| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT A - CLIN 9000 |
| Line Item XXXX - | : 0001 | - Recurring Work - Base Period | | | | | | | |
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | | | | | | | | | |
| ELIN/Sub-ELINs | | A001 to A009 | | | | | | | |
| ELIN /Sub ELIN | | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio |
| A001 | | | | CNIC | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| A001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| A001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| A001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| A001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| A001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| A001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| A001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | CNIC Total | ¥ | |
| A002 | | | | SRF | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| A002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| | 1604000 | | Wastewater | | | | | |
| A002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| | | | Preventive Maintenance | | | | | |
| A002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| A002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| A002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | SRF Total | ¥ | |
| A003 | | | | DLA | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| A003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| A003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | DLA Total | ¥ | |
| A004 | | | | Housing | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| A004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Housing Total | ¥ | |
| A005 | | | | DODDS | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| A005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| A005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| A005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| | | | Preventive Maintenance (PM) | | | | | |
| A005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| | | | | | | DODDS Total | ¥ | |
| A006 | | | | USNH | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| A006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | 1604000 | | Wastewater | | | | | |
| A006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| | | | Preventive Maintenance (PM) | | | | | |
| A006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| | | | | | | USNH Total | ¥ | |
| A007 | | | | DECA Yokosuka | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| A007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | | | | | | DECA Yokosuka Total | ¥ | |
| A008 | | | | NAVFAC UT | | | | | |
| | 1604000 | | Wastewater | | | | | |
| A008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| | | | | | | NAVFAC UT Total | ¥ | |
| A009 | | | | Navy Lodge | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| A009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Navy Lodge Total | ¥ | |
| Total Recurring Work: | ¥ |
| Note 1: Emergency = E, Urgent = U, Routine =R | | |
&"Times New Roman,Regular"CUI
&"Times New Roman,Regular"
CUI
BN
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT A - CLIN 9000 |
| Line Item | : 0002 Non-Recurring Price - Base Period | | | | | | |
| Provide Prices For Facility Investment Services | | | | | | | |
| ELINs A700 | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 800,000,000 | ¥ 800,000,000 | |
| | TOTAL NON-RECUURRING PRICE | | | | ¥ 800,000,000 | |
| Kg = | Kilogramme | | | | | | |
| LS = | Lump Sum | | | MO = Month | | | |
| EA = | Each | | | | | | |
CUI
1R
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT B - CLIN 9001 |
| Line Item XXXX - | : 0003 | - Recurring Work - First Option Period | | | | | | | |
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | | | | | | | | | |
| ELIN/Sub-ELINs | | B001 to B009 | | | | | | | |
| ELIN /Sub ELIN | | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio |
| B001 | | | | CNIC | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| B001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| B001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| B001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| B001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| B001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| B001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| B001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | CNIC Total | ¥ | |
| B002 | | | | SRF | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| B002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| | 1604000 | | Wastewater | | | | | |
| B002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| | | | Preventive Maintenance | | | | | |
| B002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| B002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| B002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | SRF Total | ¥ | |
| B003 | | | | DLA | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| B003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| B003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | DLA Total | ¥ | |
| B004 | | | | Housing | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| B004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Housing Total | ¥ | |
| B005 | | | | DODDS | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| B005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| B005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| B005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| | | | Preventive Maintenance (PM) | | | | | |
| B005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| | | | | | | DODDS Total | ¥ | |
| B006 | | | | USNH | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| B006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | 1604000 | | Wastewater | | | | | |
| B006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| | | | Preventive Maintenance (PM) | | | | | |
| B006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| | | | | | | USNH Total | ¥ | |
| B007 | | | | DECA Yokosuka | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| B007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | | | | | | DECA Yokosuka Total | ¥ | |
