
SD
GAS
W
UGE
UGC
OIL
CHAIN LINK FENCE
GUARDRAIL
SEWER LINE
DRAIN LINE
PROPANE LINE
WATER LINE
UNDERGROUND ELECTRIC LINE
UNDERGROUND COMMUNICATION LINE
UNDERGROUND FUEL LINE
REFERENCE DRAWING DRAIN LINE
REFERENCE DRAWING SEWER LINE
REFERENCE DRAWING WATER LINE
REFERENCE DRAWING ELECTRIC LINE
REFERENCE DRAWING COMMUNICATION LINE
REFERENCE DRAWING FUEL LINE
REFERENCE DRAWINGS INDUSTRIAL WASTE LINE
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
LIGHT POLE W/ CONC BASE
SEWER MANHOLE
CLEANOUT
YARD DRAIN
DRAIN MANHOLE
FIRE HYDRANT
WATER GATE VALVE
POST INDICATOR VALVE
WATER METER
COMMUNICATIONS MANHOLE
PAD MOUNTED TRANSFORMER
ELECTRIC MANHOLE
ELECTRIC HANDHOLE
COMMUNICATIONS HANDHOLE
BOLLARD
DECIDUOUS TREE
MONITORING WELL (MW)
GAS VALVE
HOSE REEL
BUILDING
OVERHANG
CONCRETE
CONCRETE CURB
EDGE OF PAVEMENT
RETAINING WALL
EXISTING LEGEND
DEMOLITION LEGEND
UTILITIES, FENCES,
STONE WALLS, ETC
AREAS (PAVED, GRAVEL,
VEGETATION, ETC)
W
ABBREVIATIONS:
RD
CF
CFS
CI
CMP
CONN
CIPP
CIP
CB
BLDG
BTWN
BOT
B/FTG, BOF
GALV
CORRUGATED METAL PIPE
CUBIC FEET PER SECOND
BOTTOM OF FOOTING
CAST IRON
CONNECTION
CUBIC FEET
CEMENT LINED
CAST-IN-PLACE OR CAST IRON PIPE
CATCH BASIN
BOTTOM
BUILDNG
BETWEEN
FTG
G
FLG
FT
FLR
FF
FDN
ES
EW
EXT
EXP
EL, ELEV
EQUIP
EQ
(E), EX, EXIST
EA
& AND
DIA OR Ø
DIM
DWG
DIP
NO OR #
GALVANIZED
EACH
FLANGE
FOOTING
FLOOR
FOOT
GAUGE
FINISH FLOOR
FOUNDATION
EACH WAY
EXTERIOR
EXPANSION
EXISTING
EQUIPMENT
EQUAL
ELEVATION
MISC
OC
OPNG
NP
MAX
MFR
MIN
LE
MH
OPENING
MISCELLANEOUS
NO PARKING
NUMBER
ON CENTER
LAW ENFORCEMENT
MANHOLE
MAXIMUM
MANUFACTURE
MINIMUM
DIAMETER
DIMENSION
DRAWING
DUCTILE IRON PIPE
LB
HOR, HORIZ HORIZONTAL
POUND
ROOF DRAIN
SMH
STR
ST
SCH
SF
SHT
S
SANITARY MANHOLE
STRAIGHT
STEAM
SCHEDULE
SHEET
SLOPE
SQUARE FEET
F FOOTING DESIGNATION
FV FIELD VERIFY
IN
INFO
INCH
INFORMATION
JT JOINT
MECH MECHANICAL
DMH DRAINAGE MANHOLE
OPP OPPOSITE
SECT SECTION
SLD STIFF LEG DERRICK
SPAC SPACING
SPECS SPECIFICATIONS
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
T TOP
TF TOP OF FRAME
TOP TOP OF PIPE
UNO UNLESS NOTED OTHERWISE
UD UNDERDRAIN
VER, VERT VERTICAL
VIF VERIFY IN FIELD
W/O W/
WITHOUT
WITH
WP WORK POINT
WT WEIGHT
CIA CONTROLLED INDUSTRIAL AREA
DEMO DEMOLISH
FW FRESH WATER
LF LINEAR FEET
FEAD FACILITY ENGINEERING ACQUISITION DIVISION
HWSF HAZARDOUS WASTE STORAGE FACILITY
TBM TEMPORARY BENCH MARK
BM BENCHMARK
CO CLEANOUT
CONC CONCRETE
FHWA FEDERAL HIGHWAY ADMINISTRATION
MW MONITORING WELL
IR INSTALLATION RESTORATION
SWL SINGLE WHITE LINE
SYL SINGLE YELLOW LINE
DC DIRECT CURRENT
AC ALTERNATING CURRENT
W WATTS
SS SANITARY SEWER
DYL DOUBLE YELLOW LINE
SD STORM DRAIN
VP VERTICAL PIPE
AB ABANDONED
SSF SANITARY SEWER FORCE MAIN
SSG SANITARY SEWER GRAVITY
REQ, REQDREQUIRED
AS AUTO SPRINKLER
VIT VITRIFIED CLAY PIPEID INSIDE DIAMETER
STM STEAM
DDT DRAINABLE-DRYABLE-TESTABLE
COND CONDUIT
CA COMPRESSED AIR/AIR
OD OUTSIDE DIAMETER
ELECTRICAL SWITCH
CCTV CLOSED CIRCUIT TELEVISION
VCP VITREOUS CLAY PIPE
MSL MEAN SEA LEVEL
STA STATION
N NORTHING
E EASTING
MP METAL PLATE
EP EDGE OF PAVEMENT
EM ELECTRICAL METER
EB ELECTRICAL BOX
EOI END OF INVESTIGATION
GRAN GRANITE
HTFP HEAT TRACE FREEZE PANEL
HP HIGH PRESSURE
HPCA HIGH PRESSURE COMPRESSED AIR
HW HOT WATER
I OR INV INVERT ELEVATION
(R) RECORD
R, RIM RIM ELEVATION
RCP REINFORCED CONCRETE PIPE
SBB SLOPED BITUMINOUS BERM
U UNKNOWN
UNK UNKNOWN UTILITY
VCC VERTICAL CONCRETE CURB
VGC VERTICAL GRANITE CURB
P.C. POINT OF CURVATURE
P.I. POINT OF INTERSECTION
P.R.C. POINT OF REVERSE CURVATURE
PIV POST INDICATOR VALVE
POC POINT OF CONNECTION
PREFAB PREFABRICATION
PS PHYSICAL SECURITY
PSF POUNDS PER SQUARE FEET
PSI POUNDS PER SQUARE INCH
P.T. POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PW PURE WATER
PWD PUBLIC WORKS DEPARTMENT
BMP SEE (C-502)
SIM SIMILAR
CR CONDENSATE RETURN
DDYL DOUBLE DASHED YELLOW LINE
HDPE HIGH DENSITY POLYETHYLENE PIPE
NTS NOT TO SCALE
TYP TYPICAL
AFG ABOVE FINISHED GRADE
C CHILLER
S
CO
D
DY
H
WV
P I V
WM
C
T
E E
C
MW
GV
ASPHALT PAVEMENT
PAVEMENT SAWCUT
CONCRETE
BUILDING ADDITION
OVERHANG/ CANOPY
RIPRAP
LOAM AND SEED
CATCH BASIN
DRAIN LINE
