Amendment_1.pdf

PDF 234 KB Posted

Attached to
Cove Lake S. P. Restaurant Repairs - UPDATED
Solicitation number
Event 32701-14015
Issued by
Carter County, Tennessee

About this file

This is an addendum to a request for bids issued by the Tennessee Department of Environment and Conservation for restaurant repairs at Cove Lake State Park located at 110 Cove Lake Lane, Caryville, Tennessee 37714. The project encompasses furnishing all material, equipment, supplies, and labor necessary to paint, replace gates, gutters, awning, decking, and repair concrete at the facility. Specific work includes demolition of existing fencing, gates, gable vents, concrete, doors, gutters, awnings, gazebos, decking, fireplace, and lanterns; installation of new corrugated metal fencing and gates, gable vents, concrete in damaged areas, tempered glass storefront doors, six-inch K-style gutters with gutter guards and downspouts, metal awnings, wheelchair-accessible concrete patios with livestock panel handrails, and post-mount light fixtures; re-installation and reconnection of gazebos; stucco repair; pressure washing; and two-coat exterior painting using specified colors "Park Brown" for main structure and stone walls, and "Touch of Sand" for trim, fascia, shutters, and gable vents. On-site work must be completed between receipt of the signed contract and 90 days unless a written exception is granted by the Facilities Management Regional Manager. A non-mandatory pre-bid meeting is being held, and bids are due September 30, 2026 at 2:00 p.m. CDT, with a pre-bid meeting scheduled for September 23, 2026 at 10:00 a.m. EST at the restaurant facility.

Contractors and applicable subcontractors must possess an active BC-B(sm), BC-B, or BC-C Tennessee Building Contractor license prior to bid submission, with failure to provide copies resulting in bid disqualification. Material substitutions require pre-approval, with specified approved brands including General Awnings Austin Standing Seam in Sierra Tan for awnings and Pia Ricco Textured Black Outdoor Post Lanterns for exterior finish. The contractor must obtain all permits and associated fees, provide a one-year minimum workmanship warranty, and comply with State-approved International Building Code versions and manufacturer specifications. Work shall be performed Monday through Friday, 8:00 a.m. to 4:30 p.m., and bids are structured in two line items for labor and materials/equipment. Before contract execution, the successful contractor must register with the Tennessee Department of Revenue for sales and use tax collection and provide proof of registration. Invoices are due within ten days of project completion and acceptance. The State of Tennessee must be listed as an additional insured with waiver of subrogation on the Certificate of Insurance, with minimum coverage requirements including one million dollars in Commercial General Liability per occurrence, Workers Compensation and Employers Liability insurance, and one million dollars in Automobile Liability Insurance per occurrence. Regional Manager Chad Young (865-606-1551, chad.young@tn.gov) and Project Manager Chris Mayeaux (865-340-3287, chris.mayeaux@tn.gov) are available for project inquiries.

View the file

Other files

File Type Posted
Restaurant_Repairs_-_Addendum.pdf PDF
Terms_Conditions.pdf PDF
Restaurant_Repairs_Specifications.pdf PDF
Cove_Lake_S.P._Restaurant_Repairs.pdf PDF
PreBid_Memo.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Restaurant Repairs

Cove Lake State Park 110 Cove Lake Lane

Caryville, Tennessee 37714

**ADDENDUM HIGHLIGHTED IN YELLOW**

This request for bids is for a Contract to furnish all material, equipment, supplies, and labor necessary to paint, replace gates, gutters, awning, decking and repair concrete.

General Conditions

1) On-Site work shall be performed between receipt of signed Contract or Purchase Order and 90 days unless a written exception is granted by the Facilities Management

Regional Manager.

2) For this project, the Contractor and applicable subcontractors shall possess an active

BC-B sm, BC-B, or BC-C Tennessee Building Contractor license prior to submitting a bid.

Failure of the Contractor and applicable subcontractors to provide copies of their appropriate license shall result in the disqualification of the bid. All licenses shall be verified via Tennessee Commerce and Insurance database before project award.

