This document is an amendment to the Invitation to Bid (ITB) for the Booster Pump Station Improvements Project (Project 2021-13b) being procured by the City of Ashland, Oregon. The project involves the supply of labor, equipment, and materials to perform work on the City's TAP potable water system, including modifications to existing piping, procurement and installation of new pumps, motors, and generators, as well as structural, electrical, instrumentation, and control work. The amendment provides an updated bid schedule, technical specifications, and drawings, and communicates modifications to the project requirements. Bids are due by October 15, 2024, and the contract must be completed by May 31, 2026.
The contract will be awarded on a lump sum or unit price basis, with 15% retainage withheld until final completion. Payment will be made according to the bid schedule and measurement and payment provisions outlined in the specifications. This procurement is not designated for any specific set-aside or restricted types of organizations, and there is no information provided about any incumbent vendors, current contractors, or existing infrastructure or technology that requires integration. The total award value or budget range for this project is not specified in the available documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1
Section 1: Booster Pump Station Improvement ITB – Project 2021-13b: Updated Bid Schedule and Checklist
Section 2: Exhibit M – Technical Specifications: Updated Divisions 17 and 18
Section 3: Exhibit N – Drawings: Updates
Section 4: Record of Questions Received and Responses Provided
Section 1: Booster Pump Station Improvement ITB – Project 2021-13b: Updated Bid Schedule and Checklist
Purpose
Clarification of intent and better alignment with Division 18, “Measurement and Payment” of Exhibit M.
Instructions
1) Replace the bid schedule found in “Booster Pump Station Improvement ITB – Project 2021-13b” on sequential page 15, numbered page 13, in its entirety with the following bid schedule. Please note that all bids received must be submitted on the new bid schedule. Bids submitted using the outdated bid schedule will be deemed non-responsive.
2) In the “Booster Pump Station Improvement ITB – Project 2021-13b” on sequential page 5, numbered page 3 “Checklist for Bid Submittal”, add a new check item (see Section 2 of this Amendment 1 for additional information) under number 2.
a. “Provide qualifications for alternative integrator, if applicable.”
BID SCHEDULE
Bid Item BPS
Station Description Unit Qty Unit Cost Total
Re gi on al
Mobilization LS 1 $ $
2 Demolition Work LS 1 $ $
Install Pumps, Motors and Ancillary
Equipment
LS 1 $ $
4 Mechanical Work LS 1 $ $ 5 Electrical and Automated Control Work LS 1 $ $ 6 Testing, Start-up and Training LS 1 $ $
Ta le nt
Mobilization LS 1 $ $ 8 Demolition Work LS 1 $ $
Install Pumps, Motors and Ancillary
Equipment
LS 1 $ $
10 Mechanical Work LS 1 $ $ 11 Electrical and Automated Control Work LS 1 $ $ 12 Testing, Start-up and Training LS 1 $ $
As hl an d
Mobilization LS 1 $ $ 14 Demolition Work LS 1 $ $ 15 Mechanical Work LS 1 $ $ 16 Electrical and Automated Control Work LS 1 $ $ 17 Testing, Start-up and Training LS 1 $ $ 18 All As-Builts and O&M Data LS 1 $ 4,000 $ 4,000
BID TOTAL
Name of Authorized Representative Total Written in Dollars
Authorized Representative Signature Date
Section 2: Exhibit M – Technical Specifications: Updated Divisions 17 and 18
Share additional requirements and clarify relationship between Division 18 of the technical specifications and the bid schedule.
Instructions
1) In Division 17, page 17-8, Part 3 – Execution, Alternative Integrators: After item 5 add the following sentence.
“Alternative integrator qualifications shall be submitted with the First Tier Subcontractor Disclosure Form.”
2) Replace Division 18 in its entirety with the following. Note new requirement for schedule of values in regard to bid item 16.
18-1
G:\pub-wrks\eng\2021 Project Year\2021-13 TAP Water System ARPA Improvements\Admin\ITB #2 - Booster Pump Station Improvements\Final Package\Amendment 1\18 Measurement and Payment.docx 10/2/24 11:04 AM © 2024 RH2 Engineering, Inc.
Division 18 Measurement and Payment
18.0 GENERAL
It is the intention of these specifications that performance of work under bid items shall result in complete construction, in proper operating condition, of improvements identified in these written specifications and accompanying Plans. Work and material not specifically listed herein but required according to the Plans and specifications and general practice shall be included in Contractor’s bid price.