WATER GATE VALVE
WATER LINE
UNDERGROUND ELECTRICAL
ELECTRIC HANDHOLE
LIGHT W/ CONC BASE
POST INDICATOR VALVE (PIV)
TREES
SEDIMENT BARRIER
INLET PROTETION
PROPOSED LEGEND
D
W
UGE
E
SD
UGC
OIL
S
W
UGE
IW
TEMP TEMPERATURE
IW INDUSTRIAL WASTE
C.J. CONTROL JOINT
SED
DS
DS
DS
EM
(2)ES
W V
DSTH=78.7'
6" PVC INV.=76.4'
6" PVC INV.=76.4'
6" PVC INV.=76.6'
10" PVC INV.=76.5'
RD
TH=78.0'
FF=78.0'
W V
TBM 9702C
MAG NAIL SET IN
CONC. LIGHT POLE BASE
ELEV.=68.26'
RD
FF=68.2'
RD RD
ANCHOR IN
CONC
UGE
UGE
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UTILITY HATCH
CONTAINS 120V ELECTRICAL
OUTLET & POSSIBLE SEWER
CLEANOUT
W
W
W
W W
W
W
COMM
COMM
COMM
COMM
COMM
COMM
DMH 1201
R=67.6'
(A) 12" RCP I=64.2'
GENERATOR
ON CONC. PAD
6" PVC
FUEL TANK
ON CONC. PAD
METAL GRATE
CONC STEP
CONC
RETAINING
WALL
CONC
RETAINING
WALL
BUILDING 141
OHE OHEOHE OHE
CONDUIT
8" PVC
10" PVC
6" PVC
TRENCH
DRAIN
SYL
SY
L
VCC
VCC
VCC
VCC
EP
78.6'
61.6'
64.7'
70.8'
70.6'
WOOD
RAMP
CONDUIT ALONG
BUILDING FACE
CONC
OVERHANG
CONC
UG
E
U G
E
U G
E
GRAVEL
BUILDING 156
SD
TMB 9702D
MAG NAIL SET IN CONC.
ELEV.=79.35'
BUILDING 141
SHED
SD
SCALE:A1 EXISTING CONDITIONS PLAN
1" = 10'
8/1 7/2
6 3
:12 :11
P M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
CJ
1.D W
G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
20'0' 1"=10'
10'
1. EXISTING CONDITIONS DATA IS COMPILED FROM SITE SURVEY DATA
COMPLETED BY SAM, LLC ON 05/2720/26, SITE INVESTIGATIONS, AERIAL
PHOTO DATA, AND OWNER PROVIDED INFORMATION.
2. THE SITE SURVEY HAS BEEN PREPARED AS A T-1 TOPOGRAPHIC
SURVEY IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
20-300B-14 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES
(R.C.S.A.), LAST REVISED 2018-10-26.
3. FIELD SURVEY PERFORMED BY SAM LLC DURING MAY 2026 USING A
TOTAL STATION AND A SURVEY GRADE GPS WITH A DATA COLLECTOR
AND AN AUTO LEVEL. TRAVERSE ADJUSTMENT BASED ON LEAST
SQUARE ANALYSIS.
4. HORIZONTAL DATUM BASED ON CONNECTICUT STATE PLANE
NAD83(2011).
5. VERTICAL DATUM IS BASED ON APPROXIMATE NAVD88(GEOID18) (±.2')
DERIVED FROM REDUNDANT GPS OBSERVATIONS UTILIZING THE
KEYNET GPS VRS NETWORK.
6. PROPER FIELD PROCEDURES WERE FOLLOWED IN ORDER TO
GENERATE CONTOURS AT 2' INTERVALS. ANY MODIFICATION OF THIS
INTERVAL WILL DIMINISH THE INTEGRITY OF THE DATA, AND SAM LLC
WILL NOT BE RESPONSIBLE FOR ANY SUCH ALTERATION PERFORMED
BY THE USER.
7. UNDERGROUND UTILITIES AND INVERTS SHOWN HEREON ARE BASED
ON INFORMATION PROVIDED BY FELDMAN GEOSPATIAL AND THEIR
MARKINGS OBSERVED ON-SITE.
GENERAL NOTES
LEGEND
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
STORM DRAIN LINE
WATER LINE
UNDERGROUND ELECTRIC LINE
WALL MOUNTED ELECTRIC LINE
COMMUNICATIONS LINE
UNKNOWN UNDERGROUND UTILITY
BOLLARD
LIGHT POST
FIRE HYDRANT
WATER GATE VALVE
WENT PIPE
PAD MOUNTED TRANSFORMER
ELECTRIC BOX
AIR CONDITIONING UNIT
CATCH BASIN
DRAIN MANHOLE
TREE STUMP
RETAINING WALL
CONCRETE
LEDGE OUTCROP
GRAPHIC SCALE(S)
CJ101
EX
IS
TI
NG
C
ON
DI
TI
ON
S
PL
AN
12952101
HLS LDAMAF
XXX
AS NOTED
SD
W
UGE
OHE
COMM
SED
DS
DS
EM
(2)ES
W V
DSTH=78.7'
6" PVC INV.=76.4'
6" PVC INV.=76.4'
6" PVC INV.=76.6'
10" PVC INV.=76.5'
RD
TH=78.0'
FF=78.0'
W V
TBM 9702C
MAG NAIL SET IN
CONC. LIGHT POLE BASE
ELEV.=68.26'
RD
FF=68.2'
RD RD
ANCHOR IN
CONC
UGE
UGE
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UTILITY HATCH
CONTAINS 120V ELECTRICAL
OUTLET & POSSIBLE SEWER
CLEANOUT
W
W
W
W W
W
W
COMM
COMM
COMM
COMM
COMM
COMM
DMH 1201
R=67.6'
(A) 12" RCP I=64.2'
GENERATOR
ON CONC. PAD
6" PVC
FUEL TANK
ON CONC. PAD
METAL GRATE
CONC STEP
CONC
RETAINING
WALL
CONC
RETAINING
WALL
BUILDING 141
OHE OHEOHE OHE
CONDUIT
8" PVC
10" PVC
6" PVC
TRENCH
DRAIN
SYL
SY
L
VCC
VCC
VCC
VCC
EP
78.6'
61.6'
64.7'
70.8'
70.6'
WOOD
RAMP
CONDUIT ALONG
BUILDING FACE
CONC
OVERHANG
CONC
UG
E
U G
E
U G
E
GRAVEL
BUILDING 156
SD
TMB 9702D
MAG NAIL SET IN CONC.
ELEV.=79.35'
BUILDING 141
SHED
SD
REMOVE GENERATOR AND CONCRETE PAD
REMOVE ABOVE GROUND FUEL TANK
AND CONCRETE PAD, CONTRACTOR
MUST REMOVE FUEL IN TANK
REMOVE
ELECTRICAL
DUCTBANK
TEMPORARY 30KW PORTABLE GENERATOR WITH A 95
GALLON MINIMUM FUEL TANK ON A TRAILER.
