Oakey_Report_doc.pdf
PDF 2 MB Posted
- Attached to
- HM - Noontime Demolition Project Federal contract opportunity
- Solicitation number
- AG-569R-S-14-0040
About this file
Attachment 4 - Oakey Site
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Hess.pdf | ||
| Experience_Questionnaire.doc | DOC document | |
| Fountain.pdf | ||
| Noontime_Maps.pdf | ||
| Cline_Property.pdf | ||
| AG-569R-S-14-0040.rtf | RTF text file | |
| Allen.pdf | ||
| Ahlborn.pdf | ||
| 05-2271.txt | TXT text file | |
| Noontime_Pictures.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
05-16-14
Agency:
Huron-Manistee National Forest Attn: James Strezisher, Facilities Engineer 1755 South Mitchell Street Cadillac, MI 49601
Regarding: Pre-Demo Survey
Structure: Vacant Residential Property: Oakey Cabin
Location: Huron-Manistee National Forest
Project No: 050614-4
Project Date: 05-06-14
Dear Client:
In accordance with our agreement, Compli√Chek Environmental Compliance, LLC (C√C) has conducted a pre-demolition asbestos survey and comprehensive paint testing at the above property. This survey was conducted on 05-06-14 by Burt Russell, a Michigan-licensed asbestos inspector (No. A5519), and Lead Risk Assessor (No. P00187).
Compli√Chek appreciates the opportunity to provide environmental services on this project.
Should you need additional services on this or any other project, please feel free to call us.
Respectfully submitted, Compli√Chek, LLC
Burt Russell Project Specialist
PRE-DEMOLITION ASBESTOS SURVEY
and LEAD-BASED PAINT INSPECTION
Vacant Residential Property
Oakey Cabin
Huron Manistee National Forest
PREPARED FOR:PREPARED FOR:PREPARED FOR:PREPARED FOR: HuronHuronHuronHuron----Manistee National ForestManistee National ForestManistee National ForestManistee National Forest
1755 South Mitchell St1755 South Mitchell St1755 South Mitchell St1755 South Mitchell Streetreetreetreet
Cadillac, MI 49601Cadillac, MI 49601Cadillac, MI 49601Cadillac, MI 49601
PREPARED BY: CompliCompliCompliCompli----ChekChekChekChek ASSESSOR:ASSESSOR:ASSESSOR:ASSESSOR: Burt RussellBurt RussellBurt RussellBurt Russell 2709 Geert Court2709 Geert Court2709 Geert Court2709 Geert Court MI No. PMI No. PMI No. PMI No. P----0187018701870187 Lansing, MI 48910Lansing, MI 48910Lansing, MI 48910Lansing, MI 48910
PROJECT DATE: 05050505----06060606----14141414 REPORT DATE:REPORT DATE:REPORT DATE:REPORT DATE: 05-16-14
Burt R. Russell Michigan Asbestos Inspector # AA5519 Michigan Lead Risk Assessor # P00187
COMPLIa CHEK LLC 2709 GEERT COURT LANSING, MI 48910 (517) 507-2547 C-C Project No. 050614-4
Table of Contents
Report Section
Project Summary
Interpretation of Results and Regulatory Guidelines
Space / Material Inventory
Material Sampling / Asbestos Content
Laboratory Analytical Reports
Asbestos Sampling and Analytical Procedures
Paint Testing by X-Ray Florescence
Inspector and Laboratory Certification
PROJECT SUMMARY
SECTION 1
1.0 PROJECT OVERVIEW
Compli√Chek, LLC (C√C) has conducted a Pre-Demolition Survey at Huron Manistee National Forest, . The survey performed at the subject site encompassed all interior / exterior spaces and identified all building components with respect to asbestos and lead-based paint. The inspector performed a space-by space survey of materials and their locations, employing destructive methods in order to locate and sample concealed materials. Section 1 of the report summarizes the findings of the asbestos survey. Section 2 details steps to comply with NESHAPs requirements (defined below).
Section 3 locates and quantifies all materials within designated spaces. Section 4 identifies asbestos sample locations and summarizes analytical results with all laboratory findings following in Section 5.
Compli√Chek uses assessment, sampling and analytical procedures standardized in 1987 by the EPA Asbestos Hazards Emergency Response Act, (40 CFR 763 Subpart M; AHERA). These methodologies are summarized in Section 6. The Michigan–licensed inspector on this project was Burt Russell; copies of all accreditation are located in Section 7. A Schematic drawing of the structures located on the property is located at Section 8. Additional X-Ray florescence testing of all painted components found on the property is located at Section 9.