| B008 | | | | NAVFAC UT | | | | | |
| | 1604000 | | Wastewater | | | | | |
| B008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| | | | | | | NAVFAC UT Total | ¥ | |
| B009 | | | | Navy Lodge | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| B009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Navy Lodge Total | ¥ | |
| Total Recurring Work: | ¥ |
| Note 1: Emergency = E, Urgent = U, Routine =R | | |
CUI
1N
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT B - CLIN 9001 |
| Line Item | : 0004 Non-Recurring Price - First Option Period | | | | | | |
| Provide Prices For Facility Investment Services | | | | | | | |
| ELINs B700 | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 800,000,000 | ¥ 800,000,000 | |
| | TOTAL NON-RECUURRING PRICE | | | | ¥ 800,000,000 | |
| Kg = | Kilogramme | | | | | | |
| LS = | Lump Sum | | | MO = Month | | | |
| EA = | Each | | | | | | |
&"Times New Roman,Regular"CUI
CUI
2R
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT C - CLIN 9002 |
| Line Item XXXX - | : 0005 | - Recurring Work - Second Option Period | | | | | | | |
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | | | | | | | | | |
| ELIN/Sub-ELINs | | C001 to C009 | | | | | | | |
| ELIN /Sub ELIN | | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio |
| C001 | | | | CNIC | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| C001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| C001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| C001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| C001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| C001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| C001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| C001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | CNIC Total | ¥ | |
| C002 | | | | SRF | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| C002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| | 1604000 | | Wastewater | | | | | |
| C002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| | | | Preventive Maintenance | | | | | |
| C002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| C002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| C002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | SRF Total | ¥ | |
| C003 | | | | DLA | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| C003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| C003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | DLA Total | ¥ | |
| C004 | | | | Housing | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| C004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Housing Total | ¥ | |
| C005 | | | | DODDS | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| C005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| C005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| C005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| | | | Preventive Maintenance (PM) | | | | | |
| C005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| | | | | | | DODDS Total | ¥ | |
| C006 | | | | USNH | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| C006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | 1604000 | | Wastewater | | | | | |
| C006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| | | | Preventive Maintenance (PM) | | | | | |
| C006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| | | | | | | USNH Total | ¥ | |
| C007 | | | | DECA Yokosuka | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| C007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | | | | | | DECA Yokosuka Total | ¥ | |
| C008 | | | | NAVFAC UT | | | | | |
| | 1604000 | | Wastewater | | | | | |
| C008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| | | | | | | NAVFAC UT Total | ¥ | |
| C009 | | | | Navy Lodge | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| C009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Navy Lodge Total | ¥ | |
| Total Recurring Work: | ¥ |
| Note 1: Emergency = E, Urgent = U, Routine =R | | |
&"Times New Roman,Regular"CUI
CUI
2N
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT C - CLIN 9002 |
| Line Item | : 0006 Non-Recurring Price - Second Option Period | | | | | | |
| Provide Prices For Facility Investment Services | | | | | | | |
| ELINs C700 | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| C700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 800,000,000 | ¥ 800,000,000 | |
| | TOTAL NON-RECUURRING PRICE | | | | ¥ 800,000,000 | |
| Kg = | Kilogramme | | | | | | |
| LS = | Lump Sum | | | MO = Month | | | |
| EA = | Each | | | | | | |
&"Times New Roman,Regular"CUI
CUI
3R
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT D - CLIN 9003 |
| Line Item XXXX - | : 0007 | - Recurring Work - Third Option Period | | | | | | | |
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | | | | | | | | | |
| ELIN/Sub-ELINs | | D001 to D009 | | | | | | | |
| ELIN /Sub ELIN | | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio |
| D001 | | | | CNIC | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| D001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| D001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| D001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| D001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| D001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| D001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| D001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | CNIC Total | ¥ | |
| D002 | | | | SRF | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| D002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| | 1604000 | | Wastewater | | | | | |
| D002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| | | | Preventive Maintenance | | | | | |
| D002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| D002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| D002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | SRF Total | ¥ | |
| D003 | | | | DLA | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| D003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| D003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | DLA Total | ¥ | |