Many of the descriptions below refer to multiple bid items. Refer to the bid schedule for numbered bid items.
Bid Item 1, 7, & 13 – Mobilization Lump sum price covers complete cost of furnishing, installing and testing, complete and in-place, all work and materials necessary to: move and organize equipment and personnel onto the job site; secure job site; traffic control for deliveries; provide and maintain necessary support facilities; obtain all necessary permits and licenses; prepare site for construction operations; maintain site and surrounding areas during construction; move all personnel and equipment off site after contract completion, cleanup site prior to final acceptance; and accomplish all other items of work not specifically listed in other Divisions. Payment shall be lump sum according to three separate bid items.
Bid Item 2, 8, & 14 – Demolition Lump sum price shown shall cover the complete cost of all demolition work shown on the Plans and described in these specifications, and shall include but is not limited to, removal and disposal of various structures, equipment, electrical, plumbing, mechanical, and other items indicated to be removed on the Plans; and cleaning, inspecting, and furnishing items removed to the Owner upon their request. Payment shall be lump sum according to three separate bid items.
Bid Item 3 & 9 – Install Pump, Motors, and Ancillary Equipment Lump sum price shown shall cover the complete cost of providing all labor, materials, and equipment necessary to complete pump and motor installation, including, but not limited to:
coordination with Supplier; unloading, storing, securing, maintaining, and installing pumps, motors, and all other items included necessary to install pumps and motors. Payment shall be lump sum according to two separate bid items.
Bid Item 4, 10, & 15 – Mechanical Work Lump sum price shown shall cover the complete cost of providing all labor, materials, and equipment necessary for the mechanical work and any structural retrofit work shown on the Plans, and detailed in the contract specifications, including all mechanical work and equipment not listed in the other bid items, including, but not limited to: suction and discharge piping, valves, pressure gauge assemblies; and all associated supports, appurtenances, parts, coatings, City of Ashland Summer 2024 TAP Booster Pump Station Improvements Division 18
18-2
G:\pub-wrks\eng\2021 Project Year\2021-13 TAP Water System ARPA Improvements\Admin\ITB #2 - Booster Pump Station Improvements\Final Package\Amendment 1\18 Measurement and Payment.docx 10/2/24 11:04 AM © 2024 RH2 Engineering, Inc.
and other components necessary for a complete installation. Payment shall be lump sum according to three separate bid items.
Bid Item 5, 11, & 16 – Electrical and Automatic Control The lump sum price shown shall cover the complete cost of providing all labor, materials, and equipment necessary for the electrical and automatic control work, including pads and enclosures associated with electrical and controls items shown on the Plans and detailed in the contract specifications. Payment shall be lump sum according to three separate bid items.
For Bid Item 16 (Ashland BPS) only, submit a schedule of values within 7 calendar days of contract approval. Bid Item 16 schedule of values shall include at a minimum:
• Generator procurement (lump sum price)
• Generator installation, including concrete pad (lump sum price)
• Generator Electrical conduit and conductor (price per linear foot)
• Generator Instrumentation conduit and conductor (price per linear foot)
• Concrete masonry unit wall (price per linear foot)
• ATS including removal of manual transfer switch and expanding existing concrete pad (lump sum price)
• PRV vault electrical work (lump sum price)
The sum total of the schedule of values for Bid Item 16, shall be equal to the Bid Item 16 amount.
Bid Item 6, 12, & 17 – Testing, Startup, and Training Lump sum price shown shall cover the complete cost of providing all labor, materials, and equipment necessary for testing and startup of the project as shown on the Plans and detailed in the contract specifications. Payment shall be lump sum. Partial payment of up to 50 percent of the total bid item cost is allowed no earlier than first Contractor initiated testing date. Final 50 percent of payment shall not be paid until testing of the station is complete, and the pump station is completely operational, and staff trained as determined by the Owner and Engineer.
Minimum cost for this bid item shall be $10,000 per station.
