Amendment #1 Electronic Attachments 2 & 9, Submittal Forms A & H Modified with Amendment #1.docx

DOCX document 131 KB Posted

Attached to
RFP 2527H098 ATLAS Replacement Project -Federally Funded - AMENDED
Solicitation number
RFP 2527H098 ATLAS Replacement Project -Federally Funded - AMENDED
Issued by
Anchorage Municipality, Alaska

About this file

This is Amendment #1 to an RFP issued by the Alaska Department of Transportation and Public Facilities for the ATLAS Replacement Project, a federally funded procurement. The RFP seeks a single contract award to a qualified firm to provide a modern, cloud-based crew scheduling and management system for Alaska Marine Highway System (AMHS) ferry operations. The solution must be either a Software as a Service (SaaS) or Commercial Off-The-Shelf (COTS) product capable of automating complex crew scheduling for a fleet of nine vessels while managing three distinct union bargaining units, each with unique contractual requirements, seniority rules, and scheduling constraints. Proposals must be received no later than 2:00 PM prevailing Alaska Time on September 11, 2026, submitted in accordance with the RFP requirements; faxed or oral proposals will not be accepted. Amendment #1 provides answers to questions received from potential bidders, modifies specific sections of the RFP, updates attachments, and incorporates Federal Transit Administration (FTA) provisions and required forms. All bidders must register with the Procurement Officer, Chris Hunt, at (907) 465-8448 or chris.hunt@alaska.gov to receive subsequent amendments.

The RFP includes nondiscrimination requirements in accordance with Title VI of the Civil Rights Act of 1964, ensuring that disadvantaged business enterprises are afforded full opportunity to submit bids and will not be discriminated against. The solicitation documents are available for download in Adobe Acrobat format through the Online Public Notice website, and copies are also available upon request from the Procurement Officer. Failure to register with the Procurement Officer may result in rejection of an offer. This amendment is mandatory for all interested bidders and modifies the original submittal forms and electronic attachments associated with the RFP.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM A – Offeror Information Revised March 13, 2024

PROJECT INFORMATION

RFP NUMBER:
2527H098
PROJECT NAME:
ATLAS Replacement Project – Federally Funded

OFFEROR INFORMATION

Company Name:

Address:

Tax ID:

Alaska Business License #:

CONTACT INFORMATION

Provide contact information for the individual that can be contacted for clarification regarding this proposal:

Name

Title

Address

Email

Telephone

PROCUREMENT OFFICER NOTE: REVISE OR DELETE AS REQUIRED.

CRITICAL TEAM MEMBERS

Provide the names of all critical team members that will be assigned to this contract. Note: These individuals cannot be removed or replaced from this project, or their positions, unless approved in writing the project director or procurement officer.

Name of Position 1

Name of Position 2

Name of Position 3

Name of Position 4

ADDENDA ACKNOWLEDGEMENT

The offeror acknowledges receipt of the following amendments and has incorporated the requirements of such amendments into their proposal. Failure to identify and sign for all amendments may subject the offeror to disqualification. The offeror must list all amendments (by number), then initial and date to confirm that you have received and incorporated them into your proposal (add more rows as necessary).

Number
Initials & Date
Number
Initials & Date
Number
Initials & Date

CERTIFICATIONS

No
Criteria
Response*
1
The offeror is presently engaged in the business of providing the services & work required in this RFP.
True | False
2
The offeror confirms that it has the financial strength to perform and maintain the services required under this RFP.
True | False
3
The offeror accepts the terms and conditions set out in the RFP and agrees not to restrict the rights of the state.
True | False
4
The offeror confirms that they can obtain and maintain all necessary insurance as required on this project.
True | False
5
The offeror certifies that all services provided under this contract by the contractor and all subcontractors shall be performed in the United States.
True | False
6
The offeror is not established and headquartered or incorporated and headquartered, in a country recognized as Tier 3 in the most recent United States Department of State’s Trafficking in Persons Report.
True | False
7
Offeror complies with the American with Disabilities Act of 1990 and the regulations issued thereunder by the federal government.
True | False
8
Offeror complies with the Equal Employment Opportunity Act and the regulations issued thereunder by the federal government.
True | False
9
Offeror complies with the applicable portion of the Federal Civil Rights Act of 1964.
True | False
10
The offeror can provide (if requested) financial records for the organization for the past three years.
True | False
11
The offeror has not had any contracts terminated by the State of Alaska (within the past five years).
True | False
12
The offeror certifies that it is not currently debarred, suspended, proposed for debarment, or declared ineligible for award by any public or federal entity.
True | False
13
The offeror certifies that they will not support or participate in a boycott of Israel. Failure to comply with this requirement may cause the state to reject the proposal as non-responsive or cancel the contract.
True | False
14
The offeror certifies that they do not have any governmental or regulatory action against their organization that might have a bearing on their ability to provide services to the state.
True | False
15
The offeror certifies, within the last five years, they have not been convicted or had judgment rendered against them for: fraud, embezzlement, theft, forgery, bribery, falsification or destruction of records, false statements, or tax evasion.
True | False
16
The offeror does not have any judgments, claims, arbitrations or suits pending/outstanding against your company in which an adverse outcome would be material to the company.
True | False
17
The offeror is not (now or in the past) been involved in bankruptcy or reorganized proceeding.
True | False
18
Offeror certifies they comply with the laws of the State of Alaska.
True | False
19
Offeror confirms their proposal will remain valid and open for at least 90 days.
True | False

* Failure to answer or answering “False” may be grounds for disqualification. For any “False” responses, provide clarification (up to 250 word maximum for each “False” clarification) below (add rows as necessary).