| D004 | | | | Housing | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| D004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Housing Total | ¥ | |
| D005 | | | | DODDS | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| D005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| D005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| D005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| | | | Preventive Maintenance (PM) | | | | | |
| D005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| | | | | | | DODDS Total | ¥ | |
| D006 | | | | USNH | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| D006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | 1604000 | | Wastewater | | | | | |
| D006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| | | | Preventive Maintenance (PM) | | | | | |
| D006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| | | | | | | USNH Total | ¥ | |
| D007 | | | | DECA Yokosuka | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| D007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | | | | | | DECA Yokosuka Total | ¥ | |
| D008 | | | | NAVFAC UT | | | | | |
| | 1604000 | | Wastewater | | | | | |
| D008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| | | | | | | NAVFAC UT Total | ¥ | |
| D009 | | | | Navy Lodge | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| D009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Navy Lodge Total | ¥ | |
| Total Recurring Work: | ¥ |
| Note 1: Emergency = E, Urgent = U, Routine =R | | |
CUI
3N
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT D - CLIN 9002 |
| Line Item | : 0008 Non-Recurring Price - Third Option Period | | | | | | |
| Provide Prices For Facility Investment Services | | | | | | | |
| ELINs D700 | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| D700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 800,000,000 | ¥ 800,000,000 | |
| | TOTAL NON-RECUURRING PRICE | | | | ¥ 800,000,000 | |
| Kg = | Kilogramme | | | | | | |
| LS = | Lump Sum | | | MO = Month | | | |
| EA = | Each | | | | | | |
&"Times New Roman,Regular"CUI
CUI
4R
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT E - CLIN 9004 |
| Line Item XXXX - | : 0009 | - Recurring Work - Fourth Option Period | | | | | | | |
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | | | | | | | | | |
| ELIN/Sub-ELINs | | E001 to E009 | | | | | | | |
| ELIN /Sub ELIN | | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio |
| E001 | | | | CNIC | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| E001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| E001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| E001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| E001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| E001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| E001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| E001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | CNIC Total | ¥ | |
| E002 | | | | SRF | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| E002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| | 1604000 | | Wastewater | | | | | |
| E002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| | | | Preventive Maintenance | | | | | |
| E002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| E002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| E002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | SRF Total | ¥ | |
| E003 | | | | DLA | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| E003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| E003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | DLA Total | ¥ | |
| E004 | | | | Housing | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| E004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Housing Total | ¥ | |
| E005 | | | | DODDS | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| E005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| E005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | 1604000 | | Wastewater | | | | | |
| E005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| | | | Preventive Maintenance (PM) | | | | | |
| E005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| | | | | | | DODDS Total | ¥ | |
| E006 | | | | USNH | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| E006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | 1604000 | | Wastewater | | | | | |
| E006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| | | | Preventive Maintenance (PM) | | | | | |
| E006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| | | | | | | USNH Total | ¥ | |
| E007 | | | | DECA Yokosuka | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| E007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| | | | | | | DECA Yokosuka Total | ¥ | |
| E008 | | | | NAVFAC UT | | | | | |
| | 1604000 | | Wastewater | | | | | |
| E008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| | | | | | | NAVFAC UT Total | ¥ | |
| E009 | | | | Navy Lodge | | | | | |
| | 1502000 | | Facility Investment | | | | | |
| | | | Preventive Maintenance (PM) | | | | | |
| E009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| | | | | | | Navy Lodge Total | ¥ | |
| Total Recurring Work: | ¥ |
| Note 1: Emergency = E, Urgent = U, Routine =R | | |
&"Times New Roman,Regular"CUI
CUI
4N
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N40084-27-X-XXXX |
| EXHIBIT E - CLIN 9002 |
| Line Item | : 0010 Non-Recurring Price - Fourth Option Period | | | | | | |
| Provide Prices For Facility Investment Services | | | | | | | |
| ELINs E700 | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| E700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 800,000,000 | ¥ 800,000,000 | |
| | TOTAL NON-RECUURRING PRICE | | | | ¥ 800,000,000 | |
| Kg = | Kilogramme | | | | | | |
| LS = | Lump Sum | | | MO = Month | | | |
| EA = | Each | | | | | | |
&"Times New Roman,Regular"CUI
CUI
Incine
| PMI Work for Incinerator Plant | | | | | | | | | | | | | | | IGE | | | | | | | | | | | |
