About this file

01370 - Schedule of Values

View the file

Other files

File Type Posted
ReportingReqmts.docx DOCX document
S090020A1.pdf PDF
Amend001.doc DOC document
GenDec9-4-09.doc DOC document
S090020a.pdf PDF
GenDec7-31-09.doc DOC document
S090020a.doc DOC document
S090020.pdf PDF
SupplementalInfo(ServiceBldgRoof).doc DOC document
SupplementalInfo(WAB(labs)Roof).doc DOC document
Section07620 ShtmtlFlashing Trim.doc DOC document
Section06105 Misc.Carpentry.doc DOC document
S090020.doc DOC document
Section07543 RoofRestoration.doc DOC document
Section01500 TempControls.doc DOC document
Section07540 TPAMembraneRoofing.doc DOC document
Section01740 Warranties.doc DOC document
Section01010 SummaryOfWork.doc DOC document
Section01631 Products Subs.doc DOC document
GenDec8-15-08.doc DOC document
SupplementalInfo(WAB(dir.wing)Roof).doc DOC document
Section01560 EnvProtection.doc DOC document
Section01600 Materials.doc DOC document
Section01016 SafetyDuringConst.doc DOC document
Section01105 SpecialConditions.doc DOC document
Section01040 ProjectCoord.doc DOC document
Section01732 SelectiveDemo.doc DOC document
BidDocumentsTableOfContents.doc DOC document
Section01781 ProjectRecordDocs.doc DOC document
Section01700 ContractCloseout.doc DOC document
Section01736 SelectiveDemo.doc DOC document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA AGRICULTURAL RESEARCH SERVICE

WAB, 1st and 2nd Floors, HVAC Upgrade

Western Regional Research Center

Albany, CA

Solicitation No.AG-95CV-S-09-0020 Recovery – Replace or Repair/Resurface Roofs, Main Bldg

(N.Wing), WAB, Service Bldg, WRRC, Albany, CA

SECTION 01370 – SCHEDULE OF VALUES

PART 1 GENERAL

1.1 DESCRIPTION

A.

Submit to Contracting Officer a Schedule of Values not later than 14 calendar days after contract award. Upon request by Contracting Officer, support values given with data that will substantiate their correctness. Submit quantities of designated materials. List quantities of materials specified under unit price allowances. Use Schedule of Values only as basis for Contractor's application for payment.

1.2 FORM OF SUBMITTAL

A.

Submit typewritten Schedule of Values on ARS Form 371; refer to IFB, General Conditions, for Construction Progress & Payment Schedule. Use ARS Form 371 as basis for format for listing costs of work for Sections under Divisions 2 through 16.

1.3 REVIEW AND RESUBMITTAL

A.

After review by Contracting Officer, revise and resubmit schedule as required. Resubmit revised schedule in the same manner as described under 1.2.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

END OF SECTION 01370

PAGE

PAGE

Schedule of Values

01370 - 1