Section
Clarification

CONFLICT OF INTEREST STATEMENT

Indicate below whether or not the firm or any individuals that will work on the contract has a possible conflict of interest (e.g., currently employed by the State of Alaska or formerly employed by the State of Alaska within the past two years) and, if so, the nature of that conflict. The procurement officer reserves the right to consider a proposal non-responsive and reject it or cancel the award if any interest disclosed from any source could either give the appearance of a conflict or cause speculation as to the objectivity services to be provided by the offeror.

Does the offeror, or any individuals that will work on this contract, have a possible conflict of interest?
□ Yes □ No

* Failure to answer may be grounds for disqualification.

If “Yes”, please provide additional information regarding the nature of that conflict:

FEDERAL REQUIREMENTS

Indicate below all known federal requirements that apply to the proposal, proposal evaluation, or contract:

SIGNATURE

This proposal must be signed by a company officer empowered to bind the company.

Printed Name

Title

Date

Signature

STATE OF ALASKA – REQUEST FOR PROPOSALS AMENDMENT #1
RFP 2527H098

ATLAS REPLACEMENT PROJECT -FEDERALLY FUNDED

SUBMITTAL FORM H – SYSTEM REQUIREMENTS

SPECIAL REQUIREMENTS: This Submittal Form must not identify the offeror’s proposed costs and must not exceed thirty-six (36) pages (reference RFP section 4.02).

ALASKA MARINE HIGHWAY SYSTEM

Dispatch Management System

SYSTEM REQUIREMENTS

Alaska Department of Transportation & Public Facilities Version 1.6 | September 2026

1. Introduction This document defines the system requirements for the Alaska Marine Highway System (AMHS) Dispatch Management System (DMS), which will replace the current Atlas dispatch software. Requirements were derived from 23 structured interviews and observation sessions conducted by Planet Technologies with subject matter experts across all functional areas of AMHS dispatch operations between May and July 2025.

Requirements are organized into 16 functional categories and assigned a priority level based on operational criticality. The priority framework is:

1. Must Have: A critical requirement; absence significantly reduces system value.

1. Could Have: Desirable enhancement that would provide operational benefit but is not critical to baseline function.

Each requirement is accompanied by its operational source and a current-state gap description. Requirements are coded by category prefix (e.g., EMP, SCH, QUA) and sequence number for traceability. This document should be read in conjunction with the AMHS DMS Concept of Operations (ConOps).

2. Requirements Summary by Category

#
Category
Must Have
Could Have
Total
1
Employee Profile & Master Data
6
1
7
2
Seniority & Bargaining Unit Rules
6
1
7
3
Crew Scheduling & Vacancy Filling
16
3
19
4
Qualifications, Credentials & Training
20
4
24
5
Leave & Absence Management
5
0
5
6
Travel Coordination
6
2
8
7
Payroll & Timesheet Management
7
1
8
8
Seatime Letters
9
1
10
9
Communication & Audit Logging
5
1
6
10
Reporting & Analytics
6
1
7
11
System Integration
9
0
9
12
Security, Access & Technical Standards
15
0
15
13
Performance & Usability
11
2
13
14
Implementation & Vendor Obligations
9
1
10
15
Cloud Governance & Data Sovereignty
9
0
9
16
Availability & Disaster Recovery
7
0
7
TOTAL
146
18
164

3. Detailed Requirements

1. Employee Profile and Master Data Staff across all functional areas rely on employee profile data as their primary lookup for contact information, bargaining unit, change port, and status. Atlas frequently has stale or incomplete data, and no field values can be copied out of the interface.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
EMP-001
Must Have
Maintain a unified employee record including name, Employee ID (EID), bargaining unit, position, change port, home address, phone number(s), and personal email address.
All Dispatch, Travel, Payroll
Data frequently stale; cannot copy/paste any values from Atlas
Choose an item.
EMP-002
Must Have
Allow users to copy employee contact information (phone, email, address) from the interface without requiring manual retyping.
Passenger Services
Atlas does not support copy/paste of any data fields
Choose an item.
EMP-003
Must Have
Track employee active/inactive status and reason (suspended, retired, resigned, separated, admin leave, etc.) with effective dates.
IBU Dispatch
Status history exists but requires manual entry for most status types
Choose an item.
EMP-004
Must Have
Store and display complete position and job history for each employee, including all bargaining units they have belonged to.
Atlas Introduction
Supported but slow to navigate
Choose an item.
EMP-005
Must Have
Provide an employee self-service portal where crew members can view their own profile, update contact information, and see their current schedule and qualifications.
Passenger Services, Union Needs
Original Atlas intent; never implemented
Choose an item.
EMP-006
Must Have
Support bulk import of new hire data from an external applicant tracking/onboarding system (e.g., NeoGov) to eliminate manual re-entry.
Passenger Services
No integration; all new hire data manually entered by dispatch admin
Choose an item.
EMP-007
Could Have
Generate and maintain an internal employee directory searchable by name, bargaining unit, change port, position, and vessel.
Shoreside Travel
Must currently use separate State of Alaska directory
Choose an item.