| | | Base | | 1 | | 2 | | 3 | | 4 | | 5 | | 6 | | Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| | | L | M | L | M | L | M | L | M | L | M | L | M | L | M | L | M | L | M | L | M | L | M | L | M |
| | | 500,000*12月 ツキ | | 500,000*12月 ツキ | | 500,000*12月 ツキ | | 500,000*12月 ツキ | | 500,000*12月 ツキ | | 600,000*12月 | | | | | | | | | | | | | |
| Onsite Stay Labor | PM | 6,000,000 | | 6,000,000 | | 6,000,000 | | 6,000,000 | | 6,000,000 | | 7,200,000 | | 7,704,000 | | | | | | | | | | | |
| | | 450,000*12月 ツキ | | 450,000*12月 ツキ | | 450,000*12月 ツキ | | 450,000*12月 ツキ | | 450,000*12月 ツキ | | 500,000*12月 | | | | | | | | | | | | | |
| Onsite Stay Labor | QC | 5,400,000 | | 5,400,000 | | 5,400,000 | | 5,400,000 | | 5,400,000 | | 6,000,000 | | 6,420,000 | | | | | | | | | | | |
| | | 400,000*12月 ツキ | | 400,000*12月 ツキ | | 400,000*12月 ツキ | | 400,000*12月 ツキ | | 400,000*12月 ツキ | | 450,000*12月 | | | | | | | | | | | | | |
| Onsite Stay Labor | SSHO | 4,800,000 | | 4,800,000 | | 4,800,000 | | 4,800,000 | | 4,800,000 | | 5,400,000 | | 5,778,000 | | | | | | | | | | | |
| | | 400,000*2人*12月 リ ツキ | | 400,000*2人*12月 リ ツキ | | 400,000*2人*12月 リ ツキ | | 400,000*2人*12月 リ ツキ | | 400,000*2人*12月 リ ツキ | | 450,000*3人*12月 | | | | | | | | | | | | | |
| Onsite Stay Labor | OEM | 9,600,000 | | 9,600,000 | | 9,600,000 | | 9,600,000 | | 9,600,000 | | 16,200,000 | | 17,334,000 | | | | | | | | | | | |
| | タクマ純正 ジュンセイ | | 35,600*660個 コ | | 35,600*968個 コ | | 35,600*660個 コ | | 35,600*660個 コ | | 35,600*968個 コ | | 660個 | | | | | | | | | | | | |
| Takuma | ストーカー納入 ノウニュウ | DR-86266 | | 23,496,000 | | 34,460,800 | | 23,496,000 | | 23,496,000 | | 34,460,800 | | 70,500,000 | | | | | | | | | | | | |
| ケーシング | | | 25,300,000 | | 25,300,000 | | 25,300,000 | | 25,300,000 | | 25,300,000 | | | | | | | | | | | | | | |
| 成伸ファーネス セイ ノ | | | | | | | | | | | | | | | | | | | | | | | | | | |
| 焼却炉れんが補修 ショウキャク ロ ホシュウ | 1・2号炉32m2 ゴウ ロ | 8,000,000 | 20,608,000 | 8,000,000 | 20,608,000 | 8,000,000 | 20,608,000 | 8,000,000 | 20,608,000 | 8,000,000 | 20,608,000 | 9,000,000 | 26,500,000 | 9,630,000 | 28,355,000 | | | | | | | | | | |
| 専門業者による センモン ギョウシャ | | 45,000*70人 ニン | 一式 イッシキ | 45,000*100人 ニン | 一式 イッシキ | 45,000*70人 ニン | 一式 イッシキ | 45,000*70人 ニン | 一式 イッシキ | 45,000*100人 ニン | 一式 イッシキ | 60,000*100人 | 一式 | | | | | | | | | | | | |
| 筒井工業(要確認) ツツイ コウギョウ ヨウ カクニン | ストーカ交換工事 コウカン コウジ | 1・2号炉 ゴウ ロ | 3,150,000 | 460,000 | 4,500,000 | 820,000 | 3,150,000 | 460,000 | 3,150,000 | 460,000 | 4,500,000 | 820,000 | 6,000,000 | 1,000,000 | | | | | | | | | | | | |
| | | 80,000*5人 ニン | 一式 イッシキ | 80,000*5人 ニン | 一式 イッシキ | 80,000*10人 ニン | 一式 イッシキ | 80,000*10人 ニン | 一式 イッシキ | 80,000*10人 ニン | 一式 イッシキ | 80,000*10人 | 一式 | | | | | | | | | | | | |
| Tsutsui Kogyo | Insulation of Draft Induction | | | 1,500,000 | | | | | | | | | | 2,000,000 | | 2,140,000 | | | | | | | | | | |
Shonan Reinetsu Insulation of Draft Induction 400,000 500,000 535,000
| Kyokuro Service | Annual Inspection for Crane | C1-00218A | 400,000 | 440,000 | 400,000 | 440,000 | 800,000 | 620,000 | 800,000 | 620,000 | 800,000 | 620,000 | 1,000,000 | 785,000 | 1,070,000 | 840,000 |
| | | 80,000*6人 ニン | 一式 イッシキ | 80,000*6人 ニン | 一式 イッシキ | 80,000*6人 ニン | 一式 イッシキ | 80,000*6人 ニン | 一式 イッシキ | 80,000*6人 ニン | 一式 イッシキ | 80,000*6人 | 一式 | | |
| Kyokuro Service | Once 2 Years Inspection | | | | | 1,400,000 | | | | 1,400,000 | | | | | | |
| Shinazu Access | Annual Inspection Exhaust Gas Analyzer | NSA-308 | 480,000 | 970,000 | 480,000 | 970,000 | 480,000 | 970,000 | 480,000 | 970,000 | 480,000 | 970,000 | 900,000 | 2,288,000 | 963,000 | 2,449,000 |
| | | 80,000*1人*2月 ヒトリ ガツ | 一式 イッシキ | 80,000*1人*2月 ヒトリ ガツ | 一式 イッシキ | 80,000*1人*2月 ヒトリ ガツ | 一式 イッシキ | 80,000*1人*2月 ヒトリ ガツ | 一式 イッシキ | 80,000*1人*2月 ヒトリ ガツ | 一式 イッシキ | 80,000*1人*2月 | 一式 | | |
| Shinazu Access | | 〃 | 160,000 | 120,000 | 160,000 | 120,000 | 160,000 | 120,000 | 160,000 | 120,000 | 160,000 | 120,000 | | | | |
| | | 70,000*1人*10月 ヒトリ ガツ | 一式 イッシキ | 70,000*1人*10月 ヒトリ ガツ | 一式 イッシキ | 70,000*1人*10月 ヒトリ ガツ | 一式 イッシキ | 70,000*1人*10月 ヒトリ ガツ | 一式 イッシキ | 70,000*1人*10月 ヒトリ ガツ | 一式 イッシキ | 80,000*1人*10月 | 一式 | | |
| Kyoto Densi Kogyo | Monthly Inspection Exhaust Gas Analyzer | HL-36N | 700,000 | 550,000 | 700,000 | 550,000 | 700,000 | 550,000 | 700,000 | 550,000 | 700,000 | 550,000 | 800,000 | 560,000 | 856,000 | 600,000 |
| | | 70,000*4人*2月 ニン ガツ | 一式 イッシキ | 70,000*4人*2月 ニン ガツ | 一式 イッシキ | 70,000*4人*2月 ニン ガツ | 一式 イッシキ | 70,000*4人*2月 ニン ガツ | 一式 イッシキ | 70,000*4人*2月 ニン ガツ | 一式 イッシキ | 80,000*4人*2月 | 一式 | | |
| Kyoto Densi Kogyo | Semiannual Inspection Exhaust Gas Analyzer | 〃 | 560,000 | 60,000 | 560,000 | 60,000 | 560,000 | 60,000 | 560,000 | 60,000 | 560,000 | 60,000 | 640,000 | 331,000 | 685,000 | 355,000 |
| | | 70,000*6人 ニン | 一式 イッシキ | 70,000*6人 ニン | 一式 イッシキ | 70,000*6人 ニン | 一式 イッシキ | 70,000*6人 ニン | 一式 イッシキ | 70,000*6人 ニン | 一式 イッシキ | 80,000*6人 | 一式 | | |
| Kyoto Densi Kogyo | Annual Inspection Exhaust Gas Analyzer | 〃 | 420,000 | 540,000 | 420,000 | 540,000 | 420,000 | 540,000 | 420,000 | 540,000 | 420,000 | 540,000 | 480,000 | 540,000 | 514,000 | 578,000 |
| | | 80,000*42人 ニン | 一式 イッシキ | 80,000*42人 ニン | 一式 イッシキ | 80,000*42人 ニン | 一式 イッシキ | 80,000*42人 ニン | 一式 イッシキ | 80,000*42人 ニン | 一式 イッシキ | | | | |
| Base Period Only | | | | | | | | | | | | | | | |
Hitachi Sanki System Annual Inspection Gas Cylinders Compressor OSP-75M5WL 3,360,000 1,800,000 3,360,000 1,800,000 3,360,000 1,800,000 3,360,000 1,800,000 3,360,000 1,800,000 4,000,000 2,425,000 4,280,000 2,595,000
| IHI | Annual Replacement | | 200,000 | | 200,000 | | 200,000 | | 200,000 | | 200,000 | 288,000 | 309,000 |
| | 80,000*18人 ニン | 一式 イッシキ | 80,000*18人 ニン | 一式 イッシキ | 80,000*18人 ニン | 一式 イッシキ | 80,000*18人 ニン | 一式 イッシキ | 80,000*18人 ニン | 一式 イッシキ | 一式 | |
| Hiratsuka Belt | Annual Replacement | | | | 500,000 | | | | 500,000 | | | 650,000 | 696,000 |
| Nihon Dengi | Annual Inspection Instrument | 1,440,000 | 460,000 | 1,440,000 | 460,000 | 1,440,000 | 460,000 | 1,440,000 | 460,000 | 1,440,000 | 460,000 | 1,640,000 | 520,000 | 1,755,000 | 557,000 |
| | 60,000*2名 メイ | 一式 イッシキ | 60,000*2名 メイ | 一式 イッシキ | 60,000*2名 メイ | 一式 イッシキ | 60,000*2名 メイ | 一式 イッシキ | 60,000*2名 メイ | 一式 イッシキ | 60,000*2名 | 一式 | | |
| Hitachi Kokusai Yagi | Annual Inspection ITV Unit | 120,000 | 50,000 | 120,000 | 50,000 | 120,000 | 50,000 | 120,000 | 50,000 | 120,000 | 50,000 | 120,000 | 50,000 | 129,000 | 54,000 |