CONTRACTOR RESPONSIBLE TO REFILL FUEL TANK DAILY.
TEMPORARY GENERATOR DOCKING STATION
SCALE:A1 SITE DEMOLITION PLAN
1" = 10'
8/1 7/2
6 3
:13 :39
P M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
CD
1.D W
G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
20'0' 1"=10'
10'
SEE ELECTRICAL SHEETS ED102 AND E-102 FOR ELECTRICAL DEMOLITION AND
NEW WORK SCOPE.
PHASE-1:
1. INSTALL TEMPORARY GENERATOR DOCKING STATION (GDS).
2. ROUGH-IN INTERCONNECTION BETWEEN TEMPORARY GENERATOR
DOCKING STATION AND EXISTING AUTOMATIC TRANSFER SWITCH (ATS)
IN ELEC ROOM 110.
3. INSTALL NEW EMERGENCY DISTRIBUTION PANEL EDP, AUTOMATIC
TRANSFER SWITCH (ATS) AND TRANSFORMER.
4. INSTALL NEW FEEDERS TO EXISTING EMERGENCY PANEL E21A,
EXISTING PANEL MDP-3, NEW EMERGENCY DISTRIBUTION PANEL EDP
AND NEW AUTOMATIC TRANSFER SWITCH.
PHASE-2:
*PHASE 2 CANNOT BEGIN UNTIL NEW GENSET IS ONSITE
1. CUTOVER TO TEMPORARY 30KW PORTABLE GENERATOR POWER.
2. DEMOLISH EXISTING 30KW GENERATOR.
3. DEMOLISH EXISTING FEEDERS TO EXISTING EMERGENCY PANEL E21A,
EXISTING PANEL MDP-3, AND EXISTING AUTOMATIC TRANSFER SWITCH.
4. DEMOLISH EXISTING AUTOMATIC TRANSFER SWITCH.
5. CONNECT NEW FEEDERS TO EXISTING EMERGENCY PANEL E21A,
EXISTING PANEL MDP-3, NEW EMERGENCY DISTRIBUTION PANEL EDP
AND NEW AUTOMATIC TRANSFER SWITCH.
PHASE-3:
1. INSTALL NEW 300KW GENERATOR.
2. REWORK EXISTING CONDUITS AND ROUTING FROM EXISTING
GENERATOR TO SERVE NEW GENERATOR.
3. INSTALL NEW FEEDER FROM NEW GENERATOR TO NEW AUTOMATIC
TRANSFER SWITCH (ATS).
PHASE-4:
1. CUTOVER TO PERMANENT STANDBY POWER VIA NEW 300KW
GENERATOR.
2. DEMOLISH TEMPORARY PORTABLE GENERATOR EQUIPMENT
(GENERATOR DOCKING STATION AND AUTOMATIC TRANSFER SWITCH
FEEDER).
PHASING AND SEQUENCE NOTES
GRAPHIC SCALE(S)
CD101
SI
TE
D
EM
OL
IT
IO
N
PL
AN
12952102
HLS LDAMAF
AS NOTED
SED
DS
DS
EM
(2)ES
W V
DSTH=78.7'
6" PVC INV.=76.4'
6" PVC INV.=76.4'
6" PVC INV.=76.6'
10" PVC INV.=76.5'
RD
TH=78.0'
FF=78.0'
W V
TBM 9702C
MAG NAIL SET IN
CONC. LIGHT POLE BASE
ELEV.=68.26'
RD
FF=68.2'
RD RD
ANCHOR IN
CONC
UGE
UGE
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UTILITY HATCH
CONTAINS 120V ELECTRICAL
OUTLET & POSSIBLE SEWER
CLEANOUT
W
W
W
W W
W
W
COMM
COMM
COMM
COMM
COMM
COMM
DMH 1201
R=67.6'
(A) 12" RCP I=64.2'
6" PVC
METAL GRATE
CONC STEP
CONC
RETAINING
WALL
CONC
RETAINING
WALL
BUILDING 141
OHE OHEOHE OHE
CONDUIT
8" PVC
10" PVC
6" PVC
TRENCH
DRAIN
SYL
SY
L
VCC
VCC
VCC
VCC
EP
78.6'
61.6'
64.7'
70.8'
70.6'
WOOD
RAMP
CONDUIT ALONG
BUILDING FACE
CONC
OVERHANG
CONC
UG
E
U G
E
GRAVEL
BUILDING 156
SD
TMB 9702D
MAG NAIL SET IN CONC.
ELEV.=79.35'
BUILDING 141
SHED
SD
UGE
UGE
C.
J.C.
J.
24.67'
7.83'
5'
2'
4'
7'
EQ EQ EQ
SCALE:A1 SITE LAYOUT AND UTILITY PLAN
1" = 10'
8/1 7/2
6 3
:16 :27
P M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
C-
1.D W
G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
20'0' 1"=10'
10'
MINIMUM DISTANCES:
1. 5' FROM BUILDING
2. 5' FROM HYDRANT
3. 3' FROM SIDEWALK
4. 1.5' BEHIND FACE OF CURB
GENERATOR SETBACK REQUIREMENTS
GRAPHIC SCALE(S)
C-101
SI
TE
LA
YO
UT
A
ND
U
TI
LIT
Y
PL
AN
12952103
HLS LDAMAF
AS NOTED
KEYNOTES
1. PROVIDE 300KW GENERATOR SET ENCLOSURE AND SUB-BASE TANK.
BASIS OF DESIGN FOOTPRINT: 23'-8" X 6'-10" 2,050 GAL SUB-BASE TANK,
SEE SHEET E-101
2. PROVIDE CONCRETE EQUIPMENT PAD WITH TWO TRANSVERSE
CONTROL JOINTS EQUALLY SPACED. CONCRETE PAD MUST BE SIZED
TO PROVIDE A MINIMUM OF 6" FROM THE EDGE OF THE GENERATOR TO
THE EDGE OF THE CONCRETE PAD. SEE DETAIL A1/C-502.
3. PROVIDE ELECTRICAL DUCTBANK FROM GENERATOR TO BUILDING 141,
SEE DETAIL A3/C-502
4. PROTECT TRENCH DRAIN WITH FILTER SOCK, SEE DETAIL A2/C-501
5. AIR INLET FOR GENERATOR
1. DIMENSIONS OF CONCRETE PAD DEPICTED ARE BASED ON BASIS OF
DESIGN GENSET WITH FOOTPRINT DIMENSIONS DESCRIBED IN KEY
NOTE 1 ON THIS SHEET.