2. Seniority and Bargaining Unit Rules AMHS operates under three distinct union contracts (IBU, MEBA, MMP), each with unique seniority hierarchies, vacation accrual rules, and scheduling provisions. Contracts are renegotiated every three years.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
SEN-001
Must Have
Support distinct seniority hierarchies for each bargaining unit. For IBU: Job Points → Admin Award Date → Department Points → Company Points → Hire Date. Support equivalent hierarchies for MEBA and MMP.
IBU Dispatch
Atlas supports IBU hierarchy; MEBA/MMP less well supported
Choose an item.
SEN-002
Must Have
Display seniority-ordered lists of available employees for any given position, vessel, or change port, filterable in real time.
IBU Dispatch
Must print and manually annotate lists; Atlas too slow for real-time use
Choose an item.
SEN-003
Must Have
Support Dispatch Selection Forms (DSF) that allow IBU employees to opt out of specific vessels, regions, or position types, and enforce those restrictions during vacancy filling.
IBU Dispatch
DSF data stored in Atlas but must be manually cross-referenced
Choose an item.
SEN-004
Must Have
Allow rule sets for each bargaining unit to be configured by administrators without vendor involvement, to accommodate contract updates every three years.
IT Standards, Union Needs
Any Atlas rule change requires vendor development
Choose an item.
SEN-005
Must Have
Track and display point accumulation for each employee across job points, department points, and company points, updated per contract cycle rules.
IBU Dispatch
Visible in Atlas but update latency is 2-4 weeks
Choose an item.
SEN-006
Must Have
Support MEBA quarterly point cycles (points earned every 9 months) separately from IBU biweekly cycles.
MEBA Dispatch
MEBA seniority managed largely outside Atlas
Choose an item.
SEN-007
Could Have
Generate on-demand bargaining unit seniority reports in a format suitable for posting per contract requirements.
IBU Dispatch
Reports available but require manual formatting and annotation
Choose an item.

3. Crew Scheduling and Vacancy Filling IBU dispatchers fill vacancies on a biweekly cycle, while MEBA and MMP plan on quarterly scrolls. Vacancy filling requires cross-referencing vessel schedule, employee availability, qualifications, seniority, DSF restrictions, and change port proximity.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
SCH-001
Must Have
Provide a unified scheduling view showing, for each vessel and time period: bid holder, relief employee, leave status, and assignment dates for all bargaining units.
All Dispatch
No unified view; dispatchers maintain separate paper scrolls
Choose an item.
SCH-002
Must Have
Display vessel schedule (port calls, dates, status) alongside crew assignment data so dispatchers can determine where and when crew changes occur.
IBU Dispatch
Vessel schedule is a separate public website; not integrated with Atlas
Choose an item.
SCH-003
Must Have
Support filtering of available, qualified employees by change port, vessel, position/qualification, bargaining unit, and availability status (not on vacation, unfit, or already assigned).
IBU Dispatch
Requires navigating multiple Atlas screens and printed lists
Choose an item.
SCH-004
Must Have
Support the IBU Riff bumping process: automated calculation of cascading position reassignments based on seniority hierarchy when bid holders are displaced. Allow dispatcher to review and confirm the proposed outcome before committing.
IBU Dispatch
Atlas Riff Math tool exists but requires extensive manual verification
Choose an item.
SCH-005
Must Have
Track and enforce minimum manning requirements by vessel, reflecting both the Certificate of Inspection (COI) minimums and any active Transition Memos that specify different requirements.
MMP Dispatch
Transition memo requirements tracked manually on paper scroll
Choose an item.
SCH-006
Must Have
Track vessel operational status (Revenue Service, Layup Moving, Layup Stationary, Overhaul) and display this alongside crew assignments.
MMP Dispatch, MEBA Dispatch
Vessel status tracked on color-coded paper scrolls; not in Atlas
Choose an item.
SCH-007
Must Have
Support the MEBA Hall temporary hire process: identify when a position must be filled from the MEBA Hall, generate referral information with complete vacancy details, and track Hall-filled positions separately from regular AMHS employees.
MEBA Dispatch
Hall fills tracked manually; automated email to Hall not supported
Choose an item.
SCH-008
Must Have
Allow posting of the official crew list for each vessel and bargaining unit, with version history and date/time stamp.
IBU Dispatch
Atlas supports posting but process is manual and error-prone
Choose an item.
SCH-009
Must Have
Support quarterly scroll planning (4-month horizon) for MEBA and MMP, with a visual calendar/grid view showing assignments per vessel per two-week rotation, automatically driving timesheet pre-population.
MEBA Dispatch, MMP Dispatch
Quarterly scroll is Excel-based; Atlas only receives the result for timesheet generation
Choose an item.
SCH-010
Must Have
Track holdover (overtime beyond the regular rotation) assignments separately and distinguish them from standard bid and relief assignments.
MMP Dispatch
Holdovers tracked on paper scroll only
Choose an item.
SCH-011
Must Have
Display pier head jump emergency vacancy indicators (vessel sails within 6-12 hours) and support expedited assignment workflow that may prioritize location proximity over strict seniority order per applicable LOA, with documentation of the deviation and justification.
Union Needs
No system support; handled entirely by phone and institutional knowledge
Choose an item.
SCH-012
Could Have
Support employee self-service availability calendaring so crew members can indicate availability or unavailability for specific dates or vessels.
Passenger Services
No self-service capability currently exists
Choose an item.
SCH-013
Must Have
Support the MEBA Hall temporary hire process end-to-end: when a MEBA position cannot be filled internally, automatically generate an email notification to the MEBA Hall with complete vacancy details (vessel, position, dates, qualifications required). Provide a means for the Hall to supply temp employee information that creates a provisional record in the system, assigned a temporary PCN.
MEBA Dispatch
Handled by manual email and manual data entry. Temp PCNs tracked in a notebook. No system support for the Hall communication loop or temp record creation.
Choose an item.
SCH-014
Must Have
Track temporary employee PCN (Position Classification Number) assignments separately from permanent bid PCNs. Automatically convert a temp PCN to a permanent PCN once the associated PARF is approved and the bid has been physically worked by the employee.
MEBA Dispatch, MMP Dispatch
Temporary PCNs manually tracked in notebooks. PCN conversion is entirely manual with no system trigger or validation, leading to data integrity errors.
Choose an item.
SCH-015
Could Have
Draft proposed MEBA crew lists based on scheduling constraints (seniority hierarchy, qualifications, vessel status, scroll commitments) and present the draft to the MEBA dispatcher for review and modification before publishing.
MEBA Dispatch
MEBA crew lists built from scratch manually each cycle using Atlas, seniority scrolls, and paper records. No system-assisted drafting capability.
Choose an item.
SCH-016
Must Have
Provide an interface for the MMP committee to submit key operational data used in quarterly crew list creation (voyage schedules, relief windows, position requirements). Automatically notify the MMP dispatcher when committee data has been received and is ready for review.
MMP Dispatch
MMP committee data delivered via email and entered manually by dispatcher. No system-based data handoff or dispatcher notification workflow.
Choose an item.
SCH-017
Must Have
Provide a bid application review interface for supervisors and Port Stewards: display employee contact information, current assignment status, total hours worked in the relevant eligibility period, minimum qualification status, and bid history in one view. Capture the reviewer decision (approved, conditionally approved, denied) and documented reason in the system.
Passenger Services, MMP Dispatch
Bid review requires gathering data manually from Atlas, IRIS hours records, and paper qualification files. Decisions and reasoning not captured in any system.
Choose an item.
SCH-018
Could Have
When an IBU vacancy is filled, automatically notify all relevant stakeholders via system-generated email: the vessel Master, the vessel Chief Mate, the employee vacating the position, and all IBU Dispatch staff. The notification must include the employee name, position, vessel, and effective date.
IBU Dispatch
Post-fill notifications are sent manually via Outlook. No automated notification or tracking exists in Atlas; inconsistent delivery creates operational and union compliance risk.
Choose an item.
SCH-019
Must Have
When a vacancy is filled incorrectly or an assignment error occurs, display relevant details explaining why the error occurred and surface upcoming request data to help dispatchers identify and prevent similar mistakes.
IBU Dispatch
There is no system alert when a leave request is entered but remains in pending status. If a vacation is signed but not converted, it does not appear during crew list creation, and the missing relief only surfaces day-of. This type of error occurs almost every two-week crewing cycle
Choose an item.