1.2 PROJECT SCOPE
The requirements for performing a pre-demolition or pre-renovation survey are found in Federal Standard Number 40 CFR 61, entitled: National Emissions Standards for Hazardous Air Pollutants (NESHAP). The NESHAP standards require that, prior to a renovation or demolition activity, all materials which could potentially contain asbestos must be designated as one of the following:
• NACM (Nonasbestos-Containing Material) are materials containing less than 1% asbestos. All NACM discovered is detailed in Section 5 of this report.
• RACM (Regulated Asbestos-Containing Materials) are any of the following:
� Friable ACM* � NCAT-1 ACM that has become friable or will be subject to sanding, grinding, cutting or abrading � NCAT-2 ACM that is likely to or has become crumbled, pulverized or reduced to powder by renovation or demolition activities.
RACM is detailed and discussed in Section 2A. RACM must always be removed from the structure before demolition or, if it will be disturbed, before renovation.
• NCAT-1 (NESHAP CATegory- 1 non-friable material)** � gaskets, packings, flooring, asphalt roofing products containing more than 1% asbestos).
• NCAT-2 (NESHAP CATegory- 2 non-friable material)** � Any ACM, excluding Category 1, containing more than 1% asbestos that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.
* Friable ACM is any asbestos-containing material that may be crushed, crumbled or reduced to powder by hand pressure.
** NCAT-1 & NACAT-2 materials are detailed and discussed in Section 2B Some NCAT-1 & NACAT-2 materials may remain in the structure during a demolition if they are not friable prior to the demolition and the demo contractor complies with OSHA/MIOSHA requirements.
1B
Summary of Findings
RACM was not discovered
NCAT-1 was not discovered
NCAT-2 was not discovered
RESULTS AND REGULATORY GUIDELINES
SECTION 2
A material is considered by the Environmental Protection Agency (EPA) and the State of Michigan, Department of Labor and Economic Growth to be an asbestos-containing material (ACM) if at least one analysis from a collected sample yields a result greater than 1% asbestos (chrysotile, amosite, tremolite, crocidolite), or, if a material is assumed to contain asbestos based on the knowledge and observation of the licensed inspector. The client may, at any time, choose to rebut a positive assumption with confirmatory analysis of three samples of the material, stopping further analysis on the first positive sample. The client must treat any ACM material as an assumed asbestos-containing material and forego any analysis.
A material is considered by the Environmental Protection Agency (EPA) and the State of Michigan, Department of Labor and Economic Growth to be an asbestos-containing material (ACM) if at least one analysis from a collected sample yields a result greater than 1% asbestos (chrysotile, amosite, tremolite, crocidolite), or, if a material is assumed to contain asbestos based on the knowledge and observation of the licensed inspector. For all RACM, NCAT-1 and NCAT-2 ACM identified during the survey, the following regulatory requirements are applicable.
2A-1 Regulated Asbestos-Containing Materials (RACM)
None Discovered
2A-2 NESHAPs Category 1 & 2 That Must Be Removed Before Demo/Reno
2A-3 NESHAPs Category 1 & 2 That May Remain for Demo/Reno
2A-4
NON-ASBEST0S CONTANING MATERIALS
These materials may remain with the structure during demolition.