3) The Contractor shall not assign this Contract or enter into a subcontract for this project without prior written approval of Facilities Management. The Contractor’s bid shall include a Declaration of Intended Use of Subcontractor(s) form that clearly states the intent to use a subcontractor, along with their name and license number. Facilities

Management reserves the right to reject a bid in whole or a subcontractor, based upon failure to possess an appropriate active TN builder’s license. After project award, any proposed substitution or addition of a subcontractor shall require written Facilities

Management acceptance and approval before being allowed on-site or perform any work under this Contract. All subcontractors are required to have an active TN Building

Contractor license for the applicable work to be performed before and throughout the project. Any proposed subcontractor failing to meet these requirements is not allowed to perform work on any portion of this project.

4) All work shall comply with State-approved versions of the IBC, standards, regulations, other applicable codes, manufacturer’s recommendation, and best practices. The

Contractor is responsible for all permits and associated fees.

5) We are requesting a non-mandatory pre-bid meeting to be held.

6) Only the Facilities Management Project Manager or Facilities Management Regional

Manager can approve any alterations, modifications, and substitutions of the specifications or requirements of the project. No additional work shall be authorized unless pre-approved by either the Project Manager or Regional Manager in writing.

Park/Hospitality management and staff are not authorized to make any changes, deletions, or additions to the project or accept any portion of the work. This Contract shall be modified only by a written agreement signed by all parties. Any work performed outside of the written scope with any written change orders will be the responsibility of the Contractor or others and not Facilities Management. All questions, directives, and acceptance shall come only from either the Facilities Management

Regional Manager and/or Project Manager.

7) The Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner.

8) All color selections shall be provided to the Contractor by the Facilities Management

Project Manager.

9) All material substitutions must be pre-approved prior to bid acceptance.

10) All materials shall be installed per manufacturers’ recommendation, industry best practice, and applicable code.

11) All dimensions listed are approximate. The Contractor is solely responsible for verifying actual dimensions prior to ordering any materials or bidding. No allowances shall be made due to a bidder neglecting to visit the site and verifying dimensions and conditions.

12) All work performance under this Contract shall be under the full-time direction of the

Contractor. The Contractor shall be responsible for work and performance, and damages of any subcontractors and/or independent contractors or laborers hired in connection with the work under this Contract.

General Scope of Work

Description of Demolition or Associated Work All debris shall be removed from the Park property and disposed of in accordance with all applicable regulations, unless specifically noted.

1) The Contractor shall remove fencing and gate on wall to the left of the entrance.

2) The Contractor shall remove the rotten gable vent to the left side of the entrance.

3) The Contractor shall remove the damaged concrete areas near the left side gate and walkway to deck.

4) The Contractor shall remove the front entry door and two side doors.

5) The Contractor shall remove gutters and downspouts on structure.

6) The Contractor shall remove the awning from the side and rear of structure.

7) The Contractor shall remove the gazebos on the deck after disconnecting the electrical. The gazebos shall be retained for re-installation.

8) The Contractor shall remove all decking materials.

9) The Contractor shall remove the fireplace on the rear of the deck.

10) The Contractor shall remove the remnants of the lanterns on the entry columns.

New Work

1) The Contractor shall provide and install a new fence and gate on top of the existing wall to match the current functionality. The new parts shall be built from 5 rib corrugated metal and fully enclosed metal stud work.

2) The Contractor shall provide and install a new gable vent.

3) The Contractor shall pour new concrete in damaged areas.

4) The Contractor shall provide and install new tempered glass storefront doors on the front entry doors and side doors near deck. New locksets, door closures and hinges shall be installed to match the existing. Old lock cylinders shall be transferred to new locks.

5) The Contractor shall provide and install new 6” (six inch) K-style gutters, gutter guards, and downspouts. The downspouts on the rear of the building shall be piped into corrugated pipe and be directed down the hillside. The end of the pipe shall have a screen to prevent clogging from rodents. One-to-two-inch (1-

2") stones shall be placed at the end of the pipes to prevent erosion.