4. Qualifications, Credentials, and Training Crew assignments are constrained by credential requirements. Coast Guard credentials (MMC, TWIC, medical certificates), position-specific certifications, and pilotage endorsements (MMP) must all be current and verified before assignment. Tracking is managed across Atlas, Marinals LMS, and manual Excel sheets.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
QUA-001
Must Have
Track all Coast Guard credentials per employee: Merchant Mariner Credential (MMC), TWIC card, medical certificate (2-year and 5-year), food worker card, alcohol management certification, TAPS card, and HAZMAT certification, with expiration dates.
Vessel Crew Docs
Supported in Atlas but data loss on save requires manual double-checking
Choose an item.
QUA-002
Must Have
Track pilotage endorsements for MMP deck officers by geographic area, type (day vs. unlimited), and inclusion vs. exclusion list status, and enforce these requirements during scheduling.
MMP Dispatch, Vessel Crew Docs
Atlas cannot differentiate day vs. unlimited pilotage; manual Excel sheets required
Choose an item.
QUA-003
Must Have
Generate automated alerts and reports for credentials expiring within configurable timeframes (e.g., 30, 60, 90 days), filterable by employee, vessel, bargaining unit, and credential type.
Vessel Crew Docs
Atlas generates CSV exports; staff manually apply color-coding in Excel
Choose an item.
QUA-004
Must Have
Support batch/bulk entry of the same credential or course completion for multiple employees simultaneously (e.g., entering STCW BT completion for 20 employees at once).
Vessel Crew Docs
Atlas requires one-by-one entry for every employee: no batch capability
Choose an item.
QUA-005
Must Have
Confirm every credential save with a visible success indicator. The system must not discard records without notification.
Vessel Crew Docs
Atlas known to silently discard saves; staff must exit and re-enter to verify
Choose an item.
QUA-006
Must Have
Support attaching scanned credential documents (PDF, JPG) to employee credential records. Automatically convert JPEG/image files to PDF upon upload for document standardization.
Vessel Crew Docs
Atlas supports attachments via Z-drive link only; JPEG-to-PDF requires manual conversion
Choose an item.
QUA-007
Must Have
Generate a GAP report per employee showing required minimum qualifications for a given position vs. what the employee currently holds, with clear indication of what is missing and what is expiring.
Training, MEBA Dispatch
Atlas GAP reports exist but are confusing and omit expiration dates
Choose an item.
QUA-008
Must Have
Receive training completion data from the Marinals LMS with a maximum 24-hour lag (vs. current 2-4 week lag), so that dispatcher qualification checks reflect recent training.
Training
Current 2-4 week lag causes dispatchers to miss recent completions
Choose an item.
QUA-009
Must Have
Support future-effective credential documents: allow entry of a credential received in advance of its validity date (e.g., renewed MMC submitted months before current one expires), storing it as pending with an activation date, and automatically replacing the current credential when the activation date is reached.
Vessel Crew Docs
No Atlas support for future-effective documents; manual re-entry required at the right time, creating risk of lapsed credentials
Choose an item.
QUA-010
Must Have
Support multi-course certificates (e.g., HCT = 13 individual courses; HCT Refresher = 3 courses) as a single credential entry, automatically verified when all constituent courses are complete.
Vessel Crew Docs
Atlas cannot group courses into composite certificates; tracked manually
Choose an item.
QUA-011
Must Have
Define parent qualifications composed of multiple sub-qualifications (e.g., STCW Basic Safety Training grouping BT, PSC, EFA, and FPFF). GAP reports must evaluate parent qualification status based on completion of all constituent sub-qualifications.
Training, Vessel Crew Docs
Atlas lists every sub-qualification separately; GAP reports confusing and hard to interpret
Choose an item.
QUA-012
Must Have
Support alternative qualifications: when an employee holds an alternate credential that satisfies a minimum qualification requirement, display it as qualifying but in a visually distinct format (e.g., alternate color or label) to distinguish primary from alternate qualifications.
Training, MEBA Dispatch
Atlas does not distinguish primary from alternative qualifications in reports
Choose an item.
QUA-013
Must Have
Allow employee self-service document upload for credential renewals. Provide a document legibility review tool for the Vessel Crew Docs clerk: display submitted documents at full resolution, allow flagging as illegible, and automatically notify the employee with specific feedback on resubmission requirements.
Passenger Services, Vessel Crew Docs
No self-service capability: approximately 50% of documents are rejected and rejection feedback is manual email
Choose an item.
QUA-014
Must Have
Track and manage training course enrollment, scheduling, and completion for AMHS-sponsored courses, including recording requests for future course planning when courses are full; organizing registrations by seniority and request date; and transferring approved registrations to partnering educator registration logs.
Training
Training coordination handled via separate Excel sheets outside Atlas; demand not tracked
Choose an item.
QUA-015
Could Have
Provide course description and prerequisite information within the system so that dispatchers and new employees can understand credential requirements without institutional knowledge.
Training
No course information in Atlas; separate Internal Resources website required
Choose an item.
QUA-016
Could Have
When a training request is approved, automatically send the employee: (a) a leave request form reminder, and (b) course information and class flyer.
Training
Both communications sent manually for every approved request
Choose an item.
QUA-017
Must Have
Automatically calculate whether a vessel crew member meets the minimum hours threshold for bid eligibility based on total hours worked in the relevant period. Display the hours calculation alongside bid application records so the reviewing supervisor can verify eligibility without a separate IRIS lookup.
Passenger Services, IBU Dispatch
Hours calculation done manually by Port Stewards reviewing separate IRIS payroll records. No integrated hours-to-eligibility calculation in Atlas.
Choose an item.
QUA-018
Must Have
Maintain qualification metadata for each credential type: issuing authority, renewal frequency, applicable positions, and whether the credential is primary or an accepted alternative. Allow training administrators to update metadata configuration without vendor involvement.
Training, Vessel Crew Docs
Atlas stores credential dates but not metadata such as issuing authority, renewal cycle, or position applicability. Metadata maintained in separate spreadsheets.
Choose an item.
QUA-019
Must Have
Support automatic generation of new learner profiles in the Marinals LMS when a new employee record is created in the DMS. Automatically populate the LMS profile with verified Merchant Mariner Credential (MMC) data from the DMS to eliminate dual-system data entry.
Training, IT Standards
New employee LMS profiles created manually after DMS/IRIS onboarding. MMC data entered separately in both systems, creating duplication and discrepancy risk.
Choose an item.
QUA-020
Could Have
Record the date that a training authorization memo is sent for each approved training request and maintain a full audit trail of training approval communications: request received, eligibility confirmed, memo sent, course registered, and completion recorded.
Training
Training communication dates are tracked only in personal email and an Excel log. No system record of authorization memo send dates.
Choose an item.
QUA-021
Could Have
Provide interactive filter controls on qualification and GAP reports: display crew with a specific qualification, crew without a specific qualification, or crew with expiring credentials within a defined window. All report results must be exportable to Excel.
Training, Vessel Crew Docs
Atlas qualification reports require exact parameter entry and cannot be filtered interactively. Generating a list of crew without a specific qualification requires manually cross-referencing two separate reports.
Choose an item.
QUA-022
Must Have
Provide a dedicated interface for the Vessel Crew Docs clerk to manage training-related timesheets: identify AMHS-funded course completions in Marinals that qualify for training pay, alert the clerk to eligible completions, support creation of training-specific timesheets pre-populated with course and employee data, route timesheets for approval, and automatically deliver approved timesheets to the employee (via portal and email) and to payroll/IRIS.
Vessel Crew Docs
Clerk manually reviews 2,500+ Marinals completions every two weeks to identify paid-course completions. Training timesheets created manually, emailed to employees manually, and submitted to payroll separately. No system workflow connects these steps.
Choose an item.
QUA-023
Must Have
Format and distribute credential compliance reports automatically: apply color-coding for expiration urgency (expired=red, within 30 days=orange, within 60 days=yellow) and distribute via email to (a) vessel supervisors for their assigned crew and (b) individual employees whose credentials fall within the alert threshold.
Vessel Crew Docs
Compliance reports generated in Atlas, manually reformatted in Excel with color-coding added by hand, then manually emailed to each vessel and affected individual. Process takes several hours per cycle.
Choose an item.
QUA-024
Must Have
Provide a dedicated interface for the Vessel Crew Docs clerk to manage NMC pilotage details: enter, update, and track pilotage endorsements received from the National Maritime Center per crew member, with automatic linkage to the employee credential profile and scheduling eligibility evaluation.
Vessel Crew Docs
Pilotage details from the NMC entered manually in Atlas with no dedicated workflow or tracking. Link between NMC pilotage data and scheduling eligibility is entirely manual.
Choose an item.