SPACE NUMBER/SPACE DESCRIPTION: ASSIGNED BY THE INSPECTOR, IDENTIFIES SPACES OR AREAS OF BUILDING INTERIORS/EXTERIORS; MATERIAL NUMBER / MATERIAL DESCRIPTION: ASSIGNED BY INSPECTOR FOR EACH MATERIAL IDENTIFIED; MATERIAL TYPE: (S)URFACING MATERIAL / (T)HERMAL SYSTEM INSULATION / M)ISCELLANEOUS MATERIAL NESHAP CATEGORY: NCAT-1 = CATEGORY 1 NON-FRIABLE / NCAT-2 = CATEGORY 2 NONFRIABLE / RACM= REGULATED ASBESTOS-CONTAINING MATERIAL / NACM = NON-ASBESTOS CONTAINING MATERIAL PERCENT ASBESTOS: PERCENT BY WEIGHT OR ND (NONE DETECTED) F/NF: FRIABLE OR NON- FRIABLE; MATERIAL IS ABLE TO BE REDUCED TO POWDER BY HAND PRESSURE; QUANTITY: ESTIMATED AMOUNT OF MATERIAL UNIT OF MEASURE: (LF)/LINEAL FEET; (SF)/SQUARE FEET; (EA)/EACH
S P
A C
E
N U
M B
R
SPACE DESCRIPTION
M A
T E
R
IA
L
M B
MATERIAL DESCRIPTION
A
T E
R
T Y
P
A
T E
R
O
N D
IT
IO
S H
T
E G
O
R C
E
S
B E
S T
F /N
Q
A N
T
IT
IT
A S
U
OAKEY OAKEY CABIN 11 ASPHALT FLOOR AND ROOF SHINGLE MM NA NACM ND NF NA NA
OAKEY OAKEY CABIN 12 GYPSUM BOARD #1 MM NA NACM ND F NA NA
OAKEY OAKEY CABIN 12 GYPSUM BOARD #2 MM NA NACM ND F NA NA
SPACE / MATERIAL INVENTORY
SECTION 3
SPACE NUMBER/SPACE DESCRIPTION: ASSIGNED BY THE INSPECTOR, IDENTIFIES SPACES OR AREAS OF BUILDING INTERIORS/EXTERIORS; MATERIAL NUMBER / MATERIAL DESCRIPTION: ASSIGNED BY INSPECTOR FOR EACH MATERIAL IDENTIFIED; MATERIAL TYPE: (S)URFACING MATERIAL / (T)HERMAL SYSTEM INSULATION / M)ISCELLANEOUS MATERIAL NESHAP CATEGORY: NCAT-1 = CATEGORY 1 NON-FRIABLE / NCAT-2 = CATEGORY 2 NONFRIABLE / RACM= REGULATED ASBESTOS-CONTAINING MATERIAL / NACM = NON-ASBESTOS CONTAINING MATERIAL PERCENT ASBESTOS: PERCENT BY WEIGHT OR ND (NONE DETECTED) F/NF: FRIABLE OR NON- FRIABLE; MATERIAL IS ABLE TO BE REDUCED TO POWDER BY HAND PRESSURE; QUANTITY: ESTIMATED AMOUNT OF MATERIAL UNIT OF MEASURE: (LF)/LINEAL FEET; (SF)/SQUARE FEET; (EA)/EACH
S P
A
M B
SPACE DESCRIPTION
A
T E
R
M B
MATERIAL DESCRIPTION
A
T E
R
T E
R
N D
IT
IO
S H
T
E G
O
R C
E
B E
S T
/N
Q
A N
T
IT
IT
A S
U
OAKEY OAKEY CABIN 11 ASPHALT FLOOR AND ROOF SHINGLE MM NA NACM ND NF NA NA
OAKEY OAKEY CABIN 12 GYPSUM BOARD #1 MM NA NACM ND F NA NA
OAKEY OAKEY CABIN 12 GYPSUM BOARD #2 MM NA NACM ND F NA NA
MATERIAL SAMPLING
SECTION 4
MATERIAL #11: OAKEY ROOF/WALL SHINGLES
SAMPLE # SAMPLE LOCATION ASBESTOS PRESENT ? TYPE
01-A BACK WALL NONE DETECTED NA
01-B ROOF NONE DETECTED NA
01-C FRONT WALL NONE DETECTED NA
MATERIAL #12: GYPSUM BOARD
SAMPLE # SAMPLE LOCATION ASBESTOS PRESENT ? TYPE
02-A ENTRY SIDE WALL: HARDER TYPE NONE DETECTED NA
02-B ENTRY SIDE WALL: SOFTER TYPE NONE DETECTED NA
LABORATORY ANALYTICAL REPORTS
SECTION 5
SAMPLING, ASSESSMENT, ANALYTICAL PROCEDURES
SECTION 6
Sampling Methodology A minimum of three representative bulk samples were collected for each homogeneous material. Each homogeneous material was assigned a number (1,2,3,etc.) and each sample for the material was assigned an alpha designation (A,B,C, etc.). Homogenous material determination was based on the following criteria:
• Similar physical characteristics (same color and texture, etc.)
• Application (sprayed-on, troweled-on, assembly into a system, etc.)
• Material function (Thermal insulation, floor tile, wallboard system, etc.)
