912_2a_Trailbed slope S-10-0292.pdf

PDF 595 KB Posted

Attached to
RECOVERY - OHV REHABILITATION, NORTHWEST MONTANA COUNTIES
Solicitation number
AG-82B1-S-10-0292
Issued by

About this file

912-2(a) Trailbed and Slope Finish

View the file

Other files

File Type Posted
913_1a_Turnpike S-10-0292.pdf PDF
Bass Construction Notes S-10-0292.docx DOCX document
922_3. Rubber Belt Waterbar S-10-0292pdf.pdf PDF
Ex. 2 Site Map S-10-0292.pdf PDF
Exhibits A_ S-10-0292.doc DOC document
S-10-0292 B-M.docx DOCX document
248_drop creek S-10-0292.xlsx XLSX spreadsheet
MTSCA76-1342.txt TXT text file
taylor ck182 S-10-0292 .xlsx XLSX spreadsheet
Exhibit 3_Camping stock use S-10-0292 Weed Free.doc DOC document
EXHIBIT_5 Trail Maint Reconstr. S-10-0292.docx DOCX document
912-1_Typical Trail X Sect S-10-0292.pdf PDF
Ex 1 Site Map S-10-0292.pdf PDF
912_5(a). Rolling Dip S-10-0292pdf.pdf PDF
SF 18 S-10-0292.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAILBED AND SLOPE FINISH

NOT TO SCALE

Siooe Finish Trailbed Fin ish

Remove roots over _1_ inches in diameter that protrude from the backslope.

Remove loose rock on the trailbed surface over _2_ inches in the smallest dimension.

Remove or reduce embedded rock that protrudes more than _2_ inches above the troilbed.

3ockslope Ratio Rock 1 : 2

Common 1 ; 2

Fill Slope Ratio Rock 1: 1

Common 1.5 : 1

I

I I

I I

I Trailbed

Minimum Clearance Requirements

Ditch Section

Single track: 6" min. and depth required to drain OHV: 12" min. and depth required to drain

SlOpe notaliOn (honzontal : vertical) 2/2010 91 2 - 2(a)

File details come from the government source that posted it. Updated .