| | 70,000*6名 メイ | 一式 イッシキ | 70,000*6名 メイ | 一式 イッシキ | 70,000*6名 メイ | 一式 イッシキ | 70,000*6名 メイ | 一式 イッシキ | 70,000*6名 メイ | 一式 イッシキ | 76,000*6名 | 一式 | | |
| Tnakaya | Annual Inspection Truck Scale | 420,000 | 260,000 | 420,000 | 340,000 | 420,000 | 260,000 | 420,000 | 260,000 | 420,000 | 260,000 | 456,000 | 260,000 | 488,000 | 279,000 |
Tnakaya Once 2 Years Inspection Truck Scale 570,000 143,000 570,000 142,500 570,000 142,500
Takuma Cushion Hopper 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000 4,500,000 4,815,000
Outsourcing Fees 3,478,000
| Misc Rental | | | | | | | | | | | | 850,000 | | 910,000 |
| 25,000*200人 ニン | 一式 イッシキ | 25,000*200人 ニン | 一式 イッシキ | 25,000*200人 ニン | 一式 イッシキ | 25,000*200人 ニン | 一式 イッシキ | 25,000*200人 ニン | 一式 イッシキ | 27,500*200人 | 一式 | | |
| Minor Repair | 5,000,000 | 7,000,000 | 5,000,000 | 7,000,000 | 5,000,000 | 7,000,000 | 5,000,000 | 7,000,000 | 5,000,000 | 7,000,000 | 5,500,000 | 7,700,000 | 5,885,000 | 8,239,000 |
| | 一式 イッシキ | | 一式 イッシキ | | 一式 イッシキ | | 一式 イッシキ | | 一式 イッシキ | | 一式 | | 一式 |
| Misc Consumption | 4,000 | 4,000,000 | | 4,000,000 | 6,000 | 4,000,000 | 1,500 | 4,000,000 | 10,200 | 4,000,000 | 8,500 | 4,280,000 | | 5,361,000 |
| Sub-total-1 | 53,514,000 | 88,214,000 | 55,430,000 | 99,761,800 | 53,916,000 | 86,494,000 | 54,481,500 | 88,536,500 | 55,270,200 | 97,818,800 | 70,414,500 | 122,169,500 | 71,784,000 | 54,852,000 |
| Sub-total-2 | | 141,728,000 | | 155,191,800 | | 140,410,000 | | 143,018,000 | | 153,089,000 | | 192,584,000 | | 126,636,000 |
Onsite Direction 11,338,000 12,415,000 11,232,000 11,441,000 12,247,000 19,258,000 12,663,000
| General Administrative Expenses | 5,669,000 | 6,207,000 | 5,616,000 | 5,720,000 | 6,123,000 | 7,703,000 | 5,065,000 |
| OH & Profit | 4,241,000 | 4,653,200 | 4,207,000 | 4,285,000 | 4,587,000 | 5,772,000 | 3,794,000 |
| Total | 162,976,000 | 178,467,000 | 161,465,000 | 164,464,000 | 176,046,000 | 225,317,000 | 148,158,000 |
WWTP-PMI
Note: O = Operation Cost, M = Maintenance (PMI) Cost
| Wastewater Treatment Plant | | | | | | | | | | | |
| | | Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| | | L | M | L | M | L | M | L | M | L | M |
| A-Plant | | | | | | | | | | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | QC 1.0人 ニン | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | 5名 メイ | | | | | | | | | | |
| O | 専門業者に委託 センモン ギョウシャ イタク | | | | | | | | | | | |
| O | 水質・汚泥分析 スイシツ オデイ ブンセキ | BOD,COD,SS他 | | | | | | | | | | |
| O | 清掃 セイソウ | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Replace Activated Carbon by Specialized KTR | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Annual Inspection by Specialized KTR | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Metawater (OEM) Annual Inspection | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Asist Metawater (OEM) | | | | | | | | | | | |
| O | AB焼却 |
| O | 労務費 |
| O | |
| O | 労務費 |
| O | |
| O | 労務費(残業) |
| M | |
| M | Metawater PMI |
| M | |
| M | Metawater Cyber |
| M | |
| M | Metawater Technical Support |
| M | |
| M | Metawater Emergency Labor |
| M | |
| M | Deloitte |
| M | |
| M | Various costs |
| M | |
| M | Metawater Inspection |
| M | |
| M | Asist Metawater Inspection |
| Bプラント | |
| 労務費(常駐) ロウムヒ ジョウチュウ | QC |
| 労務費(常駐) ロウムヒ ジョウチュウ | 0人 ニン |
| 専門業者に委託 センモン ギョウシャ イタク | |
| 水質分析 スイシツ ブンセキ | BOD,COD,SS他 |
| O | Cプラント | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | QC 1.0名 |
| O | | |
| O | 労務費(常駐)水質 ロウムヒ ジョウチュウ スイシツ | 3人 ニン |
| O | | |
| O | 労務費(常駐)焼却 ロウムヒ ジョウチュウ ショウキャク | 3人 ニン |
| O | | |
| O | 労務費(残業)焼却 ロウムヒ ザンギョウ ショウキャク | |
| O | 専門業者に委託 センモン ギョウシャ イタク | |
| O | 水質・汚泥分析 スイシツ オデイ ブンセキ | BOD,COD,SS他 |
| M | | |
| M | Cleaning Labor by Specilized KTR | |
| M | | |
| M | Inspect Incinerator by Specilized KTR | |
| M | (Sludge Settling Tank) | |
| M | 汚泥濃縮槽コーティング オデイ ノウシュク ソウ | |
| M | Nishihara Knkyo Eisei (OEM) | |
| M | Replace Activated Carbon | |
| M | Asist OEM | |
| Ikego Plant | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | QC |
| O | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | 2人 ニン |
| O | 専門業者に委託 センモン ギョウシャ イタク | |
| O | 水質分析 スイシツ ブンセキ | BOD,COD,SS他 |
| M | | |
| M | Replace Activated Carbon by Specilized KTR | |
| Relay Pump Station | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | QC |
| O | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | 4人 ニン |
| M | | |
| M | Inspect Ozone Deodorizer by Specialized KTR | |
| M | PMI | |
| M | Onsite Stay Labor | QC |
| M | | |
| M | Onsite Stay Labor | 2人 ニン |
| Common Expenses | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | PM |
| O | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | テクニカルダイレクター APM |
| O | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | SSHO 2人 |
| M | | |
| M | Cleaning | |
| M | | |
| M | Cleaning Piping & Relay Pump ST | |
| M | | |
| M | Transportation and Disposal of Incineration Ash | |
| M | | |
| M | Disposal "Sisa" | |
| O | 専門業者に委託 センモン ギョウシャ イタク | |
| O | 検体回収費 ケンタイ カイシュウ ヒ | 分析用 ブンセキヨウ |
| M | Sludge Analysis and Incineration Plan | |
| M | Specialized KTR | |
| O | 薬剤納入 ヤクザイ ノウニュウ | 高分子凝集材、苛性ソーダ他 コウブンシ ギョウシュウ ザイ カセイ ホカ |
| M | | |
| M | Annual Inspection UV by Specialized KTR | |
| M | | |
| M | Annual Inspection | |
| M | | |
| M | Monthly Inspection by Specialized KTR | |
| M | PMI Fuel Piping |
| M | |
| M | Ground Maintenance, etcs |
| M | Depreciation Expense Specialized vehicles |
| M | Depreciation expense for patrol vehicles |
| M | |
| M | Minor Repair Work |
| M | |
| M | Misc |
| | Onsite Direction |
| | General Administrative Expenses |
| | OH & Profit |
| M | Septic Tanks & Cesspit Tank | |
| | 合計 ゴウケイ |
WWTP-O
Note: O = Operation Cost, M = Maintenance (PMI) Cost
| Wastewater Treatment Plant | | | | | | | | | | | |
| | | Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| | | L | M | L | M | L | M | L | M | L | M |
| A-Plant | | | | | | | | | | | |
| O | Onsite Stay Labor | QC | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Onsite Stay Labor | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Water Quality and Sludge Analysis | BOD,COD,SS | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Cleaning Labor | | | | | | | | | | | |