GENERAL NOTES
SED
3/2
6 1
0:4 6:5
8 A M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
C-
1.D W
G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
X
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
C-501
ER
OS
IO
N
AN
D
SE
DI
ME
NT
AT
IO
N
CO
NT
RO
L N
OT
ES
A
ND
D
ET
AI
LS
HLS LDAMAF
AS NOTED
SOIL EROSION AND SEDIMENTATION CONTROL NOTES
EROSION AND SEDIMENTATION CONTROL FOR THIS PROJECT IS BASED UPON SOUND CONSERVATION PRACTICES, AND ADHERES TO THE STANDARDS DETAILED IN THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL" MANUAL DATED MARCH 2024. THE CONTRACTOR MUST BE FAMILIAR WITH THE AFOREMENTIONED PUBLICATION AND COMPLY WITH THE PRACTICES PRESENTED THEREIN.
A PERSON WHO CONDUCTS, OR CAUSES TO BE CONDUCTED, AN ACTIVITY THAT INVOLVES FILLING, DISPLACING OR EXPOSING SOIL OR OTHER EARTHEN MATERIALS MUST TAKE MEASURES TO PREVENT UNREASONABLE EROSION OF SOIL OR SEDIMENT BEYOND THE PROJECT SITE OR INTO A PROTECTED NATURAL RESOURCE MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS. MEASURES MUST REMAIN IN PLACE AND FUNCTIONAL UNTIL THE SITE IS PERMANENTLY STABILIZED. ADEQUATE AND TIMELY TEMPORARY AND PERMANENT STABILIZATION MEASURES
MUST BE TAKEN.
1 EROSION AND SEDIMENTATION CONTROL
1.1 POLLUTION PREVENTION: MINIMIZE DISTURBED AREAS AND PROTECT NATURAL DOWNGRADIENT BUFFER AREAS TO THE EXTENT PRACTICABLE. CONTROL STORMWATER VOLUME AND VELOCITY WITHIN THE SITE TO MINIMIZE SOIL EROSION. MINIMIZE THE DISTURBANCE OF STEEP SLOPES. CONTROL STORMWATER DISCHARGES, INCLUDING BOTH PEAK FLOW RATES AND VOLUME, TO MINIMIZE EROSION AT OUTLETS. THE DISCHARGE MAY NOT RESULT IN EROSION OF ANY OPEN DRAINAGE CHANNELS, SWALES, STREAM CHANNELS OR STREAM BANKS, UPLAND, OR COASTAL OR FRESHWATER WETLANDS OFF THE PROJECT SITE. WHENEVER PRACTICABLE, NO DISTURBANCE ACTIVITIES MUST TAKE PLACE WITHIN 50 FEET OF ANY PROTECTED NATURAL RESOURCE. IF DISTURBANCE ACTIVITIES TAKE PLACE BETWEEN 30 FEET AND 50 FEET OF ANY PROTECTED NATURAL RESOURCE, AND STORMWATER DISCHARGES THROUGH THE DISTURBED AREAS TOWARD THE PROTECTED NATURAL RESOURCE, PERIMETER EROSION CONTROLS MUST BE DOUBLED. IF DISTURBANCE ACTIVITIES TAKE PLACE LESS THAN 30 FEET FROM ANY PROTECTED NATURAL RESOURCE, AND STORMWATER DISCHARGES THROUGH THE DISTURBED AREAS TOWARD THE PROTECTED NATURAL RESOURCE, PERIMETER EROSION CONTROLS MUST BE DOUBLED AND DISTURBED AREAS MUST BE TEMPORARILY OR
PERMANENTLY STABILIZED WITHIN 7 DAYS.
1.2 SEDIMENT BARRIERS: PRIOR TO CONSTRUCTION, PROPERLY INSTALL SEDIMENT BARRIERS AT THE DOWNGRADIENT EDGE OF ANY AREA TO BE DISTURBED AND ADJACENT TO ANY DRAINAGE CHANNELS WITHIN THE DISTURBED AREA. SEDIMENT BARRIERS MUST BE INSTALLED DOWNGRADIENT OF SOIL OR SEDIMENT STOCKPILES AND STORMWATER PREVENTED FROM RUNNING ONTO THE STOCKPILE. MAINTAIN THE SEDIMENT BARRIERS BY REMOVING ACCUMULATED SEDIMENT, OR REMOVING AND REPLACING THE BARRIER, UNTIL THE DISTURBED AREA IS PERMANENTLY STABILIZED. WHERE A DISCHARGE TO A STORM DRAIN INLET OCCURS, IF THE STORM DRAIN CARRIES WATER DIRECTLY TO A SURFACE WATER AND YOU HAVE AUTHORITY TO ACCESS THE STORM DRAIN INLET, YOU MUST INSTALL AND MAINTAIN PROTECTION MEASURES THAT REMOVE SEDIMENT FROM THE DISCHARGE.
1.3 TEMPORARY STABILIZATION: WITHIN 7 DAYS OF THE CESSATION OF CONSTRUCTION ACTIVITIES IN AN AREA THAT WILL NOT BE WORKED FOR MORE THAN 7 DAYS, STABILIZE ANY EXPOSED SOIL WITH MULCH, OR OTHER NON-ERODIBLE COVER. STABILIZE AREAS WITHIN 75 FEET OF A WETLAND OR WATERBODY WITHIN 48 HOURS OF THE INITIAL DISTURBANCE OF THE SOIL OR PRIOR TO
ANY STORM EVENT, WHICHEVER COMES FIRST.
1.4 REMOVAL OF TEMPORARY MEASURES: REMOVE ANY TEMPORARY CONTROL MEASURES, SUCH AS SILT FENCE, WITHIN 30 DAYS AFTER PERMANENT STABILIZATION IS ATTAINED. REMOVE ANY ACCUMULATED SEDIMENTS AND STABILIZE.
1.5 PERMANENT STABILIZATION: IF THE AREA WILL NOT BE WORKED FOR MORE THAN ONE YEAR OR HAS BEEN BROUGHT TO FINAL GRADE, THEN PERMANENTLY STABILIZE THE AREA WITHIN 7 DAYS BY PLANTING VEGETATION, SEEDING, SOD, OR THROUGH THE USE OF PERMANENT MULCH, OR RIPRAP, OR ROAD SUB-BASE. IF USING VEGETATION FOR STABILIZATION, SELECT THE PROPER VEGETATION FOR THE LIGHT, MOISTURE, AND SOIL CONDITIONS; AMEND AREAS OF DISTURBED SUBSOILS WITH TOPSOIL, COMPOST, OR FERTILIZERS; PROTECT SEEDED AREAS WITH MULCH OR, IF NECESSARY, EROSION CONTROL BLANKETS; AND SCHEDULE SODDING, PLANTING, AND SEEDING SO TO AVOID DIE-OFF FROM SUMMER DROUGHT AND FALL FROSTS. NEWLY SEEDED OR SODDED AREAS MUST BE PROTECTED FROM VEHICLE TRAFFIC, EXCESSIVE PEDESTRIAN TRAFFIC, AND CONCENTRATED RUNOFF UNTIL THE VEGETATION IS WELL-ESTABLISHED WITH 90% COVER BY HEALTHY VEGETATION. IF NECESSARY, AREAS MUST BE REWORKED AND RESTABILIZED IF GERMINATION IS SPARSE, PLANT COVERAGE IS SPOTTY, OR TOPSOIL EROSION IS EVIDENT. ONE OR MORE OF THE FOLLOWING MAY APPLY TO A PARTICULAR SITE.