5. Leave and Absence Management Leave management (vacation, FMLA, unfit for duty) is central to crew scheduling. Leave statuses trigger crew list updates, affect seniority/benefit calculations, and must sync with payroll. Currently, leave is entered through multiple channels with significant manual reconciliation.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
LEV-001
Must Have
Track and display all leave types per employee: vacation (approved/pending), FMLA, unfit for duty (with return date if known), administrative leave, and suspension.
All Dispatch, Payroll
Atlas stores leave status but often lags 2-4 weeks; vacation approval workflow is manual
Choose an item.
LEV-002
Must Have
Support a vacation approval workflow: employee or supervisor submits request, dispatcher reviews, approves or denies, and the system automatically updates crew list and seniority tracking.
IBU Dispatch
Current workflow: paper form, handed to admin, manually entered to Atlas; often missed when comparing crew lists
Choose an item.
LEV-003
Must Have
Generate leave timesheets automatically when an employee misses a scheduled assignment due to an approved leave status, pre-populated with correct leave type and pay rate.
Payroll
Atlas generates blank timesheets; leave coding is manual and error-prone
Choose an item.
LEV-004
Must Have
Alert dispatchers and HR when an employee has not worked for 60 or more days within any 90-day rolling period, as this affects health insurance eligibility under union contracts.
Union Needs
No automated absence monitoring; requires manual review
Choose an item.
LEV-005
Must Have
Display leave balance information from IRIS (vacation accrued, vacation taken, sick leave) within the DMS employee profile, with a defined sync frequency.
Union Needs
Leave balances only accessible via IRIS; not visible in Atlas
Choose an item.