Bid Item 18 – As-Builts and O&M Data Lump sum price shown shall cover the complete cost of providing all mark-up plans necessary for the Owner to create accurate as-built records as detailed in the specifications, and providing all operation and maintenance data, testing results, and other information necessary for the Owner to prepare the Operation and Maintenance Manual. The work includes surveying all structures and utilities to determine their as-constructed locations and elevations, records of all mechanical and electrical equipment for maintenance purposes, and operation and maintenance manuals. The cost for this work shall be $4,000. Failure to comply with the as-built requirements and furnish acceptable as-built records will result in the deletion of this bid item by change order. Payment for this work will not be made prior to the final payment.
Payment shall be lump sum.
Section 3: Exhibit N – Drawings: Updates
Communicate modifications to drawings.
Instructions
Replace Exhibit N drawings listed below with the following updated drawings (changes marked).
1) Drawing No. E06 is revised with the RV55 cell modem and antenna equipment.
2) Drawing No. E13 is revised with the RV55 cell modem.
3) Drawing No. E14 is revised with antenna equipment.
4) Drawing No. E24 is revised with antenna equipment.
5) Drawing No. E34 is revised with the RV55 cell modem and antenna equipment.
EXISTING 179-L30ER PLC AND MODULES
ETHERNET SWITCH
EXISTING CELL MODEM
EXISTING
VFD P-130
EXISTING
VFD 2 P-140
REGIONAL BOOSTER PUMP STATION
TELEMETRY PANEL
CELL MODEM
OPERATOR INTERFACE
VFD P-120
KE
S
CM
R
Oc t 2
, 2
Oc t 2
, 2
CO
A
-0
TA
PI
-D -P
HX
-E
.D
W G
SHOWN
E06 17 48
DWG NO.:
DA
TE
DE
SC
RI
PT
IO
N
R E
V
IS
IO
N
S
BY
RE
VI
EW
EN
G
IN
EE
R:
SA
VE
D
AT
E:
RE
VI
EW
ED
PL
O T
DA
TE
CL
IE
NT
FI
LE
NA
M
E:
SHEET NO.:
JO
B
NO
NO
SCALE:
R E
G
IO
N A
L B
O O
S
TE
R P
U M
P S
TA
TI
O N
C O
N
TR
O L
P A
N E
L M
O D
IF
IC
A
TI
O N
S
C
IT
Y O
F A
S H
LA
N
D
TA
P B
O O
S
TE
R P
U M
P S
TA
TI
O N
IM
P
R O
V E
M E
N
TS
EXISTING TELEMETRY PANEL, "MCP-1"
NO SCALE
EXISTING TELEMETRY PANEL, "MCP-1" EXTERIOR
NO SCALE
103772PE
OREGON
EXPIRES: 06/30/2026
K E S A N G S H E R P A
RE
GI
STERED PROFESSIONA
LE N G I N E E R
NOV . 11, 2023
EXISTING RADIO TO BE
REMOVED
EXISTING ETHERNET SWITCH TO
BE REPLACED WITH PROPOSED
ALLEN-BRADLEY 1783-CMS20DN
ETHERNET SWITCH IN PROPOSED
LOCATION.
EXISTING OPERATOR
INTERFACE TO BE
REPLACED WITH PROPOSED
ALLEN-BRADLEY
2711P-T10C22D9P
OPERATOR INTERFACE.
INSTALL PROPOSED 1783-CMS20DN
ETHERNET SWITCH ON BACKPANEL.
INSTALL PROPOSED AIRLINK
RV55 CELL MODEM PART
NUMBER 1104303. CONNECT
TO EXISTING AC UPS.
COMMUNICATIONS DIAGRAM
NO SCALE
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
EXISTING AC UPS
NOTES:
1. INSTALL EATON OPTCQ ETHERNET/IP COMMUNICATION
OPTION CARD IN EXISTING VFD.
INSTALL PROPOSED 4A,
24VDC CIRCUIT BREAKER
FOR POWERING PROPOSED
ETHERNET SWITCH.
CONNECT CIRCUIT BREAKER
TO EXISTING 24VDC POWER
SUPPLY.
INSTALL PROPOSED 3A,
24VDC CIRCUIT BREAKER
FOR POWERING PROPOSED
OPERATOR INTERFACE.
CONNECT CIRCUIT BREAKER
TO EXISTING 24VDC POWER
SUPPLY.
EXISTING 24VDC POWER
SUPPLY.
/4/
RE
VI
SE
D
PE
R
AD
DE
ND
UM
N O.