| M | 専門業者に委託 センモン ギョウシャ イタク | | | | | | | | | | | |
| M | 活性炭交換 カッセイタン コウカン | | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! |
| M | | | | | | | | | | | | |
| M | 年次点検 ネンジ テンケン | | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! |
| M | | | | | | | | | | | | |
| M | 製造業者(メタウォーター) セイゾウギョウ シャ | 点検業務 | | 104,600,000 | | 80,030,000 | | 45,800,000 | | 49,400,000 | | 53,432,000 |
| M | | | | | | | | | | | | |
| M | 製造業者(メタウォーター) セイゾウギョウ シャ | サポート | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! |
| O | AB Incinarator Plant | | | | | | | | | | | |
| O | Onsite Labor-1 | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Onsite Labor-2 | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Onsite Labor (OT) | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Metawater PMI | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | |
| M | | | | | | | | | | | | |
| M | Metawater Cyber | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | |
| M | | | | | | | | | | | | |
| M | Metawater 技術サポート | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Metawater 緊急対応 | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | |
| M | | | | | | | | | | | | |
| M | Deloitte | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | |
| M | | | | | | | | | | | | |
| M | Various costs | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | |
| M | | | | | | | | | | | | |
| M | 製造業者(メタウォーター) セイゾウギョウ シャ | 点検業務 | | 178,700,000 | | 197,300,000 | | 227,400,000 | | 248,400,000 | | 252,900,000 |
| M | | | | | | | | | | | | |
| M | 製造業者(メタウォーター) セイゾウギョウ シャ | サポート | 1,000,000 | | 1,070,000 | | 1,145,000 | | 1,226,000 | | 1,312,000 | |
| Bプラント | | | | | | |
| 労務費(常駐) ロウムヒ ジョウチュウ | QC | 0 | 0 | 0 | 0 | 0 |
| 労務費(常駐) ロウムヒ ジョウチュウ | 0人 ニン | 0 | | 0 | | 0 | | 0 | | 0 | |
| 専門業者に委託 センモン ギョウシャ イタク | | | | | | | | | | | |
| 水質分析 スイシツ ブンセキ | BOD,COD,SS他 | | 0 | | 0 | | 0 | | 0 | | 0 |
| O | C-Plant | | | | | | | | | | | |
| O | Onsite Stay Labor | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Manage Water Quality | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | OEM Onsite Labor | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Incinerator Labor (OT) | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Water Quality and Sludge Analysis | BOD,COD,SS | | | | | | | | | | |
| M | 専門業者に委託 センモン ギョウシャ イタク | | | | | | | | | | | |
| M | 槽清掃 ソウ セイソウ | | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! |
| M | 専門業者に委託 センモン ギョウシャ イタク | | | | | | | | | | | |
| M | 焼却設備点検 ショウキャク セツビ テンケン | | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! |
| M | (Sludge Settling Tank) | | | | | | | | | | | |
| M | 汚泥濃縮槽コーティング オデイ ノウシュク ソウ | | | | | | | | | | | |
| M | 西原環境衛生 | | | | | | | | | | | |
| M | 活性炭交換 カッセイタン コウカン | | | 7,000,000 | | 7,490,000 | | 8,015,000 | | 8,577,000 | | 9,178,000 |
| M | 西原環境衛生 | サポート | 1,000,000 | | 1,070,000 | | 1,145,000 | | 1,226,000 | | 1,312,000 | |
| Ikego Plant | | | |
| O | Onsite Stay Labor | QC | | |
| O | | | | |
| O | Onsite Stay Labor | | | |
| O | | | | |
| O | Water Quality | BOD,COD,SS | | |
| M | 専門業者に委託 センモン ギョウシャ イタク | | | |
| M | 池子活性炭交換 イケゴ カッセイタン コウカン | | 2,875,000 | 2,850,000 |
| Relay Pump Station | | | | | | | | | | | |
| O | Onsite Stay Labor | QC | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Onsite Stay Labor | | | | | | | | | | | |
| M | 専門業者に委託 センモンギョウシャ イタク | | | | | | | | | | | |
| M | オゾン脱臭装置点検 ダッシュウ ソウチ テンケン | | | 12,500,000 | | 13,680,000 | | 14,250,000 | | 15,596,000 | | 16,245,000 |
| M | | | | | | | | | | | | |
| M | PMIS(メンテナンス) | | | | | | | | | | | |
| M | 労務費(常駐) ロウムヒ ジョウチュウ | QC | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | |
| M | | | | | | | | | | | | |
| M | 労務費(常駐) ロウムヒ ジョウチュウ | 2人 ニン | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | | ERROR:#REF! | |
| Common Expenses | |
| O | Labor | PM |
| O | | |
| O | Onsite Stay Labor | Technical Direction APM |
| O | | |
| O | Labor | SSHO |
| M | | |
| M | 清掃 セイソウ | |
| M | | |
| M | 管路・中継ポンプ場清掃 カンロ チュウケイ ジョウ セイソウ | |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| M | 焼却灰運搬処分 ショウキャクバイ ウンパン ショブン | 一般廃棄物 イッパン ハイキブツ |
| M | | |
| M | しさふさ処分 ショブン | 産業廃棄物 サンギョウ ハイキブツ |
| O | | |
| O | Onsite Sampling | Analysis |
| M | 汚泥分析 焼却計画 オデイ ブンセキ ショウキャク ケイカク | |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| O | Chemical | Polymer flocculants, caustic soda, etc. |
| M | 専門業者に依頼 センモン ギョウシャ イライ | |
| M | UV計年次点検 ケイ ネンジ テンケン | |
| M | | |
| M | 機器類点検 キキルイ テンケン | |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| M | 計装月次点検 ケイソウ ゲツジ テンケン | |
| M | 燃料配管メンテ ネンリョウ ハイカン | |
| M | | |
| M | 美化活動 ビカ カツドウ | |
| M | 特殊車両原価償却費 トクシュ シャリョウ ゲンカ ショウキャクヒ | 高圧洗浄車他 コウアツ センジョウ シャ ホカ |
| M | 巡回車原価償却費 ジュンカイ シャ ゲンカ ショウキャクヒ | 5台 ダイ |
| M | | |
| M | マイナーリペアー | |
| M | | |
| M | 雑材消耗品費 ザツ ザイ ショウモウ ヒン ヒ | |
| | Onsite Direction |
| | General Administrative Expenses |
| | OH & Profit |
| M | Septic Tanks & Cesspit Tank | |
| | Total |
001AB-CFAY-Weight
| Semiannual PM Work for Weight Scale (Bldg. 1822) | | | | | | | | | | |
| Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| L | M | L | M | L | M | L | M | L | M |
| Scale | Electrical and Calibration Inspections by Specialized KTRs |
| Minor Repair Work | |
Onsite Direction
| General Administrative Expenses | | | | | | | | | | | |
| OH & Profit | | | | | | | | | | | |
| BLDG1822 | Total | | | | | | | | | | |
| Annual PMI Work for Weight Scale (Bldg. 4856) | | | | | | | | | | | |
| | Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| | L | M | L | M | L | M | L | M | L | M |
| Scale | Electrical and Calibration Inspections by Specialized KTRs |
| Minor Repair Work | |
Onsite Direction
| General Administrative Expenses |
| OH & Profit |
001AC-CFAY-DWT
| Bid Price | IGE | | | | | |
| 5th | 6th | Base (Renew) | 1st (Renew) | 2nd (Renew) | 3rd (Renew) | 4th (Renew) |
| Portion | UH | | | | | | |
| Location | YSK-1516, 1517, 3333 & 3387 | | | | | | |
| Professional company | 262,750 | 276,000 | | | | | |
| Analysis lab | 77,570 | 82,000 | | | | | |
| Chemical | 11,980 | 13,000 | | | | | |
| Calibration | 5,800 | 7,000 | | | | | |
| Minor | 59,900 | 63,000 | | | | | |