6. Travel Coordination When dispatchers fill a vacancy, they must also coordinate crew travel to the vessel. Dispatch handles travel for employees moving between assignments (travel status), while Shoreside Travel handles employees in work status and all shoreside employee travel.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
TRV-001
Must Have
Support the generation of travel quotes for crew assignments, including comparison of travel from change port vs. home address to identify the least-cost option per union contract rules.
Shoreside Travel
Travel quotes generated manually; no system support
Choose an item.
TRV-002
Must Have
Track travel status vs. work status for vessel employees to determine which team (Dispatch vs. Shoreside Travel) is responsible for booking and costs, and display the responsible party in the employee record.
Shoreside Travel
Status determination is manual; leads to miscommunication and duplicate bookings
Choose an item.
TRV-003
Must Have
Maintain CTM (Corporate Travel Management system) travel profile information within the DMS employee record to support travel booking without requiring separate profile lookups.
Shoreside Travel
CTM profiles exist separately; vessel employees use generic union-level profiles
Choose an item.
TRV-004
Must Have
Track reimbursement requests for employee travel, including receipt collection, approval workflow, and status tracking, with export of approved reimbursement data for IRIS entry.
Shoreside Travel
Tracked via email receipts and separate IRIS entry; fragmented process
Choose an item.
TRV-005
Could Have
Integrate with the Corporate Travel Management (CTM) system (or successor travel system) to allow travel bookings to be initiated from the DMS assignment workflow.
Shoreside Travel
CTM is a completely separate system with no Atlas integration
Choose an item.
TRV-006
Must Have
Provide an employee self-service travel request interface where crew members can submit travel requests prior to an assignment. The interface must collect and store the following travel authorization data fields: full name, job title, mailing address, submission date, bargaining unit, birth date, travel begin and end dates, destination(s), purpose of trip, staff assigned to prepare the reservation, mode of transportation, number of trip segments, and segment-specific travel details. Additionally collect: cost center, approving supervisor name, and bargaining unit travel entitlement. All fields must be stored within the DMS travel record and accessible to the Shoreside Travel admin for booking purposes.
Shoreside Travel
Travel requests arrive via phone or email with no standard intake process. Authorization details tracked in separate spreadsheets. Employees frequently omit required information, necessitating follow-up calls.
Choose an item.
TRV-007
Must Have
Support submission of travel booking data to the state-approved travel management system (currently CTM): generate a CTM-compatible travel record from DMS assignment and employee data to reduce manual re-keying by the Shoreside Travel admin.
Shoreside Travel
All CTM bookings manually entered by the Shoreside Travel admin after gathering data from dispatch, payroll records, and employee contact. No data flow between DMS and CTM.
Choose an item.
TRV-008
Could Have
Provide the Shoreside Travel Admin Assistant with access to a dedicated per diem verification view that displays: employee vessel assignment, pay type (e.g., E100 regular vs. E175 leave), vessel status (Revenue Service, Layup, Overhaul), and hours worked for the prior 90 days. The view must include vessel-level detail sufficient to determine whether the vessel kitchen was operational during an overhaul period, as this determines per diem food reimbursement eligibility.
Shoreside Travel
Per diem verification currently requires cross-referencing ATLAS payroll history with external vessel status records. Vessel kitchen operational status during overhaul is not captured in Atlas, requiring manual confirmation.
Choose an item.

7. Payroll and Timesheet Management AMHS payroll is described as the most manual timesheet process in the State of Alaska. Atlas generates blank timesheets; vessel supervisors complete them by hand; payroll staff manually key every line into IRIS. Approximately 80% require corrections.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
PAY-001
Must Have
Generate pre-populated timesheets including: employee name and EID, vessel name, bargaining unit, position, assignment dates, assignment type (bid/relief), and applicable pay code, eliminating the need for vessel supervisors to fill in this information manually.
Payroll
Atlas generates blank timesheets with only name and EID
Choose an item.
PAY-002
Must Have
Include start and stop times on generated timesheets in compliance with state policy (not just total hours).
Payroll
Start/stop times must be manually added by supervisors or payroll
Choose an item.
PAY-003
Must Have
Support all bargaining unit pay codes and overtime calculation rules (daily overtime, holdover overtime, minimum guarantee) per IBU, MEBA, and MMP contracts.
Payroll
Pay code application is entirely manual; no rule automation in Atlas
Choose an item.
PAY-004
Must Have
Provide a missing timesheet tracking workflow that identifies employees whose timesheets have not been received by the deadline and notifies relevant dispatch and payroll staff.
Payroll
Tracked via biweekly Teams spreadsheet maintained by timekeeper
Choose an item.
PAY-005
Must Have
Provide an employee payroll history view within the DMS showing vessel, pay type (E100 regular vs. E175 leave), vessel status, and assignment dates for the prior 90 days.
Shoreside Travel
Available in Atlas via Time Collection but lags 2-4 weeks
Choose an item.
PAY-006
Must Have
Export timesheet data in a format compatible with IRIS data entry to reduce manual keying by payroll technicians (target: XML file via FTP or approved successor interface).
Payroll, IT Standards
No export; all data keyed manually into IRIS. IRIS XML/FTP interface specification: https://doa.alaska.gov/dof/iris/resource/INT_ISD_TADI_XML.pdf
Choose an item.
PAY-007
Could Have
Provide a Majority of Time (MOT) calculation that determines which position an employee worked most during a pay period, to support determination of correct pay rate for non-bid holders.
Payroll
MOT calculated manually from IRIS data; not available in Atlas
Choose an item.
PAY-008
Must Have
Provide crew members with digital access to their pre-populated timesheets so they can review, confirm hours, and flag discrepancies within the system. Additionally, identify and alert dispatch and payroll when a timesheet is absent for an employee who was recorded as unfit for duty, prompting creation of the required Personnel Action Request Form (PARF).
Payroll, All Dispatch
Crew have no DMS timesheet access. Unfit-for-duty PARF requirements tracked via a shared spreadsheet. Approximately 80% of timesheets require corrections, with unfit-related miscodings being a major contributor.
Choose an item.