1.5.1 PAVER AREAS: FOR PAVED AREAS, PERMANENT STABILIZATION MEANS THE PLACEMENT OF THE COMPACTED GRAVEL SUBBASE IS COMPLETED, PROVIDED IT IS FREE OF FINE MATERIALS THAT MAY RUNOFF WITH A RAIN EVENT
1.6 WINTER CONSTRUCTION: "WINTER CONSTRUCTION" IS CONSTRUCTION ACTIVITY PERFORMED DURING THE PERIOD FROM NOVEMBER 1 THROUGH APRIL 15. IF DISTURBED AREAS ARE NOT STABILIZED WITH PERMANENT MEASURES BY NOVEMBER 1 OR NEW SOIL DISTURBANCE OCCURS AFTER NOVEMBER 1, BUT BEFORE APRIL 15, THEN THESE AREAS MUST BE PROTECTED AND
RUNOFF FROM THEM MUST BE CONTROLLED BY ADDITIONAL MEASURES AND RESTRICTIONS
1.6.1 SITE STABILIZATION: FOR WINTER STABILIZATION, HAY MULCH IS APPLIED AT TWICE THE STANDARD TEMPORARY STABILIZATION RATE. AT THE END OF EACH CONSTRUCTION DAY, AREAS THAT HAVE BEEN BROUGHT TO FINAL GRADE
MUST BE STABILIZED. MULCH MAY NOT BE SPREAD ON TOP OF SNOW.
1.6.2 SEDIMENT BARRIERS: ALL AREAS WITHIN 75 FEET OF A PROTECTED NATURAL RESOURCE MUST BE PROTECTED WITH A
DOUBLE ROW OF SEDIMENT BARRIERS.
2 INSPECTION AND MAINTENANCE
2.1 DURING CONSTRUCTION: THE FOLLOWING STANDARDS MUST BE MET DURING CONSTRUCTION
2.1.1 INSPECTION AND CORRECTIVE ACTION: INSPECT DISTURBED AND IMPERVIOUS AREAS, EROSION CONTROL MEASURES, MATERIALS STORAGE AREAS THAT ARE EXPOSED TO PRECIPITATION, AND LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE. INSPECT THESE AREAS AT LEAST ONCE A WEEK AS WELL AS BEFORE AND WITHIN 24 HOURS AFTER A STORM EVENT (RAINFALL), AND PRIOR TO COMPLETING PERMANENT STABILIZATION MEASURES. A PERSON WITH KNOWLEDGE OF EROSION AND STORMWATER CONTROL, INCLUDING THE STANDARDS AND CONDITIONS IN THE PERMIT, MUST CONDUCT
THE INSPECTIONS.
2.1.2 MAINTENANCE: IF BEST MANAGEMENT PRACTICES (BMPS) NEED TO BE REPAIRED, THE REPAIR WORK MUST BE INITIATED UPON DISCOVERY OF THE PROBLEM BUT NO LATER THAN THE END OF THE NEXT WORKDAY. IF ADDITIONAL BMPS OR SIGNIFICANT REPAIR OF BMPS ARE NECESSARY, IMPLEMENTATION MUST BE COMPLETED WITHIN 7 CALENDAR DAYS AND PRIOR TO ANY STORM EVENT (RAINFALL). ALL MEASURES MUST BE MAINTAINED IN EFFECTIVE OPERATING CONDITION
UNTIL AREAS ARE PERMANENTLY STABILIZED.
2.1.3 DOCUMENTATION: KEEP A LOG (REPORT) SUMMARIZING THE INSPECTIONS AND ANY CORRECTIVE ACTION TAKEN.
THE LOG MUST INCLUDE THE NAME(S) AND QUALIFICATIONS OF THE PERSON MAKING THE INSPECTIONS, THE DATE(S) OF THE INSPECTIONS, AND MAJOR OBSERVATIONS ABOUT THE OPERATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS, MATERIALS STORAGE AREAS, AND VEHICLES ACCESS POINTS TO THE PARCEL. MAJOR OBSERVATIONS MUST INCLUDE BMPS THAT NEED MAINTENANCE, BMPS THAT FAILED TO OPERATE AS DESIGNED OR PROVED INADEQUATE FOR A PARTICULAR LOCATION, AND LOCATION(S) WHERE ADDITIONAL BMPS ARE NEEDED. FOR EACH BMP REQUIRING MAINTENANCE, BMP NEEDING REPLACEMENT, AND LOCATION NEEDING ADDITIONAL BMPS, NOTE IN THE LOG THE CORRECTIVE ACTION TAKEN AND WHEN IT WAS TAKEN. THE LOG MUST BE MADE ACCESSIBLE TO DEPARTMENT STAFF AND A COPY MUST BE PROVIDED UPON REQUEST. THE PERMITTEE MUST RETAIN A COPY OF THE LOG FOR A PERIOD OF AT LEAST THREE YEARS FROM THE COMPLETION
OF PERMANENT STABILIZATION.
3 HOUSEKEEPING
3.1 SPILL PREVENTION: CONTROLS MUST BE USED TO PREVENT POLLUTANTS FROM CONSTRUCTION AND WASTE MATERIALS STORED ON SITE TO ENTER STORMWATER, WHICH INCLUDES STORAGE PRACTICES TO MINIMIZE EXPOSURE OF THE MATERIALS TO STORMWATER. THE SITE CONTRACTOR OR OPERATOR MUST DEVELOP, AND IMPLEMENT AS NECESSARY, APPROPRIATE SPILL
PREVENTION, CONTAINMENT, AND RESPONSE PLANNING MEASURES.
3.2 FUGITIVE SEDIMENT AND DUST: ACTIONS MUST BE TAKEN TO ENSURE THAT ACTIVITIES DO NOT RESULT IN NOTICEABLE EROSION OF SOILS OR FUGITIVE DUST EMISSIONS DURING OR AFTER CONSTRUCTION. OIL MAY NOT BE USED FOR DUST CONTROL, BUT OTHER WATER ADDITIVES MAY BE CONSIDERED AS NEEDED. A STABILIZED CONSTRUCTION ENTRANCE (SCE) MUST BE INCLUDED TO MINIMIZE TRACKING OF MUD AND SEDIMENT. IF OFF-SITE TRACKING OCCURS, PUBLIC ROADS MUST BE SWEPT IMMEDIATELY AND NO LESS THAN ONCE A WEEK AND PRIOR TO SIGNIFICANT STORM EVENTS. OPERATIONS DURING DRY MONTHS, THAT EXPERIENCE FUGITIVE DUST PROBLEMS, MUST WET DOWN UNPAVED ACCESS ROADS ONCE A WEEK OR MORE FREQUENTLY AS
NEEDED WITH A WATER ADDITIVE TO SUPPRESS FUGITIVE SEDIMENT AND DUST.