| Subtotal | 418,000 | 441,000 | | | | | |
| OH & Profit | 63,000 | 66,000 | | | | | |
| Total | 481,000 | 507,000 | | | | | |
| Portion | MWR | |
| Location | YSK-3008 & 1495 | |
| Professional company | 308,730 | 331,000 |
| Analysis lab | 91,100 | 98,000 |
| Chemical | 14,070 | 16,000 |
| Calibration | 7,000 | 8,000 |
| Minor | 70,100 | 76,000 |
| Subtotal | 491,000 | 529,000 |
| OH & Profit | 74,000 | 79,000 |
| Total | 565,000 | 608,000 |
| Portion | COMSUBGRU-7 | |
| Location | YSK-3128 | |
| Professional company | 442,700 | 474,000 |
| Analysis lab | 130,500 | 140,000 |
| Chemical | 20,000 | 22,000 |
| Calibration | 10,000 | 11,000 |
| Minor | 100,800 | 108,000 |
| Subtotal | 704,000 | 755,000 |
| OH & Profit | 105,000 | 113,000 |
| Total | 809,000 | 868,000 |
| Portion | NAVFAC FE | |
| Location | YSK-4328 | |
| Professional company | 83,600 | 90,000 |
| Analysis lab | 24,650 | 27,000 |
| Chemical | 3,800 | 5,000 |
| Calibration | 1,900 | 3,000 |
| Minor | 19,050 | 21,000 |
| Subtotal | 133,000 | 146,000 |
| OH & Profit | 20,000 | 22,000 |
| Total | 153,000 | 168,000 |
| Portion | NEX | |
| Location | NDK-100134 | |
| Professional company | 186,000 | 200,000 |
| Analysis lab | 55,000 | 59,000 |
| Chemical | 9,000 | 10,000 |
| Calibration | 4,500 | 5,000 |
| Minor | 42,500 | 46,000 |
| Subtotal | 297,000 | 320,000 |
| OH & Profit | 44,000 | 48,000 |
| Total | 341,000 | 368,000 |
| Portion | PRY32 once / three years |
| Location | AZU-8600443,YSK-1595,1597, 1609, 3303, 5201, R-1, IKE-605 & 657) |
| Bid Price | IGE | | | | | |
| 3rd | 6th | Base (Renew) | 1st (Renew) | 2nd (Renew) | 3rd (Renew) | 4th (Renew) |
| | N/A | N/A | X | N/A | N/A |
| 2,283,000 | | | | | | |
CFAY TOTAL 2,349,000 2,519,000 0 0 0 0 0
001AE-CFAY-GAC
Bi-weekly Visual Inspection for GAC Filtering System
| Base (Renew) | 1st (Renew) | 2nd (Renew) | 3rd (Renew) | 4th (Renew) |
| L&M | L&M | L&M | L&M | L&M |
Sub-total-1
General Administrative Expenses
OH&Profit
Total
001AF-CFAY-Septic Septic Tanks & Cesspit Tank including E/U/R Work
| Base (Renew) | 1st (Renew) | 2nd (Renew) | 3rd (Renew) | 4th (Renew) |
| L&M | L&M | L&M | L&M | L&M |
| 982 | | | | | |
| 3362 | | | | | |
| S-5 | | | | | |
| S-239 | | | | | |
| S-125 | | | | | |
| 8600361 | | | | | |
| 8600376 | | | | | |
| 8600378 | | | | | |
| S-11 | | | | | |
| S-15 | | | | | |
| S-20 | | | | | |
| 274 | | | | | |
| 123 | | | | | |
| 830147 | | | | | |
| Sub-total-1 | | | | | |
Minor Repair
Sub-total-2
General Administrative Expenses
OH&Profit
Total
001AG-CFAY-Paint
| Paint Water Treatment Plant | | | | | | | | | | |
| Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| L | M | L | M | L | M | L | M | L | M |
| PM by Specialized KTR |
| Minor Repair |
| General Administrative Expenses |
| OH & Profit |
002C-SRF
| Bilge Water Treatment Plant |
| YSK-DD4 |
| Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| L | M | L | M | L | M | L | M | L | M |
| PM by Specialized KTR |
| Labor |
| Minor Repair |
Onsite Direction
OH & Profit
Total
| Bilge Water Drainage Pipeline |
| Biweekly PMI Work |
| YSK-B12 |
| Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| L | M | L | M | L | M | L | M | L | M |
| PM by Specialized KTR |
| Repair by Specialized KTR |
| Labor |
| Minor Repair |
Onsite Direction
OH & Profit
Total
Annual PMI Work
| PM by Specialized KTR |
| Repair by Specialized KTR |
| Labor |
| Minor Repair |
Onsite Direction
OH & Profit
Total
総合計
003AB-DLA-Weight
| Semiannual PMI Work for Weight Scale | | | | | | | | | | |
| Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| L | M | L | M | L | M | L | M | L | M |
Labor QC.SSHO
| Scale | Electrical and Calibration Inspections by Specialized KTRs |
| Forklift | |
| Minor Repair | |
Onsite Direction
| General Administrative Expenses | |
| OH & Profit | |
| Total |
004AA-HSG-DWT
| Base (Renew) | 1st (Renew) | 2nd (Renew) | 3rd (Renew) | 4th (Renew) |
| YSK-1152 , 1151, 1150, 1149, 1148, 1147, 3802, 4309, 4319, 3823, 3826, 3835, 3839, 3849, 3853, 4401, 4402, 4359 | | | | |
| IKE-665, 680, 679, 678, 677, 692, 693, 694 | | | | |
| Professional company | | | | | |
| Analysis lab | | | | | |
| Chemical | | | | | |
| Calibration | | | | | |
| Minor | | | | | |
| Subtotal | | | | | |
| OH & Profit | | | | | |
| Total | | | | | |
005AB-DWT-DODDS
| Base (Renew) | 1st (Renew) | 2nd (Renew) | 3rd (Renew) | 4th (Renew) |
| Professional company | | | | | |
| Analysis lab | | | | | |
| Chemical | | | | | |
| Calibration | | | | | |
| Minor | | | | | |
| Subtotal | | | | | |
| OH & Profit | | | | | |
| Total | | | | | |
009AA-DWT-NavyLodge
| Navy Lodge |
| YSK-1315 & 1316 |
| Base (Renew) | 1st (Renew) | 2nd (Renew) | 3rd (Renew) | 4th (Renew) |
| Professional company | | | | | |
| Analysis lab | | | | | |
| Chemical | | | | | |
| Calibration | | | | | |
| Minor | | | | | |
| Subtotal | | | | | |
| OH & Profit | | | | | |
| Total | | | | | |
Increased-PMI Note: O = Operation Cost, M = Maintenance (PMI) Cost
| Wastewater Treatment Plant | | IGE | | | | | | | | | |
| | | Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| | | L | M | L | M | L | M | L | M | L | M |
| A-Plant | | | | | | | | | | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | QC 1.0人 ニン | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | 5名 メイ | | | | | | | | | | |
| O | 専門業者に委託 センモン ギョウシャ イタク | | | | | | | | | | | |
| O | 水質・汚泥分析 スイシツ オデイ ブンセキ | BOD,COD,SS他 | | | | | | | | | | |
| O | 清掃 セイソウ | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Replace Activated Carbon by Specialized KTR | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Annual Inspection by Specialized KTR | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Metawater (OEM) Annual Inspection | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | Asist Metawater (OEM) | | | | | | | | | | | |
| O | AB焼却 | |
| O | 労務費 | |
| O | | |
| O | 労務費 | |
| O | | |
| O | 労務費(残業) | ERROR:#REF! |
| M | | |
| M | Metawater PMI | |
| M | | |
| M | Metawater Cyber | |
| M | | |
| M | Metawater Technical Support | |
| M | | |
| M | Metawater Emergency Labor | |
| M | | |
| M | Deloitte | |
| M | | |
| M | Various costs | ERROR:#REF! |
| M | | |