KE
S
CM
R
GW400-60-NM-SM
COAXIAL CABLES
PANORAMA
ANTENNAS
LPB-6-60
ANTENNAS
INSTALL (2) PROPOSED PANORAMA
ANTENNAS LPB-6-60 ANTENNAS ON TOP
OF TELEMETRY PANEL. INSTALL
PROPOSED GW400-60-NM-SM COAXIAL
CABLES BETWEEN PROPOSED CELL
MODEM AND ANTENNAS.
KE
S
CM
R
Oc t 2
, 2
Oc t 2
, 2
CO
A
-0
TA
PI
-D -T
AL
-E
.D
W G
SHOWN
E13 24 48
DWG NO.:
DA
TE
DE
SC
RI
PT
IO
N
R E
V
IS
IO
N
S
BY
RE
VI
EW
EN
G
IN
EE
R:
SA
VE
D
AT
E:
RE
VI
EW
ED
PL
O T
DA
TE
CL
IE
NT
FI
LE
NA
M
E:
SHEET NO.:
JO
B
NO
NO
SCALE:
TA
LE
N T
B O
O S
TE
R
P U
M P
S
TA
TI
O
N R
TU
B
IL
L
O F
M A
TE
R
IA
LS
NOTE:
ITEM TO BE INSTALLED IN THE FIELD.*
C
IT
Y O
F A
S H
LA
N
D
TA
P B
O O
S
TE
R P
U M
P S
TA
TI
O N
IM
P
R O
V E
M E
N
TS
103772PE
OREGON
EXPIRES: 06/30/2026
K E S A N G S H E R P A
RE
GI
STERED PRO)ESSIONA
LE N G I N E E R
NOV . 11, 2023
/4/
RE
VI
SE
D
PE
R
AD
DE
ND
UM
N O.
KE
S
CM
R
KE
S
CM
R
Oc t 2
, 2
Oc t 2
, 2
CO
A
-0
TA
PI
-D -T
AL
-E
.D
W G
SHOWN
E14 25 48
DWG NO.:
DA
TE
DE
SC
RI
PT
IO
N
R E
V
IS
IO
N
S
BY
RE
VI
EW
EN
G
IN
EE
R:
SA
VE
D
AT
E:
RE
VI
EW
ED
PL
O T
DA
TE
CL
IE
NT
FI
LE
NA
M
E:
SHEET NO.:
JO
B
NO
NO
SCALE:
TA
LE
N T
B O
O S
TE
R
P U
M P
S
TA
TI
O
N R
TU
E
N C
LO
S
U R
E L
A Y
O U
T
NOTES:
1. DIMENSIONS ARE IN INCHES.
2. SEE BILL OF MATERIALS ON DWG NO. E13 FOR ITEM
INFORMATION.
C
IT
Y O
F A
S H
LA
N
D
TA
P B
O O
S
TE
R P
U M
P S
TA
TI
O N
IM
P
R O
V E
M E
N
TS
ENCLOSURE EXTERIOR LAYOUT ENCLOSURE SIDE LAYOUT
A
A
DC UPS BATTERY
OUTLINE
DC UPS BATTERY
OUTLINE
TALENT BOOSTER
PUMP STATION
TELEMETRY PANEL
11.00
3.00
CL
CL
CL
HOA SWITCH
HAND OFF AUTO
RUNNING LIGHT
FAIL LIGHT
POTENTIOMETER
MASTER ALARM
LIGHT
ALARM RESET
PUSHBUTTON
FLOW RATE
103772PE
OREGON
EXPIRES: 06/30/2026
K E S A N G S H E R P A
RE
GI
STERED PROFESSIONA
LE N G I N E E R
NOV . 11, 2023
VFD DISABLE
PUSHBUTTON
CL
3.00
CL
CL
3.00
3.00
3.00
PUMP 3
48.00
12.00
36.00
RUNNING LIGHT
FAIL LIGHT
POTENTIOMETER
VFD DISABLE
PUSHBUTTON
PUMP 2
RUNNING LIGHT
FAIL LIGHT
POTENTIOMETER
PUMP 1
FCV SWITCH
CLOSE AUTO OPEN
HOA SWITCH
HAND OFF AUTO
HOA SWITCH
HAND OFF AUTO
4.00
8.00
3.00 7.007.00
7.00
VFD DISABLE
PUSHBUTTON
CL
/4/
RE
VI
SE
D
PE
R
AD
DE
ND
UM
N O.