3.3 DEBRIS AND OTHER MATERIALS: MINIMIZE THE EXPOSURE OF CONSTRUCTION DEBRIS, BUILDING AND LANDSCAPING MATERIALS, TRASH, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE AND OTHER MATERIALS TO PRECIPITATION AND STORMWATER RUNOFF. THESE MATERIALS MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE.
3.4 EXCAVATION DE-WATERING: EXCAVATION DE-WATERING IS THE REMOVAL OF WATER FROM TRENCHES, FOUNDATIONS, COFFER DAMS, PONDS, AND OTHER AREAS WITHIN THE CONSTRUCTION AREA THAT RETAIN WATER AFTER EXCAVATION. IN MOST CASES THE COLLECTED WATER IS HEAVILY SILTED AND HINDERS CORRECT AND SAFE CONSTRUCTION PRACTICES. SEE CONSTRUCTION
DEWATERING NOTES 1 THROUGH 7 ON C-001 FOR SITE SPECIFIC DEWATERING REQUIREMENTS.
3.5 AUTHORIZED NON-STORMWATER DISCHARGES: IDENTIFY AND PREVENT CONTAMINATION BY NON-STORMWATER DISCHARGES.
WHERE ALLOWED NON-STORMWATER DISCHARGES EXIST, THEY MUST BE IDENTIFIED AND STEPS MUST BE TAKEN TO ENSURE THE IMPLEMENTATION OF APPROPRIATE POLLUTION PREVENTION MEASURES FOR THE NON-STORMWATER COMPONENT(S) OF THE
DISCHARGE. AUTHORIZED NON-STORMWATER DISCHARGES ARE:
3.5.1 DISCHARGES FROM FIREFIGHTING ACTIVITY;
3.5.2 FIRE HYDRANT FLUSHINGS;
3.5.3 DUST CONTROL RUNOFF IN ACCORDANCE WITH PERMIT CONDITIONS AND APPENDIX (C)(3);
3.5.4 ROUTINE EXTERNAL BUILDING WASHDOWN, NOT INCLUDING SURFACE PAINT REMOVAL, THAT DOES NOT INVOLVE
DETERGENTS;
3.5.5 PAVEMENT WASHWATER (WHERE SPILLS/LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE NOT OCCURRED, UNLESS
ALL SPILLED MATERIAL HAD BEEN REMOVED) IF DETERGENTS ARE NOT USED;
3.5.6 UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE;
3.5.7 UNCONTAMINATED GROUNDWATER OR SPRING WATER;
3.5.8 FOUNDATION OR FOOTER DRAIN-WATER WHERE FLOWS ARE NOT CONTAMINATED;
3.5.9 UNCONTAMINATED EXCAVATION DEWATERING (SEE REQUIREMENTS IN APPENDIX C(5));
3.5.10 POTABLE WATER SOURCES INCLUDING WATERLINE FLUSHINGS; AND
3.5.11 LANDSCAPE IRRIGATION.
3.6 UNAUTHORIZED NON-STORMWATER DISCHARGES:
3.6.1 WASTEWATER FROM THE WASHOUT OR CLEANOUT OF CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING
COMPOUNDS OR OTHER CONSTRUCTION MATERIALS;
3.6.2 FUELS, OILS OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE;
3.6.3 TOXIC OR HAZARDOUS SUBSTANCES FROM A SPILL OR OTHER RELEASE.
PLAN
SECTION
SANDBAG OR CONCRETE BLOCK (25 LB MIN) (10' OC)
AREA TO BE PROTECTED
12" FILLED SILT SOCK
NOTES:
1. PROVIDE PHOTO DEGRADABLE SYNTHETIC
NETTING TUBE WITH 1/8" MESH OPENINGS.
WATER FLO
W
12" FILTER SOCK
ZIP TIE OR WIRETIE TO SOCK MESH (OPTIONAL)
SANDBAG OR CONCRETE BLOCK (25 LB MIN)
WORK AREA AREA TO BE PROTECTED
WORK AREA
EX GRADE
EXISTING BASINSILTSACK
SILTSACK
CATCH BASIN
FRAME OR
BASIN OPENING
1" DIA REBAR FOR
LIFTING AND REMOVAL
(TYP)
CATCH BASIN
PLACE SILTSACK IN
EX FRAME
EX GRATE MAY BE
REPLACED DURING
CONSTRUCTION
NOTES:
1. REMOVE SEDIMENT FROM SILT SACK AFTER RAIN EVENT OR WHEN TRAPPED SEDIMENT IS
EVIDENT IN THE BOTTOM OF THE SILTSACK.
FLOW
1' M
IN
2' MIN
EXISTING GROUND
FILL SLOPE
NOTES:
1. EROSION CONTROL MIX CAN BE MANUFACTURED ON OR OFF THE SITE. IT MUST CONSIST PRIMARILY OF ORGANIC MATERIAL SEPARATED AT THE POINT OF GENERATION, AND MAY INCLUDE: SHREDDED BARK, STUMP GRINDINGS, COMPOSTED BARK, OR FLUME GRIT AND FRAGMENTED
WOOD GENERATED FROM WATER-FLUME LOG HANDLING SYSTEMS.
WOOD CHIPS, GROUND CONSTRUCTION DEBRIS, REPROCESSED WOOD PRODUCTS OR BARK CHIPS ARE NOT ACCEPTABLE AS THE ORGANIC
COMPONENT OF THE MIX.
PROVIDE EROSION CONTROL MIX WITH A WELL-GRADED MIXTURE OF PARTICLE SIZES AND CONTAINING ROCKS LESS THAN 4" IN DIAMETER.
PROVIDE EROSION CONTROL MIX FREE OF REFUSE, PHYSICAL CONTAMINANTS, AND MATERIAL TOXIC TO PLANT GROWTH AND WHICH MEETS
THE FOLLOWING STANDARDS:
A. ORGANIC MATERIAL: BETWEEN 50% - 100% (DRY WEIGHT BASIS)
B. PARTICLE SIZE: BY WEIGHT, 100% PASSING 6" SCREEN, 70-85% PASSING 0.75" SCREEN
C. THE ORGANIC PORTION NEEDS TO BE FIBROUS AND ELONGATED
D. LARGE PORTIONS OF SILTS, CLAYS OR FINE SANDS ARE NOT ACCEPTABLE IN THE MIX
E. SOLUBLE SALTS CONTENT BE LESS THAN 4.0 MMHOS/CM
F. PH: 5.0 - 8.0
2. THE BARRIER MUST CONFORM TO THE ABOVE DIMENSIONS ON SLOPES LESS THAN 5% OR AT THE BOTTOM OF SLOPES LESS THAN 20 FEET LONG WITH SLOPES AT 2:1 OR FLATTER ON LONGER OR STEEPER SLOPES, PROVIDE A WIDER BARRIER TO ACCOMMODATE THE ADDITIONAL
FLOW.
3. PLACE THE BARRIER ALONG A RELATIVELY LEVEL ELEVATION. CUT TALL GRASSES OR WOODY VEGETATION TO AVOID CREATING VOIDS AND BRIDGES THAT WOULD ENABLE FINES TO WASH UNDER THE BARRIER THROUGH THE GRASS BLADES OR PLANT STEMS.