Assessment Methodology Material condition was assessed in order to categorize each material in accordance with the National Emissions Standard for Hazardous Air Pollutants (NESHAP; 40 CFR Part 61). The NESHAP Standard is the federal regulation governing the proper handling and disposal of ACMs(ACM) during demolition and renovation activities.
PLM Analysis Methodology
Laboratory Services were provided by:
Triangle Environmental Service Center (TESC) 15549 Fox Cove Circle Mosely, VA 23120, TESC is a National Voluntary Laboratory Accreditation Program (NVLAP) certified laboratory. Samples were analyzed consecutively by alpha designation until a positive result was recorded for that material, at which time further analyses for that material were halted and the material was then identified by the laboratory as positive. If the analyst received a negative result, all samples in that alpha series were analyzed and the material was then designated as negative for asbestos content.
Analysis was performed by using the bulk sample for visual observation and slide preparation(s) for microscopic examination and identification. The samples were analyzed for asbestos (chrysotile, amosite, crocidolite, anthophyllite, and actinolite/tremolite), as well as fibrous non-asbestos constituents (mineral wool, cellulose, etc.) and non-fibrous constituents. Using a stereoscope, the microscopist visually estimated relative amounts of each constituent by determining the volume of each constituent in proportion to the total volume of the sample.
Physical or Other Limitations Some areas were not accessed during the on-site investigation. These areas are described as follows:
• Trenches, voids, crocks below grade (would require demolition for access)
PAINT TESTING
SECTION 7
M B
BUILDING DESCRIPTION ROOM EQUIVALENT
ID
B S
T R
A
COMPONENT
E
A D
IN
G
S / N
G
NA CALIBRATE: 1.0 NIST BLOCK NA NA WOOD NA 1.2 NA
NA CALIBRATE: 1.0 NIST BLOCK NA NA WOOD NA 1.0 NA
NA CALIBRATE: 1.0 NIST BLOCK NA NA WOOD NA 1.0 NA
O-1 OAKEY CABIN CABIN EXTERIOR B WOOD WINDOW FRAMING 0.3 NEG
O-1 OAKEY CABIN CABIN EXTERIOR B WOOD CORNER TRIM 0.3 NEG
O-1 OAKEY CABIN CABIN EXTERIOR B WOOD PICTURE WINDOW CASING 0.2 NEG
O-1 OAKEY CABIN CABIN EXTERIOR A WOOD HOUSE SOFFIT 0.0 NEG
O-1 OAKEY CABIN CABIN EXTERIOR A ASPHALT HOUSE WALL 0.2 NEG
O-1 OAKEY CABIN CABIN EXTERIOR B ASPHALT HOUSE WALL 0.0 NEG
O-1 OAKEY CABIN CABIN EXTERIOR C ASPHALT HOUSE WALL 0.1 NEG
O-1 OAKEY CABIN CABIN EXTERIOR D ASPHALT HOUSE WALL 0.2 NEG
O-1 OAKEY CABIN CABIN EXTERIOR A WOOD ENTRY DOOR 0.2 NEG
O-1 OAKEY CABIN CABIN EXTERIOR A WOOD ENTRY DOOR CASING 0.2 NEG
O-1 OAKEY CABIN CABIN EXTERIOR A WOOD ENTRY DOOR INTERIOR 3.8 POS
O-1 OAKEY CABIN CABIN BACK ROOM A WOOD DOOR 0.3 NEG
O-1 OAKEY CABIN CABIN BACK ROOM A WOOD DOOR CASING 0.0 NEG
O-1 OAKEY CABIN CABIN BACK ROOM A WOOD DOOR JAMB 0.2 NEG
O-1 OAKEY CABIN CABIN BACK ROOM D WOOD WINDOW FRAMING 0.2 NEG
O-1 OAKEY CABIN CABIN FRONT ROOM C WOOD WALL 0.3 NEG
O-1 OAKEY CABIN CABIN FRONT ROOM C WOOD PASSAGE CASING 0.4 NEG
O-1 OAKEY CABIN CABIN FRONT ROOM A WOOD DOOR CASING 0.4 NEG
O-1 OAKEY CABIN CABIN FRONT ROOM A WOOD WINDOW SASH 0.2 NEG
O-1 OAKEY CABIN CABIN FRONT ROOM D WOOD WINDOW SASH 0.1 NEG
INSPECTOR AND LABORATORY ACCREDITATION