KE
S
CM
R
INSTALL ANTENNAS ON TELEMETRY PANEL AND
INSTALL PROPOSED ANTENNA CABLES
BETWEEN PROPOSED CELL MODEM AND
ANTENNAS IN THE FIELD.
COMBINATION ETHERNET
PORT/RECEPTACLE
5069-L310ER PLC AND MODULES
ETHERNET SWITCH
EXISTING CELL MODEM
EXISTING VFD 1 EXISTING VFD 2 VFD 3
TALENT BOOSTER PUMP STATION
TELEMETRY PANEL
CELL MODEM
KE
S
CM
R
Oc t 2
, 2
Oc t 2
, 2
CO
A
-0
TA
PI
-D -T
AL
-E
.D
W G
SHOWN
E24 35 48
DWG NO.:
DA
TE
DE
SC
RI
PT
IO
N
R E
V
IS
IO
N
S
BY
RE
VI
EW
EN
G
IN
EE
R:
SA
VE
D
AT
E:
RE
VI
EW
ED
PL
O T
DA
TE
CL
IE
NT
FI
LE
NA
M
E:
SHEET NO.:
JO
B
NO
NO
SCALE:
TA
LE
N T
B O
O S
TE
R
P U
M P
S
TA
TI
O
N R
TU
C
O M
M U
N
IC
A
TI
O N
S D
IA
G
R A
M
C
IT
Y O
F A
S H
LA
N
D
TA
P B
O O
S
TE
R P
U M
P S
TA
TI
O N
IM
P
R O
V E
M E
N
TS
103772PE
OREGON
EXPIRES: 06/30/2026
K E S A N G S H E R P A
RE
GI
STERED PRO)ESSIONA
LE N G I N E E R
NOV . 11, 2023
CAT5E ETHERNET
CABLE
5069-L310ER
5069-IB16 5069-OW16 5069-IF8
CompactLogix 5380
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
CAT5E ETHERNET
CABLE
5069-IB16 5069-OF4
CAT5E ETHERNET
CABLE
/4/
RE
VI
SE
D
PE
R
AD
DE
ND
UM
N O.
KE
S
CM
R
COAXIAL CABLES
ANTENNAS
EXISTING COAXIAL
CABLE
EXISTING ANTENNA
TB-43
TB-44
TB-45
TB-36TB-35
TB-37
TB-38
TB-39
TB-31 TB-321611 1612 0612
TB-41
TB-40
TB-42
0701 1710
17120711
17180717TB-49 TB-500404
0404 TB-55 TB-5617200719 0704
KE
S
CM
R
Oc t 2
, 2
Oc t 2
, 2
CO
A
-0
TA
PI
-D -A
SH
-E
.D
W G
SHOWN
E34 45 48
DWG NO.:
DA
TE
DE
SC
RI
PT
IO
N
R E
V
IS
IO
N
S
BY
RE
VI
EW
EN
G
IN
EE
R:
SA
VE
D
AT
E:
RE
VI
EW
ED
PL
O T
DA
TE
CL
IE
NT
FI
LE
NA
M
E:
SHEET NO.:
JO
B
NO
NO
SCALE:
A S
H
LA
N D
B O
O S
TE
R
P U
M P
S
TA
TI
O
N C
O N
TR
O
L P
A N
E L
M O
D
IF
IC
A
TI
O
N S
C
IT
Y O
F A
S H
LA
N
D
TA
P B
O O
S
TE
R P
U M
P S
TA
TI
O N
IM
P
R O
V E
M E
N
TS
103772PE
OREGON
EXPIRES: 06/30/2026
K E S A N G S H E R P A
RE
GI
STERED PROFESSIONA
LE N G I N E E R
NOV . 11, 2023
DISCRETE INPUTS-EXISTING SLOT 3
DISCRETE INPUTS-EXISTING SLOT 2
EXISTING TELEMETRY PANEL, "RTU"
1769-IQ16
COMPACTLOGIX
MODULE 3
24VDC 16-PT SINKING INPUT
INSTALL PROPOSED FUSED
TERMINAL BLOCK ON SIDE
OF ENCLOSURE.
CONNECT PROPOSED FLOW
METER TRANSMITTER TO
EXISTING SPARE CIRCUIT
BREAKER B12.