4. PROVIDE OTHER BMP'S AT LOCATIONS BELOW:
A. AT LOW POINTS OF CONCENTRATED FLOW
B. BELOW CULVERT OUTLET APRONS
C. WHERE A PREVIOUS STAND-ALONE EROSION CONTROL MIX APPLICATION HAS FAILED
D. AT THE BOTTOM OF STEEP PERIMETER SLOPES THAT ARE MORE THAN 50 FEET FROM TOP TO BOTTOM (LARGE UPGRADIENT WATERSHED)
E. AROUND CATCH BASINS AND CLOSED STORM DRAIN SYSTEMS.
5. INSPECT EROSION CONTROL MIX BARRIERS REGULARLY AND AFTER EACH LARGE RAINFALL. REPAIR DAMAGED SECTIONS OF BARRIER IMMEDIATELY BY REPLACING OR ADDING ADDITIONAL MATERIAL TO THE DESIRED HEIGHT AND WIDTH.
6. REMOVE SEDIMENT DEPOSITS WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
STAKE ON 10'
LINER
SPACING*
WATER FLOW
WORK AREA
AREA TO BE
PROTECTED
PLAN VIEW SECTION
2"x2" WOODEN STAKE*
8" DIAMETER SILT
SOCK
WORK AREA
AREA TO BE
PROTECTED
1'- 0"
SILT SOCK SIZE PER
MANUFACTURER
RECOMMENDATIONS
* OMIT WOODEN STAKES WHEN PLACING SEDIMENT BARRIER ON ASPHALT OR CONCRETE PAVEMENT
3" -4
SCALE:A1 SILT SACK INLET CONTROL DETAIL
NOT TO SCALE SCALE:A2 SEDIMENT BARRIER - FILTER SOCK ON PAVED SURFACES
NOT TO SCALE SCALE:A4 SEDIMENT BARRIER - FILTER SOCK
NOT TO SCALE
SCALE:C4 SEDIMENT BARRIER - BERM MIX
NOT TO SCALE
Lee D.
Allen
L
I C E N S E
D
P R
O F
E S S I O NA L E NG
I N E
E R
ST
AT E OF MA I NE
08-13-2026
SED
7/2
6 3
:26 :21
P M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
C-
2.D W
G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
C-502
CI
VI
L C
ON
ST
RU
CT
IO
N
AN
D
UT
ILI
TY
D
ET
AI
LS
12952105
HLS LDAMAF
AS NOTED
12" CONCRETE 5,000 PSI MACRO-FIBER REINFORCED
CONCRETE, DOSED AT 5 LB/CY SLAB ON GRADE.
6" MIN
4"
SCALE:A1 CONCRETE EQUIPMENT PAD DETAIL
NOT TO SCALE
CONSTRUCT IN ACCORDANCE WITH CT DOT SECTION 9.21
3/4" CHAMFER ALL
EXPOSED EDGES, TYP.
EXISTING COMPACTED SUBGRADE
(COMPACTED TO 95% OF STANDARD
PROCTOR, ASTM D698)
RESTORE EXISTING
GRAVEL SURFACE
SCALE:A3 4-WAY SERVICE TRENCH DETAIL
NOT TO SCALE
MIN TYP ALL SIDES
3" MIN. SEPARATION
BETWEEN CONDUITS (TYP)
DETECTABLE
WARNING TAPE
3" HDPE SPACERS
2'-
0" C
OV
ER
(M
IN
SAND BEDDING THAT
CONFORMS TO AASHTO M6
6" CLEAR
CONSTRUCT IN ACCORDANCE WITH NAVFAC UTILITY STANDARDS AND CT DOT SECTION 10.08
(1) 2-1/2" SCH 80
PVC CONDUIT
(3) 3/4" SCH 80
PVC CONDUIT
GENSET EQUIPMENT
34" LAYER OF CRUSHED STONE (CT DOT M.01.02-2 #67)
WRAPPED IN GEOTEXTILE FABRIC (BOTTOM OF
CRUSHED STONE MUST BE 3.5' BELOW FINISHED GRADE
RESTORE EXISTING
GRAVEL SURFACE
BACKFILL WITH
SATISFACTORY MATERIAL
SED
A-001
GE
NE
RA
L N
OT
ES
, A
BB
RE
VI
AT
IO
NS
, A
ND
LE
GE
ND
12952106
TJC EACECL
XXX
AS NOTED
8/1 4/2
6 1
0:1 9:1
0 A M
C:
\C
CE
D
RO
PB
OX
\C
OL
BY
C
OM
PA
NY
E
NG
IN
EE
RI
NG
\E
NG
IN
EE
RI
NG
\29 7 P
OR
TS
MO
UT
H
NA
VA
L S
HI
PY
AR
D\
7.3
.00
1 - G
RO
TO
N B.
1 N
SM
RL
G
EN
ER
AT
OR
R
EP
LA
CE
ME
NT
\D
RA
W
IN
GS
\S
HE
ET
S\
A-
1.D W
G
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM
CHIEF ENG/ARCH
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
NA
VA
L S
UB
MA
RI
NE
B
AS
E
NE
W
LO
ND
ON
GR
OT
ON
, C T
PW
D
FE
AD
N
EW
LO
ND
ON
SU
BA
SE
N
EW
LO
ND
ON
G
RO
TO
N, C
T
DRAWFORM REVISION: 14 SEP 2023
1904124
B
G
E N
E R
A
TO
R R
E P
LA
C
E M
E N
T
08/12/2026
M
AR
K D
ES
C
R
IP
TI
O
N
BRANCH MANAGER
FIRE PROTECTION
CONTRACT NO.