6) The Contractor shall provide and install a new metal awning on the sides and rear of the structure.

7) The Contractor shall form and pour a concrete patio, squared off with the rear of the structure and the right side of the existing deck at a single level to make it wheelchair accessible. The stone look from the rear of the building shall be carried onto the rear and sides of the new concrete structure.

8) The Contractor shall provide and install a livestock panel handrail around the edge of the new concrete patio. The top rail shall be a treated 2x6 and the upper and lower rails shall be treated 2x4s. Livestock panel shall be stapled to one side of the 2x4s and sandwiched between the others. The posts shall be

6x6 (six by six) and installed on brackets.

9) The Contractor shall re-install the gazebos and re-connect the power to them.

An extension box shall be added to the existing outside receptacle and a new ½” or ¾” conduit shall be ran to the gazebos.

10) The Contractor shall repair the stucco damage near the front door and the rear windows.

11) The Contractor shall pressure wash the structure, wall in parking lot, and walkways.

12) The Contractor shall re-caulk the deck windows and paint them with two coats of “Touch of Sand” paint.

13) The Contractor shall paint the main structure and both sides of the stone wall in the parking lot with two coats of “Park Brown” paint. The trim, fascia, shutters and gable vent shall be painted with two coats of “Touch of Sand” paint.

14) The Contractor shall provide and install new two-inch post mount light fixtures.

Approved Brands and Specifics (or Pre-approved Equal) Item Approved Brand or

Pre-Approved

Equal

Specific Requirements

Awnings General Awnings Austin Standing Seam with a 35”x 33” (Drop x

Projection) in “Sierra Tan” Color

Exterior Finish Sherwin Williams, PPG

Exterior Acrylic Latex with Lifetime Limited

Warranty

Post Lanterns Pia Ricco Textured Black Outdoor Post Lantern w/Clear

Glass

Additional Terms and Conditions

1) All aspects of this job shall be left in a finished condition: All finish work, interior and exterior walls and trim, finish painting, caulking and final cleanup are included in this Contract.

2) The Contractor shall be responsible for determining where all utilities are on the job site and care should be taken to protect the utilities from any damage caused by the demolition/construction. This shall include any underground utilities around the job site area. If damage occurs, it shall be repaired within a twenty-four (24) -hour period from the time damage occurs.

3) The Contractor shall perform work on regular time and shall invoice work time and material not to exceed the quoted price. Any variance in quote shall be addressed only with a representative of the Facilities Management Regional

Office before any additional work is undertaken or materials ordered.

4) Work shall be scheduled to avoid any interference with normal operation of the

Park as much as possible. During the construction period, coordinate construction schedules and operations with the Park Manager. Work shall be conducted during the normal business hours of Monday through Friday, 8:00 a.m. to 4:30 p.m., unless an alternate schedule is approved by

Facilities Management.

5) The successful Contractor shall schedule and attend a pre-construction conference where a pre-construction form shall be signed by Facilities

Management, Contractor and Park Manager or Park representative before work can begin. The Contractor shall also schedule and attend a final inspection where a final inspection form shall be signed by Facilities Management, Contractor and Park Manager or Park representative before final invoice shall be paid.

6) The Contractor shall protect areas adjacent to his work and shall be required to repair any damage they may cause. The Contractor shall protect work of other trades. The Contractor shall correct any painting related damage by cleaning, repairing, or replacing, and refinishing as directed by Facilities Management. The

Contractor shall leave residences and other buildings in a habitable manner after hours by securing unfinished openings.

7) Workmanship shall be warrantied for not less than one (1) year from date of final inspection. Materials shall be warrantied as per manufacturer’s warranty.

8) Unless otherwise indicated, all materials, equipment, and supplies shall be new and in good condition, UL listed when applicable, and all work accomplished in a manner acceptable to Facilities Management.

9) Clean up of the project site shall be the responsibility of the Contractor. The

Contractor shall assure that job site is clean of nails, debris, etc., at end of each day to ensure safety. The Contractor shall clean up and haul away all scrap when work is completed to an approved location off state property.