CONNECT PROPOSED
GENERATOR AND ATS SIGNALS
TO EXISTING TERMINAL BLOCKS
TB-35 TO TB 45. REWIRE AS
NECESSARY.
EXISTING EQUIPMENT OR CONNECTION.
PROPOSED EQUIPMENT OR CONNECTION.
LEGEND
CONNECT FLOW METER
TRANSMITTER ETHERNET
CABLE TO EXISTING
ETHERNET SWITCH.
DISCRETE INPUTS-EXISTING SLOT 1
1769-IQ16
COMPACTLOGIX
MODULE 1
24VDC 16-PT SINKING INPUT 1769-IQ16
COMPACTLOGIX
MODULE 2
24VDC 16-PT SINKING INPUT
INSTALL PROPOSED
AIRLINK RX55 MODEM ON
SIDE OF ENCLOSURE.
INSTALL PROPOSED 0.5A,
24VDC CIRCUIT BREAKER
FOR AIRLINK RV55 CELL
MODEM PART NUMBER
1104303.
INSTALL PROPOSED 5A,
120VAC CIRCUIT BREAKER
FOR VALVE SOLENOIDS.
MOVE EQUIPMENT TO THE
RIGHT TO MAKE ROOM FOR
PROPOSED 120VAC CIRCUIT
BREAKER. EXTEND DIN RAIL
AS NEEDED.
/4/
RE
VI
SE
D
PE
R
AD
DE
ND
UM
N O.
KE
S
CM
R
INSTALL (2) PROPOSED PANORAMA
ANTENNAS LPB-6-60 ANTENNAS ON
TOP OF TELEMETRY PANEL. INSTALL
PROPOSED GW400-60-NM-SM
COAXIAL CABLES BETWEEN
PROPOSED CELL MODEM AND
ANTENNAS.
Section 4: Record of Questions Received and Responses Provided
Open communication to all potential bidders on questions received.
Instructions
Provided for information.
Bidder Questions and Responses
The following list represents questions from prospective bidders and the Engineer’s responses. Questions from prospective bidders are shown in black and responses from the engineer are shown in blue.
Q1: Does this project require AIS materials as shown in the ARPA / SLFRF Required Contract Clauses?
A1: Response from the grant administrator:
“…the project is not subject to American Iron and Steel (AIS). Moreover, the ARPA clause provides the extent of what we know regarding the requirements relative to the source of the purchase, acquisition, and use of goods, materials, etc. The clause states “the contractor should, to the greatest extent practicable” provide a preference for American goods, so while the certifications required under AIS are not required by ARPA, contractors could document their efforts in pursuit of such a preference.”
Q2: Could you supply a specification for the 4” & 6” FLG Wye Strainer? (06-M03, #15) (09-M06, #7)
A2: Please refer to Section 15.40.03 of the Technical Specifications (page 108 of the pdf).
Q3: Could you supply a specification for the 1-1/2” Brass Ball Valve? (09-M06, #29)
A3: Please refer to Section 15.75.16 of the Technical Specifications (page 120 of the pdf).
Q4: Do the “RJ” fittings require the TNEMEC N140 Coating or is the Standard Asphaltic Coating okay? (09-M06)
A4: Coatings are required per Division 9 of the Technical Specifications (starts on page 60 of the pdf). In this case, fitting should be coated per Coating System 1.
Q5 Will answers to the questions be replied to the sender before the 10/04 deadline then later in an addendum?
A5: A list of questions asked and answered will be supplied.
Q6: Would TNEMEC Series N140 Pota-Pox or TNEMEC Series 90-98 be suitable as an alternate to Coating System 1 per Division 9 of the Specifications for coating pipe and fitting exteriors.
A6: Yes, either of those are acceptable alternative coatings systems.
Q7: Bid Item 1, 7 & 13 (Scope 1) – Mobilization refers to multiple bid items, however it is unclear which bid items this refers to.
A7: The bid schedule issued with Addendum 1 was updated to show bid items, and Division 18 was updated to clarify this.
Q8: Will the submittal of qualifications for approval of the proposed integrator take place AFTER the bid opening?
A8: Please see Section 2 of this Amendment 1. Alternative integrator qualifications shall be submitted with the First Tier Subcontractor Disclosure Form.