8. Seatime Letters The seatime clerk produces Coast Guard-required proof-of-service letters for mariners renewing licenses or seeking new endorsements. Approximately 532 letters were produced in the most recent cycle. Three different Atlas tools return different totals for the same employee.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
SEA-001
Must Have
Generate seatime letters in the format required by the U.S. Coast Guard, including: employee name, EID, vessel name(s), position(s), date ranges, and aggregate seatime by department (deck, engine, purser, steward).
Seatime Letters
Atlas output is incorrectly formatted and missing required statements
Choose an item.
SEA-002
Must Have
Automatically include required Coast Guard statements in all seatime letters: (1) drug testing program participation statement, (2) engine yard time calculation (0.5 day per day in yards), (3) inside passage geographic designation.
Seatime Letters
All statements must currently be manually added in Word
Choose an item.
SEA-003
Must Have
Produce a single, consistent seatime total per employee per letter that reconciles all service periods, eliminating the current discrepancy between three different Atlas seatime tools that return different values.
Seatime Letters
Three Atlas tools return different totals; manual reconciliation required
Choose an item.
SEA-004
Must Have
Support appending new seatime to an existing letter (patching), so that a mariner's full career history is maintained as a single cumulative document updated with each letter request. Automatically combine duplicate vessel/position rows and recalculate department totals.
Seatime Letters
Patching done manually in Word from prior letter; fragile and time-consuming
Choose an item.
SEA-005
Must Have
Determine drug testing statement eligibility automatically: employee qualifies if (a) they have had a urinalysis within the last 185 days, OR (b) they have worked 60 or more days in the last 185 days.
Seatime Letters
UA Assessment tool vastly undercounts eligible days; manual override required for nearly every letter
Choose an item.
SEA-006
Must Have
Support reactivating inactive employees (retired, resigned, separated) temporarily for seatime letter generation without affecting other system reports or dispatching functions.
Seatime Letters
Manual activate/deactivate required in Atlas; risk of contaminating other reports
Choose an item.
SEA-007
Must Have
Maintain a seatime letter tracking log per employee: request date, letter sent date, mailing date, drug statement eligibility, prior letter end date, and any notes or errors.
Seatime Letters
Maintained in Excel; 532 entries; no system support
Choose an item.
SEA-008
Could Have
Import or reconcile historical seatime data from pre-2010 service periods stored in legacy spreadsheets and archived records.
Seatime Letters
Pre-2010 data unreliable in Atlas; kept in separate spreadsheets
Choose an item.
SEA-009
Must Have
Allow the seatime clerk to review and manually update a generated letter draft before finalization: add narrative notes, correct date ranges, adjust department subtotals, and override drug test statement eligibility when supporting documentation warrants an exception.
Seatime Letters
Atlas generates a draft but the clerk must export to Word and manually correct errors for virtually every letter. No in-system editing capability exists; the export-edit-reimport cycle introduces transcription risk.
Choose an item.
SEA-010
Must Have
Export finalized seatime letters to PDF and support application of a digital signature by the authorized signatory. Deliver the signed letter to the requesting mariner via system and email. Maintain a delivery confirmation log with timestamp.
Seatime Letters
Atlas output must be pasted into a Word template, printed, wet-signed, scanned to PDF, and manually emailed. No digital signature support, no direct system delivery, and no delivery confirmation log.
Choose an item.

9. Communication and Audit Logging Dispatch operations generate high volumes of phone calls, emails, and notifications. There is no system record of who was called, when, or what was communicated, creating significant union grievance risk. AMHS has also experienced inconsistent union notification for required personnel transactions.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
COM-001
Must Have
Provide built-in call/contact logging that captures: employee contacted, date/time, method (phone/email/text), number of contact attempts, result (reached/voicemail/no answer), and dispatcher notes.
Union Needs
No call logging capability in Atlas; entirely paper-based or institutional memory
Choose an item.
COM-002
Must Have
Generate automatic notifications to union representatives when employee personnel transactions occur (new appointments, separations, status changes) per contract requirements.
Union Needs
Notifications currently not sent consistently; contractual compliance risk
Choose an item.
COM-003
Must Have
Maintain a complete, tamper-evident audit log of all system actions: who made a change, what was changed, when, and what the prior value was. This log must not be editable by any user.
IT Standards, Vessel Crew Docs
Atlas does not maintain an accessible audit log
Choose an item.
COM-004
Must Have
Support broadcast notification to groups of employees (e.g., all IBU deck employees with Valdez change port) via email and/or SMS for vacancy announcements or urgent operational communications.
Union Needs, All Dispatch
All employee notifications sent via manual email or phone calls
Choose an item.
COM-005
Must Have
Log all dispatch assignment decisions with the reason, alternatives considered, and seniority order in which employees were contacted, to support union grievance defense.
Union Needs
No decision logging; dispatchers rely on memory and informal notes
Choose an item.
COM-006
Could Have
Provide an in-system message or communication board visible to authorized staff and crew members for operational announcements.
Training
No internal communications capability in Atlas
Choose an item.