10) At all times, the Contractor shall have a copy of project specifications, permits, and Certificate of Insurance on-site.

11) The Contractors and all subcontractors are not authorized to day laborers or temporary labor on this project without the express written permission of

Facilities Management.

12) Note: Before the Contract resulting from this Invitation to Bid is signed, the apparent successful proposer shall be registered with the Department of

Revenue for the collection of Tennessee sales and use tax. The State shall not approve a Contract unless the proposer provides proof of such registration. The foregoing is a mandatory requirement of an award of a Contract pursuant to this solicitation.

13) Invoice shall be submitted for payment not before project completion and final project acceptance but also no later than ten (10) days after project completion and acceptance. A copy of the invoice shall be submitted to: Deborah Quist, 160

State Circle, Rocky Top, TN 37769, 865-606-0785, deborah.g.smith@tn.gov.

14) Facilities Management Regional Contacts for this project are:

Regional Manager: Chad Young, 865-606-1551, chad.young@tn.gov

Project Manager: Chris Mayeaux, 865-340-3287, chris.mayeaux@tn.gov mailto:deborah.g.smith@tn.gov mailto:chad.young@tn.gov mailto:chris.mayeaux@tn.gov

Project Bid Sheet and Packet Checklist

Vendor Name: ___________________________ TN License________________________________

Supplier ID: ________________________ Sales and Use Tax (or exempt): _____________

If awarded this project, Certificates of Insurance of General Liability, Automobile and Workers Comp-or exempt shall be submitted within 5 business days (if this isn’t met, our Nashville Procurement will cancel the PO). In addition, a Sales and Use Tax or exempt must be submitted or be on file (please enter the number above or enter exempt, if applicable).

Project:

Line

No.

Commodity/ Service

Description

Quantity Unit Unit

Price

Amount

0001 Labor

0002 Material and/or Equipment

GRAND

TOTAL

To be completed by vendor (please initial each):

1. _____ No quote at this time.

2. _____ Delivery will be made this number of days after receipt of purchase order: ______.

3. _____ Quote expires _______________.

4. _____ I have attached a signed Declaration of Intended Use of Subcontractor(s).

5. _____ I (we) agree to strictly abide by all statutes and terms contained in the policies and procedures of the Department of Environment and Conservation, Procurement Section.

Important: By signing below, the supplier certifies compliance with the above and further certifies that this quote is made without collusion or fraud. This quote must be manually signed in ink, below. All quote information shall be made with ink or typed.

Vendor Phone Number: ______________________ Date: ________________________

Vendor E-mail Address: ________________________________________________________________

Vendor Representative Title: ______________________________Signature: _____________________________

All unit price corrections have been initialed: __________________________

Declaration of Intended Use of Subcontractor(s)

(To be Completed by Prime Contractor and submitted with bid)

Project Name:

License Requirement of Project: BC-B sm, BC-B, or BC-C

Prime Contractor Name:

Prime Contractor License Type: Number:

Please Initial the appropriate box

I do not intend to use a subcontractor(s) on this project.

I intend to use the following subcontractor(s) on this project. All subcontractors working in a licensed trade are required to possess a valid contractor license for work planned/ performed, as long as their portion of work is $25,000 or more.

Subcontractor Name Trade License Type License #

By signing, I understand that any additions or changes regarding the use or substitution of subcontractor(s) requires written pre-approval of Facilities Management Office prior to subcontractor performing work under this project. Their contractor license information is required and shall be verified prior to approval. The use of day laborers/ temporary help is not authorized on this project.

Contractor Signature: Date:

Certificate of Insurance Requirements

Below is the list of requirements mandated by the State in order to conduct business on state property.

1. A Certificate of Insurance (COI) must list each insurer’s National Association of Insurance

Commissioners (NAIC) number and be signed by an authorized representative of the insurer. a.