KWA
SCALE:
D
SED
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N D
AT
E
/1
3/
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
APPROVED BY LOUIS DEFLICE
VIA EMAIL
TYPICAL ABBREVIATIONS: GRAPHIC LEGEND: GENERAL NOTES:MATERIAL LEGEND:
CONCRETE BLOCK (SECTION)
GYPSUM BOARD
PLYWOOD
BATT INSULATION
@ AT
# NUMBER
± PLUS OR MINUS
W/ WITH
ABA/ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD
ABI ALTERNATE BID ITEM
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISHED FLOOR
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CT CERAMIC TILE
DEMO DEMOLITION
DIA DIAMETER
DN DOWN
DWG DRAWING
(E) EXISTING
EA EACH
EF EXHAUST FAN
EL ELEVATION
ELEC ELECTRICAL
EQ EQUAL
ETC ETCETERA
ETR EXISTING TO REMAIN
EXP EXPOSED TO STRUCTURE
EXST EXISTING
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FLR FLOOR
FR FIRE RATED
FT FEET
GA GAUGE
GC GENERAL CONTRACTOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GYP BD GYPSUM BOARD
HGT HEIGHT
HM HOLLOW METAL
IAW IN ACCORDANCE WITH
INSUL INSULATION/INSULATED
IT INFORMATION TECHNOLOGY
L LOUVER
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
M.A. MASONRY OPENING
MR MOISTURE RESISTANT
MTL METAL
N.I.C. NOT IN CONTRACT
NTS NOT TO SCALE
OCC OCCUPANCY
OPP OPPOSITE
PLAM PLASTIC LAMINATE
PT PRESSURE TREATED
PTD PAINTED
RB RUBBER BASE
R.O. ROUGH OPENING
SF SQUARE FEET
SIM SIMILAR
SPEC SPECIFICATION
SQ.FT SQUARE FEET
STC SOUND TRANSMISSION CLASS
T.0. TOP OF
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
U.N.O UNLESS NOTED OTHERWISE
VB VINYL BASE
V.I.F. VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
WC WATER CLOSET
WD WOOD
WALL TYPE
DOOR TAG
KEYED NOTES
WINDOW TAG
SIGNAGE TAG
X
XXX
X'-X"
MS
PLAN
NORTH
MOTION SENSOR, SEE
ELECTRICAL
DIMENSION LINE
ROOM DESIGNATION
ROOM NUMBER
NORTH ARROW
EXISTING ITEMS TO REMAIN
ITEMS TO BE REMOVED
ITEMS TO BE PROVIDED
ARCHITECTURAL LINE TYPE
LEGEND:
1. FIELD VERIFY DIMENSIONS AND CONDITIONS. PROMPTLY NOTIFY THE CONTRACTING OFFICER OF ANY INCONSISTENCIES OR OTHER PROBLEMS IN WRITING IMMEDIATELY UPON DISCOVERY, AND BEFORE PROCEEDING
WITH THE WORK.
2. ALL INDICATIONS AND NOTATIONS ON THE DRAWINGS APPLYING TO ONE AREA, COMPONENT OR CONDITION, MUST APPLY TO ALL OTHER SIMILAR AREAS, COMPONENTS AND CONDITIONS, UNLESS CLEARLY INDICATED.
3. PRESERVE AND MAINTAIN EXISTING CONDITIONS OF ANY SURFACES WHICH WILL REMAIN EXPOSED IN THE FINISHED WORK. SURFACES DAMAGED BY DEMOLITION WORK MUST BE REPAIRED AS REQUIRED TO MATCH THE EXISTING
SURFACE.
4. DO NOT DAMAGE THE EXISTING BUILDING ENCLOSURE AND ITS PARAMETERS, INCLUDING DURING STRUCTURE DEMOLITION. PROVIDE REPAIR WORK TO MATCH EXISTING FOR ANY DAMAGE THAT OCCURS DURING DEMOLITION, AT NO ADDITIONAL COST OR SCHEDULE TO GOVERNMENT.
5. WHERE EXISTING SURFACES ARE TO BE FRAMED OR FURRED TO RECEIVE NEW FINISHES, ENSURE THAT THE EXISTING SURFACES HAVE BEEN COMPLETELY CLEANED OF EXISTING CONTAMINANTS AND/OR SURFACE DIRT AND THAT EXISTING FINISHES HAVE BEEN REMOVED DOWN TO BARE SUBSTRATE PRIOR TO ENCLOSING OR RECEIVING
NEW FINISHES.
6. BUILDING MUST BE FULLY SECURED DURING AND AT THE END OF EACH WORK PERIOD.
7. DIMENSIONS ARE TAKEN FROM FACE OF FINISHED CONSTRUCTION UNLESS NOTED OTHERWISE. CLEAR DIMENSIONS ARE TO FINISHED FACE OF CONSTRUCTION AND MUST TAKE PRECEDENCE OVER ANY OTHER
DIMENSION.
8. NEW, EXISTING, THRU-WALL AND ABANDONED PENETRATIONS MUST BE SEALED. PENETRATIONS THROUGH FIRE RATED AND SMOKE RATED ASSEMBLIES MUST BE FIRE AND SMOKE SEALED AS REQUIRED TO MAINTAIN RATINGS.
FIRE STOPPING AND SEALING OF PENETRATIONS MUST BE COMPLETED WITH APPROPRIATE UL LISTED ASSEMBLY AND MUST BE INSTALLED IN ACCORDANCE WITH LISTED SYSTEM. PENETRATIONS THROUGH RATED ASSEMBLIES ARE GENERALLY IDENTIFIED ON THE ARCHITECTURAL PLANS. FIRESTOPPING SUBCONTRACTORS MUST ALSO COORDINATE WITH ARCHITECTURAL AND ELECTRICAL DRAWINGS TO CONFIRM NECESSARY FIRESTOPPING PRIOR
TO CONSTRUCTION.
9. PROVIDE SEALANTS TO AREAS PER STANDARD PRACTICE TO MEET OR EXCEED ANY WEATHER, SOUND, AND FIRE
REQUIREMENTS PER EACH MANUFACTURER'S DETAILED INSTRUCTIONS.
10. OWNER/TENANTS WILL MOVE PERSONAL ITEMS PRIOR TO WORK TAKING PLACE IN SPECIFIC AREAS. MOVE AND REPLACE TO ORIGINAL LOCATIONS OR PROTECT: DESKS, CHAIRS, BOOKCASES, FILE CABINETS OR ANY OTHER
FURNITURE AS NEEDED TO ACCESS WORK LOCATIONS.
11. COORDINATE AND CONTRACT WITH STATE, LOCAL, AND UTILITY ENTITIES AS NECESSARY TO EXECUTE THE CONTRACT DOCUMENTS. UTILITIES AND SERVICES AFFECTED BY THE WORK INCLUDE, BUT ARE NOT LIMITED TO ELECTRICAL. THIRD PARTY TESTING AGENCIES MUST BE FIRST-TIER SUBCONTRACTORS TO THE CONTRACTOR, AND PROVIDE COPIES OF TEST REPORTS TO THE SPECIFIED AGENCIES AND THE OWNER. OBTAIN PERMITS AND
COORDINATE INSPECTION AND ACCEPTANCE TESTS WITH AUTHORITY HAVING JURISDICTION.
12. INFILL, PATCH AND PAINT SURFACES WHERE ELECTRICAL DEVICES HAVE BEEN REMOVED IN LOCATIONS THAT WILL
BE VISIBLE. THE REPAIR MUST MATCH EXISTING ADJACENT MATERIAL.
X
A
THIS PROJECT INCLUDES BUILDINGS 141 & 156 OF SIGNIFICANT HISTORICAL
IMPORTANCE AND IS ELIGIBLE FOR LISTING ON THE NATIONAL REGISTER OF HISTORIC
PLACES. THE CONTRACTOR AS WELL AS ALL INDIVIDUALS WORKING ON THIS PROJECT
MUST PROVIDE AN ADDITIONAL LEVEL OF CARE AND ATTENTION TO AVOID ANY
DAMAGE TO THE EXISTING BUILDING'S HISTORIC FABRIC, SURFACES, FINISHES, AND
SYSTEMS THAT REMAIN IN PLACE. HISTORIC ORIGINAL BUILDING ELEMENT INCLUDE
BUT ARE NOT LIMITED TO, THE EXTERIOR FACADE CONSTRUCTION. ANY AND ALL
DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATION MUST BE REPAIRED OR
REPLACED ONLY AS…