10. Reporting and Analytics Atlas can generate reports but they require precise parameter entry and are not easily customizable. Credential compliance reports require CSV export and manual Excel manipulation. Most functional areas maintain supplementary Excel reports because Atlas output is insufficient.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
RPT-001
Must Have
Generate real-time crew list reports by vessel, date range, and bargaining unit, showing posted vs. actual assignments.
All Dispatch, Passenger Services
Atlas crew list lags 2-4 weeks behind reality; actual list comes from vessel spreadsheet
Choose an item.
RPT-002
Must Have
Generate monthly credential compliance reports for all active employees showing: MMC, TWIC, medical certificate, food worker card, alcohol management, TAPS, and HAZMAT status with expiration dates, exportable to Excel. Automatically distribute reports via email to relevant vessel supervisors and to individual employees whose credentials are expiring within the alert threshold.
Vessel Crew Docs
Atlas generates CSV; manual color-coding in Excel required; distribution is fully manual
Choose an item.
RPT-003
Must Have
Support ad-hoc employee search and filter by any combination of: name, EID, bargaining unit, position, change port, vessel, active status, and credential status.
All Functional Areas
Atlas reports require knowing exact parameters; limited flexibility
Choose an item.
RPT-004
Must Have
Generate seniority reports by bargaining unit and position type, updated in real-time, suitable for required posting.
IBU Dispatch
Atlas generates these but slow; must print and annotate manually
Choose an item.
RPT-005
Must Have
Provide training completion reports showing which employees have completed which courses, with dates and expiration, filterable by bargaining unit, vessel, change port, and date range.
Training
Training reports require Marinals lookup; Atlas data lags and is incomplete
Choose an item.
RPT-006
Must Have
Generate vessel manning reports showing current and upcoming crew assignments against COI minimums and pilotage requirements, with gaps highlighted.
MMP Dispatch, MEBA Dispatch
No automated manning gap report; tracked manually on paper scroll
Choose an item.
RPT-007
Could Have
Provide operational dashboards showing key metrics: open vacancies by vessel/union, upcoming credential expirations, training compliance rates, and timesheet receipt status.
Payroll, Training, All Dispatch
No dashboards in Atlas; metrics assembled manually from multiple sources
Choose an item.

11. System Integration The DMS does not operate in isolation. It must exchange data with IRIS (state payroll), Marinals (training LMS), NeoGov (HR/onboarding), and potentially CTM (travel). The IRIS interface is XML/FTP based.

Req ID
Priority
Requirement
Source
Current Gap (Atlas)
Vendor Response
Vendor Narrative/Notes
INT-001
Must Have
Receive employee master data (new hires, status changes, separations) from IRIS via defined sync process (XML/FTP or successor interface) with a maximum 24-hour lag.
IT Standards
Current IRIS-Atlas sync has 2-4 week lag for new hire data
Choose an item.
INT-002
Must Have
Transmit timesheet data to IRIS in a compatible format to reduce manual keystrokes by payroll technicians. Integration design must account for IRIS XML/FTP interface constraints as defined in the DOA Interface Specification document: https://doa.alaska.gov/dof/iris/resource/INT_ISD_TADI_XML.pdf. Any successor interface specification published by DOA shall supersede this reference.
Payroll, IT Standards
No outbound timesheet integration; 100% manual IRIS entry
Choose an item.
INT-003
Must Have
Receive training completion data from Marinals LMS with maximum 24-hour sync frequency to ensure dispatcher qualification checks reflect current status.
Training
Current Marinals-Atlas sync: 2-4 week lag
Choose an item.
INT-004
Must Have
Accept new hire data from NeoGov (or successor onboarding system) via API or file transfer, eliminating manual re-entry by dispatch admin.
Passenger Services
No integration; new hire data manually entered to both Atlas and IRIS
Choose an item.
INT-005
Must Have
Provide a well-documented REST API for state IT use, enabling future integration with other DOT systems, data warehouses, and reporting tools with appropriate authentication and role-based access control.
IT Standards
Atlas has limited documented API; integrations are XML/FTP based
Choose an item.
INT-006
Must Have
Vendor must implement error handling, retry logic, and failure notification for all integration points. Integration failures must generate alerts to designated DOT&PF personnel. No data may be silently lost due to an integration failure.
IT Standards

Choose an item.

INT-007
Must Have
For each data element shared between the DMS and an external system (IRIS, Marinals, NeoGov, CTM), the integration design must define which system is authoritative (system of record) for that element. Conflict resolution rules must be documented for any bidirectional sync.
IT Standards

Choose an item.

INT-008
Must Have
Vendor must support both legacy integration patterns (XML/FTP for IRIS) and modern integration patterns (REST API, webhooks/event notifications) to accommodate future modernization of state enterprise systems.
IT Standards
Only XML/FTP specified; no path for modernization
Choose an item.
INT-009
Must Have
Vendor must provide an integration health monitoring dashboard accessible to DOT&PF IT, showing sync status, last successful sync timestamp, error counts, and data reconciliation metrics for each integration point.
IT Standards

Cho…

This is the start of the file's text. The full file is on GovTribe.