The following information must also be included:

i. Policy Number

ii. Policy effective date

iii. Policy expiration date

2. When (COI) forms are received by our office, and they contain General Liability (GL) coverage-

The State of Tennessee must be listed as Additionally Insured and contain an endorsement for a waiver of subrogation in favor of the State in one of two ways: a. The Additional Insured

(ADDL INSR) column & Subrogation Waived (SUBR WVD) column for Commercial General Liability needs to be marked with “X” / “Y”

OR

b. On the form under the label: Description of Operations/Location, it must read:

i. The State of Tennessee is Additional Insured with respect to General Liability per Contract. A waiver of subrogation is granted to the Additional Insured under the General Liability policy where required by written Contract.

3. Automobile Liability Insurance must be a component of all Contracts/Purchase Orders which involves a Contractor’s physical presence on State property.

a. The Contractor shall maintain Automobile Liability Insurance which shall cover liability arising out of any automobile (including owned, leased, hired, and non-owned automobiles).

i. The following information must also be included:

1. Policy Number

2. Policy effective date

3. Policy expiration date

4. Workers Compensation & Employers Liability Insurance section is for Contractors statutorily required to carry workers’ compensation and employer liability insurance; the Contractor shall maintain:

Certificate of Insurance Requirements

a. Workers’ compensation in an amount not less than one million dollars ($1,000,000) including employer liability of one million dollars ($1,000,000) per accident for bodily injury by accident,

b. one million dollars ($1,000,000) policy limit by disease,

c. and one million dollars ($1,000,000) per employee for bodily injury by disease.

d. The following information must also be included:

i. Policy Number

ii. Policy effective date

iii. Policy expiration date

e. If the Contractor certifies that it is exempt from the requirements of Tenn. Code Ann. §§ 50-6-101

– 103, then the Contractor shall furnish written proof on company letterhead of such exemption for one or more of the following reasons:

i. The Contractor employs fewer than five (5) employees

ii. The Contractor is a sole proprietor/ Individual

iii. The Contractor is in the construction business or trades with no employees

iv. The Contractor is in the coal mining industry with no employees

v. The Contractor is a state or local government; or

vi. The Contractor self-insures its workers’ compensation and is in compliance with the TDCI rules and Tenn. Code Ann. § 50-6-405.

5. The box labeled Certificate Holder must contain this information:

State of Tennessee, CPO Risk Manager

312 Rosa L. Parks Ave., 3rd Floor

Central Procurement Office

Nashville, TN 37243

If the form is not completed correctly, your insurance coverage is insufficient, you are in violation of the Contract/Purchase Order, and you will be unable to continue working for the State of TN.

This information must be applied to the form by the insurance carrier.

You may NOT enter this information on the form yourself.

We appreciate your adherence to the Contract/Purchase Order insurance policies. We are happy to assist you in anyway if you have questions or need clarification. We appreciate doing business with your company.

Please see below for all insurance minimum coverage requirements and policy limits.

Certificate of Insurance Requirements

Insurance Certificate Requirements/Limits Required

Commercial General Liability

Commercial General Liability Insurance, including but not limited to, bodily injury, property damage, contractual liability, products liability, with combined single limits of not less than one million dollars ($1,000,000) per occurrence with a minimum aggregate of two million dollars

($2,000,000).

Workers Compensation & Employers Liability Insurance

The Contractor is required to provide Workers Compensation Insurance coverage to its employees in compliance with State law and Employer’s Liability with the following limits:

Workers’ Compensation in an amount not less than one million dollars ($1,000,000), including employer liability of one million dollars ($1,000,000), one million dollars ($1,000,000) per accident for bodily injury by accident, one million dollars ($1,000,000) policy limit by disease, and one million dollars ($1,000,000) per employee for bodily injury by disease.

Auto Liability Insurance

a. The Contractor shall maintain Automobile Liability Insurance which shall cover liability arising out of any automobile (including owned, leased, hired, and non-owned automobiles).

b. The Contractor shall maintain bodily injury/property damage with a limit not less than one million dollars ($1,000,000) per occurrence or combined single limit.

Nothing Follows