| M | Metawater Inspection | |
| M | | |
| M | Asist Metawater Inspection | |
| Bプラント | |
| 労務費(常駐) ロウムヒ ジョウチュウ | QC |
| 労務費(常駐) ロウムヒ ジョウチュウ | 0人 ニン |
| 専門業者に委託 センモン ギョウシャ イタク | |
| 水質分析 スイシツ ブンセキ | BOD,COD,SS他 |
| O | Cプラント | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | QC 1.0名 |
| O | | |
| O | 労務費(常駐)水質 ロウムヒ ジョウチュウ スイシツ | 3人 ニン |
| O | | |
| O | 労務費(常駐)焼却 ロウムヒ ジョウチュウ ショウキャク | 3人 ニン |
| O | | |
| O | 労務費(残業)焼却 ロウムヒ ザンギョウ ショウキャク | |
| O | 専門業者に委託 センモン ギョウシャ イタク | |
| O | 水質・汚泥分析 スイシツ オデイ ブンセキ | BOD,COD,SS他 |
| M | | |
| M | Cleaning Labor by Specilized KTR | |
| M | | |
| M | Inspect Incinerator by Specilized KTR | |
| M | (Sludge Settling Tank) | |
| M | 汚泥濃縮槽コーティング オデイ ノウシュク ソウ | |
| M | Nishihara Knkyo Eisei (OEM) | |
| M | Replace Activated Carbon | |
| M | Asist OEM | |
| Ikego Plant | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | QC |
| O | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | 2人 ニン |
| O | 専門業者に委託 センモン ギョウシャ イタク | |
| O | 水質分析 スイシツ ブンセキ | BOD,COD,SS他 |
| M | | |
| M | Replace Activated Carbon by Specilized KTR | |
| Relay Pump Station | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | QC |
| O | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | 4人 ニン |
| M | | |
| M | Inspect Ozone Deodorizer by Specialized KTR | |
| M | PMI | |
| M | Onsite Stay Labor | QC |
| M | | |
| M | Onsite Stay Labor | 2人 ニン |
| Common Expenses | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | PM |
| O | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | テクニカルダイレクター APM |
| O | | |
| O | 労務費(常駐) ロウムヒ ジョウチュウ | SSHO 2人 |
| M | | |
| M | Cleaning | |
| M | | |
| M | Cleaning Piping & Relay Pump ST | |
| M | | |
| M | Transportation and Disposal of Incineration Ash | |
| M | | |
| M | Disposal "Sisa" | |
| O | 専門業者に委託 センモン ギョウシャ イタク | |
| O | 検体回収費 ケンタイ カイシュウ ヒ | 分析用 ブンセキヨウ |
| M | Sludge Analysis and Incineration Plan | |
| M | Specialized KTR | |
| O | 薬剤納入 ヤクザイ ノウニュウ | 高分子凝集材、苛性ソーダ他 コウブンシ ギョウシュウ ザイ カセイ ホカ |
| M | | |
| M | Annual Inspection UV by Specialized KTR | |
| M | | |
| M | Annual Inspection | |
| M | | |
| M | Monthly Inspection by Specialized KTR | |
| M | PMI Fuel Piping |
| M | |
| M | Ground Maintenance, etcs |
| M | Depreciation Expense Specialized vehicles |
| M | Depreciation expense for patrol vehicles |
| M | |
| M | Minor Repair Work |
| M | |
| M | Misc |
| | Onsite Direction |
| | General Administrative Expenses |
| | OH & Profit |
| M | Septic Tanks & Cesspit Tank | |
| | 合計 ゴウケイ |
Increased-O Note: O = Operation Cost, M = Maintenance (PMI) Cost
| Wastewater Treatment Plant | | | | | | | | | | | |
| | | Base (Renew) | | 1st (Renew) | | 2nd (Renew) | | 3rd (Renew) | | 4th (Renew) | |
| | | L | M | L | M | L | M | L | M | L | M |
| A-Plant | | | | | | | | | | | |
| O | Onsite Stay Labor | QC | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Onsite Stay Labor | | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Water Quality and Sludge Analysis | BOD,COD,SS | | | | | | | | | | |
| O | | | | | | | | | | | | |
| O | Cleaning Labor | | | | | | | | | | | |
| M | 専門業者に委託 センモン ギョウシャ イタク | | | | | | | | | | | |
| M | 活性炭交換 カッセイタン コウカン | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | 年次点検 ネンジ テンケン | | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | 製造業者(メタウォーター) セイゾウギョウ シャ | 点検業務 | | | | | | | | | | |
| M | | | | | | | | | | | | |
| M | 製造業者(メタウォーター) セイゾウギョウ シャ | サポート | | | | | | | | | | |
| O | AB Incinarator Plant | | |
| O | Onsite Labor-1 | | |
| O | | | |
| O | Onsite Labor-2 | | |
| O | | | |
| O | Onsite Labor (OT) | | ERROR:#REF! |
| M | | | |
| M | Metawater PMI | | |
| M | | | |
| M | Metawater Cyber | | |
| M | | | |
| M | Metawater 技術サポート | | |
| M | | | |
| M | Metawater 緊急対応 | | |
| M | | | |
| M | Deloitte | | |
| M | | | |
| M | Various costs | | ERROR:#REF! |
| M | | | |
| M | 製造業者(メタウォーター) セイゾウギョウ シャ | 点検業務 | |
| M | | | |
| M | 製造業者(メタウォーター) セイゾウギョウ シャ | サポート | |
| Bプラント | |
| 労務費(常駐) ロウムヒ ジョウチュウ | QC |
| 労務費(常駐) ロウムヒ ジョウチュウ | 0人 ニン |
| 専門業者に委託 センモン ギョウシャ イタク | |
| 水質分析 スイシツ ブンセキ | BOD,COD,SS他 |
| O | C-Plant | |
| O | Onsite Stay Labor | |
| O | | |
| O | Manage Water Quality | |
| O | | |
| O | OEM Onsite Labor | |
| O | | |
| O | Incinerator Labor (OT) | |
| O | | |
| O | Water Quality and Sludge Analysis | BOD,COD,SS |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| M | 槽清掃 ソウ セイソウ | |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| M | 焼却設備点検 ショウキャク セツビ テンケン | |
| M | (Sludge Settling Tank) | |
| M | 汚泥濃縮槽コーティング オデイ ノウシュク ソウ | |
| M | 西原環境衛生 | |
| M | 活性炭交換 カッセイタン コウカン | |
| M | 西原環境衛生 | サポート |
| Ikego Plant | |
| O | Onsite Stay Labor | QC |
| O | | |
| O | Onsite Stay Labor | |
| O | | |
| O | Water Quality | BOD,COD,SS |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| M | 池子活性炭交換 イケゴ カッセイタン コウカン | |
| Relay Pump Station | |
| O | Onsite Stay Labor | QC |
| O | | |
| O | Onsite Stay Labor | |
| M | 専門業者に委託 センモンギョウシャ イタク | |
| M | オゾン脱臭装置点検 ダッシュウ ソウチ テンケン | |
| M | | |
| M | PMIS(メンテナンス) | |
| M | 労務費(常駐) ロウムヒ ジョウチュウ | QC |
| M | | |
| M | 労務費(常駐) ロウムヒ ジョウチュウ | 2人 ニン |
| Common Expenses | |
| O | Labor | PM |
| O | | |
| O | Onsite Stay Labor | Technical Direction APM |
| O | | |
| O | Labor | SSHO |
| M | | |
| M | 清掃 セイソウ | |
| M | | |
| M | 管路・中継ポンプ場清掃 カンロ チュウケイ ジョウ セイソウ | |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| M | 焼却灰運搬処分 ショウキャクバイ ウンパン ショブン | 一般廃棄物 イッパン ハイキブツ |
| M | | |
| M | しさふさ処分 ショブン | 産業廃棄物 サンギョウ ハイキブツ |
| O | | |
| O | Onsite Sampling | Analysis |
| M | 汚泥分析 焼却計画 オデイ ブンセキ ショウキャク ケイカク | |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| O | Chemical | Polymer flocculants, caustic soda, etc. |
| M | 専門業者に依頼 センモン ギョウシャ イライ | |
| M | UV計年次点検 ケイ ネンジ テンケン | |
| M | | |
| M | 機器類点検 キキルイ テンケン | |
| M | 専門業者に委託 センモン ギョウシャ イタク | |
| M | 計装月次点検 ケイソウ ゲツジ テンケン | |
| M | 燃料配管メンテ ネンリョウ ハイカン | |
| M | | |
| M | 美化活動 ビカ カツドウ | |
| M | 特殊車両原価償却費 トクシュ シャリョウ ゲンカ ショウキャクヒ | 高圧洗浄車他 コウアツ センジョウ シャ ホカ |
| M | 巡回車原価償却費 ジュンカイ シャ ゲンカ ショウキャクヒ | 5台 ダイ |
| M | | |
| M | マイナーリペアー | |
| M | | |
| M | 雑材消耗品費 ザツ ザイ ショウモウ ヒン ヒ | |
| | Onsite Direction |
| | General Administrative Expenses |
| | OH & Profit |
| M | Septic Tanks & Cesspit Tank | |
| | Total |